Sections 1 to 1976 of 1976

Industry Review & Comment Process: SWS for Multi-Family Homes

Comment period closes on December 21, 2012

SWS Organized by Sections & Topics
  1. Sticky Thread Sticky: Building Code Review Information

    The Comment Period for this document closes on May 4th, 2012. Following this period, the Multifamily Standard Work Specifications (SWS) will undergo...

    The Comment Period for this document closes on May 4th, 2012. Following this period, the Multifamily Standard Work Specifications (SWS) will undergo...
  2. Sticky Thread Sticky: Referenced Standards

    Referenced Standards can be found in the following attachments. The standards can be searched via Specification Line Number, or by Standard Name.

    Referenced Standards can be found in the following attachments. The standards can be searched via Specification Line Number, or by Standard Name.
  1. 1.1 Global Worker Safety

    Topic: Safe Work Practices Subtopic: Safe Work Practices Global Worker Safety 1.1 Detail Name: Global Worker Safety Desired Outcome: Work...

    Topic: Safe Work Practices Subtopic: Safe Work Practices Global Worker Safety 1.1 Detail Name: Global Worker Safety Desired Outcome: Work...
  2. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.10: Ergonomic safety

    Appropriate PPE will be used (e.g., knee pads, bump caps, additional padding) Proper equipment will be used for work Proper lifting techniques...

    Appropriate PPE will be used (e.g., knee pads, bump caps, additional padding) Proper equipment will be used for work Proper lifting techniques...
  3. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.11: Hand tool safety

    Hand tools will be used for intended purpose

    Hand tools will be used for intended purpose
  4. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.12 : Slips, trips, and falls

    Caution will be used around power cords, hoses, tarps and plastic sheeting Precautions will be taken when ladders are used, when working at...

    Caution will be used around power cords, hoses, tarps and plastic sheeting Precautions will be taken when ladders are used, when working at...
  5. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.13 : Heat and thermal stress

    Appropriate ventilation, hydration, rest breaks and cooling equipment will be provided 911 will be dialed when necessary

    Appropriate ventilation, hydration, rest breaks and cooling equipment will be provided 911 will be dialed when necessary
  6. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.14: Fire safety

    Ignition sources will be identified and eliminated (e.g., turn off pilot lights and fuel supply) Use of flammable material will be reduced and...

    Ignition sources will be identified and eliminated (e.g., turn off pilot lights and fuel supply) Use of flammable material will be reduced and...
  7. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.15: Asbestos-Containing Materials (ACM)

    Assess potential asbestos hazard. If unsure whether material contains asbestos, contact a qualified asbestos professional to assess the material and...

    Assess potential asbestos hazard. If unsure whether material contains asbestos, contact a qualified asbestos professional to assess the material and...
  8. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.16: Lead paint assessment

    Presence of lead based paint in pre‐1978 homes will be assumed unless testing confirms otherwise The Environmental Protection Agency (EPA)...

    Presence of lead based paint in pre‐1978 homes will be assumed unless testing confirms otherwise The Environmental Protection Agency (EPA)...
  9. Safe Work Practices > Safe Work Practices : Global Worker Safety

    1.1.1: Prevention through design

    Design will be incorporated to eliminate or minimize hazards (e.g., material selection, access to equipment for installation and maintenance,...

    Design will be incorporated to eliminate or minimize hazards (e.g., material selection, access to equipment for installation and maintenance,...
  10. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.2 : Hand protection

    Durable and wrist-protecting gloves will be worn that can withstand work activity

    Durable and wrist-protecting gloves will be worn that can withstand work activity
  11. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.3: Respiratory protection

    If the risk of airborne contaminants cannot be prevented, proper respiratory protection will be provided and worn (e.g., N-95 or equivalent face...

    If the risk of airborne contaminants cannot be prevented, proper respiratory protection will be provided and worn (e.g., N-95 or equivalent face...
  12. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.4: Electrical safety

    An electrical safety assessment will be performed All electric tools will be protected by ground-fault circuit interrupters (GFCI) Three-wire...

    An electrical safety assessment will be performed All electric tools will be protected by ground-fault circuit interrupters (GFCI) Three-wire...
  13. Health and Safety > Safe Work Practices 1.100: Global Worker Safety

    1.1.5: Carbon Monoxide

    All homes will have a carbon monoxide alarm Ambient CO will be monitored during combustion testing and testing will be discontinued if ambient CO...

    All homes will have a carbon monoxide alarm Ambient CO will be monitored during combustion testing and testing will be discontinued if ambient CO...
  14. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.6: Protective clothing

    MSDSs and OSHA regulations will be consulted for protective clothing and equipment Eye protection will always be worn (e.g., safety glasses,...

    MSDSs and OSHA regulations will be consulted for protective clothing and equipment Eye protection will always be worn (e.g., safety glasses,...
  15. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.7: Confined space safety

    Access and egress points will be located before beginning work Inspection will be conducted for frayed electrical wires Adequate ventilation...

    Access and egress points will be located before beginning work Inspection will be conducted for frayed electrical wires Adequate ventilation...
  16. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.8: Power tool safety

    Power tools will be inspected and used in accordance with manufacturer specifications to eliminate hazards associated with missing ground prongs,...

    Power tools will be inspected and used in accordance with manufacturer specifications to eliminate hazards associated with missing ground prongs,...
  17. Safe Work Practices > Safe Work Practices 1.100.1: Global Worker Safety

    1.1.9: Chemical Safety

    Hazardous materials will be handled in accordance with manufacturer specifications or MSDS standards to eliminate hazards associated with volatile...

    Hazardous materials will be handled in accordance with manufacturer specifications or MSDS standards to eliminate hazards associated with volatile...
  18. 2.1 Code Compliance

    Topic: General (Applies to all SWS) Subtopic: All Work Specifications Enclosure 2.1 Detail Name: Code Compliance Desired Outcome:...

    Topic: General (Applies to all SWS) Subtopic: All Work Specifications Enclosure 2.1 Detail Name: Code Compliance Desired Outcome:...
  19. General (Applies to all SWS) > All Work Specifications 2.1: Code Compliance

    2.1.1: Code review

    Applicable codes and specifications will be reviewed Applicable codes will be followed. An alternative material, design or method of construction...

    Applicable codes and specifications will be reviewed Applicable codes will be followed. An alternative material, design or method of construction...
  20. 2.10 Above Roof Deck Air Sealing

    Topic: Air Sealing Subtopic: Roof 2.10 Detail Name: Above Roof Deck Air Sealing Desired Outcome: Continuous air, thermal and moisture...

    Topic: Air Sealing Subtopic: Roof 2.10 Detail Name: Above Roof Deck Air Sealing Desired Outcome: Continuous air, thermal and moisture...
  21. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.1: Worker safety

    Worker safety specifications will be in accordance with Global Worker Safety SWS

    Worker safety specifications will be in accordance with Global Worker Safety SWS
  22. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.2: Occupant safety

    An occupant safety plan will be prepared, reviewed with and approved by building operators and implemented throughout production

    An occupant safety plan will be prepared, reviewed with and approved by building operators and implemented throughout production
  23. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.3: Pre-inspection

    Existing roof water management system will be identified Plans will be made for future water management system Existing roof system will be...

    Existing roof water management system will be identified Plans will be made for future water management system Existing roof system will be...
  24. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.4: Roof covering removal

    Existing roof covering will be removed

    Existing roof covering will be removed
  25. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.5: Sealing

    If the existing roof deck can be used as an air barrier- joints, seams, holes, gaps and penetrations will be sealed with sealants compatible with...

    If the existing roof deck can be used as an air barrier- joints, seams, holes, gaps and penetrations will be sealed with sealants compatible with...
  26. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.6: Installation of insulation

    Insulation will be installed in accordance with manufacturer specifications without gaps, voids, compressions, misalignments or exposure to wind...

    Insulation will be installed in accordance with manufacturer specifications without gaps, voids, compressions, misalignments or exposure to wind...
  27. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.7: Roof covering replacement

    New roof covering will be installed in accordance with manufacturer specifications and local building code requirements

    New roof covering will be installed in accordance with manufacturer specifications and local building code requirements
  28. Air Sealing > Roof 2.10: Above Roof Deck Air Sealing

    2.10.8: Building operation staff education

    Documentation of material and R-value will be provided to building operations staff

    Documentation of material and R-value will be provided to building operations staff
  29. 2.11 Sealing and Insulating of Exterior Roof Access Panels and Hatches

    Topic: Air Sealing Subtopic: Roof 2.11 Detail Name: Sealing and Insulating of Exterior Roof Access Panels and Hatches Desired Outcome: Roof...

    Topic: Air Sealing Subtopic: Roof 2.11 Detail Name: Sealing and Insulating of Exterior Roof Access Panels and Hatches Desired Outcome: Roof...
  30. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  31. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented
  32. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.3: Pre-inspection

    Location of air and thermal boundary will be identified in the attic and it will be determined if roof access intersects that boundary Roof access...

    Location of air and thermal boundary will be identified in the attic and it will be determined if roof access intersects that boundary Roof access...
  33. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.4: Roof access operation and fit

    Roof access will be adjusted or repaired to properly fit the curb/jamb and allow for ease of operation (e.g., hardware adjustment and/or replacement)

    Roof access will be adjusted or repaired to properly fit the curb/jamb and allow for ease of operation (e.g., hardware adjustment and/or replacement)
  34. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.5: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  35. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.6: Frame/curb sealing

    Roof access frame/curb will be sealed to prevent water and air intrusion to both the exterior and interior side of the roof/wall Roof access stop...

    Roof access frame/curb will be sealed to prevent water and air intrusion to both the exterior and interior side of the roof/wall Roof access stop...
  36. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.7: Weatherstripping

    Appropriate weatherstripping materials will be used Durable weatherstripping material will be sized to span irregularities in the frame/curb as...

    Appropriate weatherstripping materials will be used Durable weatherstripping material will be sized to span irregularities in the frame/curb as...
  37. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.8: Insulation

    Access hatches will be insulated with noncompressible insulation to an R-value sufficient to prevent condensation on either conditioned or...

    Access hatches will be insulated with noncompressible insulation to an R-value sufficient to prevent condensation on either conditioned or...
  38. Air Sealing > Roof 2.11: Sealing and Insulating of Exterior Roof Access Panels and Hatches

    2.11.9: Quality assurance

    Roof access will be adjusted to properly fit the jamb and allow for ease of operation and security Roof access system will be tested for air...

    Roof access will be adjusted to properly fit the jamb and allow for ease of operation and security Roof access system will be tested for air...
  39. 2.12 Roof/Exterior Wall Connection, including Joints at Roof/Parapet/Wall Connections

    Topic: Air Sealing Subtopic: Roof 2.12 Detail Name: Roof/Exterior Wall Connection, including Joints at Roof/Parapet/Wall Connections ...

    Topic: Air Sealing Subtopic: Roof 2.12 Detail Name: Roof/Exterior Wall Connection, including Joints at Roof/Parapet/Wall Connections ...
  40. Air Sealing > Roof 2.12: Roof/Exterior Wall Connection

    2.12.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Existing water control measures will be identified Air sealing locations will be identified...

    Incorporate SWS Topic “General, Pre-inspection” Existing water control measures will be identified Air sealing locations will be identified...
  41. Air Sealing > Roof 2.12: Roof/Exterior Wall Connection

    2.12.2: Backing and infill

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...
  42. Air Sealing > Roof 2.12: Roof/Exterior Wall Connection

    2.12.3: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  43. Air Sealing > Roof 2.12: Roof/Exterior Wall Connection

    2.12.4: Joint seal

    Continuous seal will be installed at roof/exterior wall junctions or roof/ exterior and wall/ parapet junctions including, but not limited to, beams,...

    Continuous seal will be installed at roof/exterior wall junctions or roof/ exterior and wall/ parapet junctions including, but not limited to, beams,...
  44. Air Sealing > Roof 2.13: Roof/Parapet Wall Connection

    2.12.5: Cavity seal

    For framed parapets that are open between conditioned and unconditioned space, the parapet/wall cavity will be accessed and an internal air barrier...

    For framed parapets that are open between conditioned and unconditioned space, the parapet/wall cavity will be accessed and an internal air barrier...
  45. 2.14 Skylights and Shafts

    Topic: Air Sealing Subtopic: Attics 2.14 Detail Name: Skylights and Shafts Desired Outcome: Maintain the integrity of the glazing system...

    Topic: Air Sealing Subtopic: Attics 2.14 Detail Name: Skylights and Shafts Desired Outcome: Maintain the integrity of the glazing system...
  46. Air Sealing > Attics 2.14: Skylights and Shafts

    2.14.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  47. Air Sealing > Attics 2.14: Skylights and Shafts

    2.14.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented
  48. Air Sealing > Attics 2.14: Skylights and Shafts

    2.14.3: Pre-inspection

    Glazing systems and curbs will be inspected for air and water leakage, integrity, proper operation and security Repairs will be completed before...

    Glazing systems and curbs will be inspected for air and water leakage, integrity, proper operation and security Repairs will be completed before...
  49. Air Sealing > Attics 2.14: Skylights and Shafts

    2.14.4: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  50. Air Sealing > Attics 2.14: Skylights and Shafts

    2.14.5: Sealing

    Holes and penetrations will be sealed Bypasses will be blocked and sealed Holes within fire resistance rated assemblies will be filled with a...

    Holes and penetrations will be sealed Bypasses will be blocked and sealed Holes within fire resistance rated assemblies will be filled with a...
  51. Air Sealing > Attics 2.14: Skylights and Shafts

    2.14.6: Installation

    Insulation will be installed in accordance with manufacturer specifications and in full contact with all sides of existing cavity without gaps,...

    Insulation will be installed in accordance with manufacturer specifications and in full contact with all sides of existing cavity without gaps,...
  52. Air Sealing > Attics 2.14: Skylights and Shafts

    2.14.7: Building operations staff education

    Documentation of material and R-value will be provided to building operations staff

    Documentation of material and R-value will be provided to building operations staff
  53. 2.15 Penetrations and Chases

    Topic: Air Sealing Subtopic: Attics 2.15 Detail Name: Penetrations and Chases Desired Outcome: Penetrations and chases sealed to...

    Topic: Air Sealing Subtopic: Attics 2.15 Detail Name: Penetrations and Chases Desired Outcome: Penetrations and chases sealed to...
  54. Air Sealing > Attics 2.15: Penetrations and Chases

    2.15.1: Pre-inspection

    Specification(s): Incorporate SWS Topic General, Pre-inspection Gaps, cracks and holes in fire separations located within the work area will be...

    Specification(s): Incorporate SWS Topic General, Pre-inspection Gaps, cracks and holes in fire separations located within the work area will be...
  55. Air Sealing > Attics 2.15: Penetrations and Chases

    2.15.2: Backing and infill

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...
  56. Air Sealing > Attics 2.15: Penetrations and Chases

    2.15.3: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  57. Air Sealing > Attics 2.15: Penetrations and Chases

    2.15.4: High temperature application

    Only noncombustible sealant will be used in contact with chimneys, vents and flues or any heat source (e.g., non IC rated recessed lights, heat...

    Only noncombustible sealant will be used in contact with chimneys, vents and flues or any heat source (e.g., non IC rated recessed lights, heat...
  58. 2.16 Firewall in Unconditioned Attic

    Topic: Air Sealing Subtopic: Attics 2.16 Detail Name: Firewall in Unconditioned Attic Desired Outcome: Firewall separations in unconditioned...

    Topic: Air Sealing Subtopic: Attics 2.16 Detail Name: Firewall in Unconditioned Attic Desired Outcome: Firewall separations in unconditioned...
  59. Air Sealing > Attics 2.16: Firewall in Unconditioned Attic

    2.16.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  60. Air Sealing > Attics 2.16: Firewall in Unconditioned Attic

    2.16.2: Backing and infill

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...
  61. Air Sealing > Attics 2.16: Firewall in Unconditioned Attic

    2.16.3: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  62. Air Sealing > Attics 2.16: Firewall in Unconditioned Attic

    2.16.4: Joint seal

    Continuous seal will be installed around seams, cracks, joints, edges, penetrations and connections at: • The intersection between firewall and...

    Continuous seal will be installed around seams, cracks, joints, edges, penetrations and connections at: • The intersection between firewall and...
  63. 2.17 Firewall in Conditioned Attic

    Topic: Air Sealing Subtopic: Attics 2.17 Detail Name: Firewall in Conditioned Attic Desired Outcome: Firewalls sealed to prevent air...

    Topic: Air Sealing Subtopic: Attics 2.17 Detail Name: Firewall in Conditioned Attic Desired Outcome: Firewalls sealed to prevent air...
  64. Air Sealing > Attics 2.17: Firewall in Conditioned Attic

    2.17.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  65. Air Sealing > Attics 2.17: Firewall in Conditioned Attic

    2.17.2: Backing and infill

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...
  66. Air Sealing > Attics 2.17: Firewall in Conditioned Attic

    2.17.3: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  67. Air Sealing > Attics 2.17: Firewall in Conditioned Attic

    2.17.4: Joint seal

    Continuous seal will be installed around seams, cracks, joints, edges, penetrations and connections at: • The intersection between firewall and...

    Continuous seal will be installed around seams, cracks, joints, edges, penetrations and connections at: • The intersection between firewall and...
  68. 2.18 Insulating around High Temperature Devices, Systems and Components

    Topic: Air Sealing Subtopic: Attics 2.18 Detail Name: Insulating around High Temperature Devices, Systems and Components Desired...

    Topic: Air Sealing Subtopic: Attics 2.18 Detail Name: Insulating around High Temperature Devices, Systems and Components Desired...
  69. Air Sealing > Attics 2.18: Fireplace Chimney and Combustion Flue Vents

    2.18.1: Pre-Inspection

    Incorporate SWS Topic “General, Pre-inspection” Confirm that flues or other high temperature elements are functioning as designed and do not...

    Incorporate SWS Topic “General, Pre-inspection” Confirm that flues or other high temperature elements are functioning as designed and do not...
  70. Air Sealing > Attics 2.18: Fireplace Chimney and Combustion Flue Vents

    2.18.2: Verify attic prep

    Confirm that only noncombustible sealant has been used in contact with chimneys, vents and flues or any heat source (e.g., non IC rated recessed...

    Confirm that only noncombustible sealant has been used in contact with chimneys, vents and flues or any heat source (e.g., non IC rated recessed...
  71. Air Sealing > Attics 2.18: Fireplace Chimney and Combustion Flue Vents

    2.18.3: Isolate high temperature elements

    A rigid dam having a height greater than the insulation to be installed will be constructed to ensure a 3” clearance between combustion flue vent and...

    A rigid dam having a height greater than the insulation to be installed will be constructed to ensure a 3” clearance between combustion flue vent and...
  72. Air Sealing > Attics 2.18: Insulating around High Temperature Devices, Systems and Components

    2.18.4: Sealant Selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  73. Air Sealing > Attics 2.18: Fireplace Chimney and Combustion Flue Vents

    2.18.5: Safety

    Insulation will not be allowed between a heat-generating appliance and a dam unless material is rated for contact with heat generating sources

    Insulation will not be allowed between a heat-generating appliance and a dam unless material is rated for contact with heat generating sources
  74. Air Sealing > Attics 2.18: Fireplace Chimney and Combustion Flue Vents

    2.18.6: Building operations staff education

    Documentation of material and R-value will be provided to building operations staff

    Documentation of material and R-value will be provided to building operations staff
  75. 2.19 Sealing Access Doors and Similar Intentional Penetrations

    Topic: Air Sealing Subtopic: Attics 2.19 Detail Name: Sealing Access Doors and Similar Intentional Penetrations Desired Outcome: Attic...

    Topic: Air Sealing Subtopic: Attics 2.19 Detail Name: Sealing Access Doors and Similar Intentional Penetrations Desired Outcome: Attic...
  76. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.10: Building operations staff/occupant education

    Purpose of insulation and proper hatch operation will be communicated to building operations staff and occupant

    Purpose of insulation and proper hatch operation will be communicated to building operations staff and occupant
  77. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  78. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented
  79. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.3: Pre-inspection

    If attic access is below the air and thermal boundary, the roof access will be in accordance with the Roof Access SWS If attic access is part of...

    If attic access is below the air and thermal boundary, the roof access will be in accordance with the Roof Access SWS If attic access is part of...
  80. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.4: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  81. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.5: Sealing

    Access hatch frames will be sealed using caulk, gasket, weatherstrip or otherwise sealed with an air barrier material suitable film or solid material...

    Access hatch frames will be sealed using caulk, gasket, weatherstrip or otherwise sealed with an air barrier material suitable film or solid material...
  82. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.6: Installation

    Access hatches will be insulated with noncompressible insulation to the same R-value as adjoining insulated assembly Attic hatch rough opening...

    Access hatches will be insulated with noncompressible insulation to the same R-value as adjoining insulated assembly Attic hatch rough opening...
  83. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.7: Attachment

    Insulation will be permanently attached and in complete contact with the air barrier

    Insulation will be permanently attached and in complete contact with the air barrier
  84. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.8: Quality assurance

    Attic access will be adjusted to properly fit the jamb and allow for ease of operation and security Attic access system will be tested for air...

    Attic access will be adjusted to properly fit the jamb and allow for ease of operation and security Attic access system will be tested for air...
  85. Air Sealing > Attics 2.19: Sealing Access Doors and Similar Intentional Penetrations

    2.19.9: Durability

    Completed measure will be a minimum expected service life of 20 years

    Completed measure will be a minimum expected service life of 20 years
  86. 2.2 Work Area Inspection and Stabilization

    Topic: General (Applies to all SWS) Subtopic: Pre-Inspection 2.2 Detail Name: Work Area Inspection and Stabilization Desired Outcome:...

    Topic: General (Applies to all SWS) Subtopic: Pre-Inspection 2.2 Detail Name: Work Area Inspection and Stabilization Desired Outcome:...
  87. General (Applies to all SWS) > Pre-Inspection 2.2: Work Area Inspection and Stabilization

    2.2.1: Inspection to confirm integrity of existing building assembly

    An inspection will be conducted for existing conditions that may be unsuitable for successful installation of proposed energy improvement

    An inspection will be conducted for existing conditions that may be unsuitable for successful installation of proposed energy improvement
  88. Topic: General (Applies to all SWS) > Subtopic: Pre-Inspection 2.2: Work Area Inspection and Stabilization

    2.2.2: Identify hazardous construction materials that may be disturbed or compromised by proposed work

    The inspection will include determination of the presence of known or presumed hazardous construction materials including lead paint, asbestos, and...

    The inspection will include determination of the presence of known or presumed hazardous construction materials including lead paint, asbestos, and...
  89. Topic: General (Applies to all SWS) > Subtopic: Pre-Inspection 2.2: Work Area Inspection and Stabilization

    2.2.3: Identify environmental conditions that may create or worsen unsafe or unstable building assembly conditions

    The inspection will include determination of the presence of adverse environmental conditions including excess moisture in contact with building...

    The inspection will include determination of the presence of adverse environmental conditions including excess moisture in contact with building...
  90. Topic: General (Applies to all SWS) > Subtopic: Pre-Inspection 2.2: Work Area Inspection and Stabilization

    2.2.4: Address and correct hazardous or adverse conditions

    Where excess moisture conditions are identified where their correction is not included in proposed work, such conditions will be corrected before...

    Where excess moisture conditions are identified where their correction is not included in proposed work, such conditions will be corrected before...
  91. 2.21 Air Sealing Complex Ceiling Planes

    Topic: Air Sealing Subtopic: Ceilings and Soffits 2.21 Detail Name: Air Sealing Complex Ceiling Planes Desired Outcome: Configuration of...

    Topic: Air Sealing Subtopic: Ceilings and Soffits 2.21 Detail Name: Air Sealing Complex Ceiling Planes Desired Outcome: Configuration of...
  92. Air Sealing > Ceilings and Soffits 2.21: Complex Ceilings

    2.21.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  93. Air Sealing > Ceilings and Soffits 2.21: Air Sealing Complex Ceiling Planes

    2.21.2: Locate air sealing plane

    Work area will be cleared of existing insulation to locate and identify the optimal air sealing plane Elevation changes including interior...

    Work area will be cleared of existing insulation to locate and identify the optimal air sealing plane Elevation changes including interior...
  94. Air Sealing > Ceilings and Soffits 2.21: Complex Ceilings

    2.21.3: Spanning Material Selection

    Materials used to span elevation changes will be rigid and self-supporting over the distance spanned. Materials will be consistent with existing or...

    Materials used to span elevation changes will be rigid and self-supporting over the distance spanned. Materials will be consistent with existing or...
  95. Air Sealing > Ceilings and Soffits 2.21: Complex Ceilings

    2.21.4: Support

    Support material will be installed for spans wider than 24” except when air barrier material is rated to span greater distance under load (e.g.,...

    Support material will be installed for spans wider than 24” except when air barrier material is rated to span greater distance under load (e.g.,...
  96. Air Sealing > Ceilings and Soffits 2.21: Complex Ceilings

    2.21.5: Joint Seal

    Continuous seal will be installed around seams, cracks, joints, edges, penetrations and connections Pre-fabricated units may be used when meeting...

    Continuous seal will be installed around seams, cracks, joints, edges, penetrations and connections Pre-fabricated units may be used when meeting...
  97. Air Sealing > Ceilings and Soffits 2.21: Air Sealing Complex Ceiling Planes

    2.21.6: Sealant Selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  98. Air Sealing > Ceilings and Soffits 2.21: Complex Ceilings

    2.21.7: Adjacent framing

    All remaining gaps will be sealed at the top of the dropped ceiling

    All remaining gaps will be sealed at the top of the dropped ceiling
  99. 2.22 Wall Penetration Sealing

    Topic: Air Sealing Subtopic: Walls 2.22 Detail Name: Wall Penetration Sealing Desired Outcome: Wall penetrations sealed to prevent air...

    Topic: Air Sealing Subtopic: Walls 2.22 Detail Name: Wall Penetration Sealing Desired Outcome: Wall penetrations sealed to prevent air...
  100. Air Sealing > Walls 2.22: Wall Penetration Sealing

    2.22.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  101. Air Sealing > Walls 2.22: Wall Penetration Sealing

    2.22.2: Backing and infill

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...
  102. Air Sealing > Walls 2.22: Wall Penetration Sealing

    2.22.3: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  103. Air Sealing > Walls 2.22: Wall Penetration Sealing

    2.22.4: High temperature application

    Only noncombustible sealant will be used in contact with chimneys, vents and flues or any heat source (e.g. non IC rated recessed lights, heat lamps,...

    Only noncombustible sealant will be used in contact with chimneys, vents and flues or any heat source (e.g. non IC rated recessed lights, heat lamps,...
  104. Air Sealing > Walls 2.22: Wall Penetration Sealing

    2.22.5: Penetration seal

    Continuous seal will be installed around seams, cracks, joints, edges and penetrations When a penetration goes all of the way through a wall,...

    Continuous seal will be installed around seams, cracks, joints, edges and penetrations When a penetration goes all of the way through a wall,...
  105. 2.23 Repair, Maintenance and Weatherstripping of Windows

    Topic: Air Sealing Subtopic: Windows 2.23 Detail Name: Repair, Maintenance and Weatherstripping of Windows Desired Outcome: Windows are air...

    Topic: Air Sealing Subtopic: Windows 2.23 Detail Name: Repair, Maintenance and Weatherstripping of Windows Desired Outcome: Windows are air...
  106. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  107. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...
  108. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.3: Pre-inspection

    Glazing systems will be inspected for air and water leakage, warping, stability, no holes, hardware operates properly, proper operation and...

    Glazing systems will be inspected for air and water leakage, warping, stability, no holes, hardware operates properly, proper operation and...
  109. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.4: Operable glazing system operation and fit

    Operable glazing system will be adjusted or repaired to properly fit the jamb and allow for ease of operation (e.g., hardware adjustment and/or...

    Operable glazing system will be adjusted or repaired to properly fit the jamb and allow for ease of operation (e.g., hardware adjustment and/or...
  110. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.5: Fixed glazing system adjustment and seal

    Fixed glazing system will be adjusted or repaired to properly fit the jamb In the event the fixed glazing unit has shifted enough to allow light...

    Fixed glazing system will be adjusted or repaired to properly fit the jamb In the event the fixed glazing unit has shifted enough to allow light...
  111. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.6: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  112. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.7: Frame sealing

    When the glazing system trim/frame leaks at wall, the glazing system trim/frame will be sealed to the exterior and/or interior side of the wall ...

    When the glazing system trim/frame leaks at wall, the glazing system trim/frame will be sealed to the exterior and/or interior side of the wall ...
  113. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.8: Weatherstripping

    All weatherstripping will be an effective air barrier Durable weatherstripping material will be sized to span irregularities in the glazing system...

    All weatherstripping will be an effective air barrier Durable weatherstripping material will be sized to span irregularities in the glazing system...
  114. Air Sealing > Walls 2.23: Repair, Maintenance and Weatherstripping of Windows

    2.23.9: Quality assurance

    Glazing system will be adjusted to properly fit the jamb and allow for ease of operation and security Glazing system will be tested for air...

    Glazing system will be adjusted to properly fit the jamb and allow for ease of operation and security Glazing system will be tested for air...
  115. 2.24 Repair, Maintenance and Weatherstripping of Doors

    Topic: Air Sealing Subtopic: Doors 2.24 Detail Name: Repair, Maintenance and Weatherstripping of Doors Desired Outcome: Doors operable, air...

    Topic: Air Sealing Subtopic: Doors 2.24 Detail Name: Repair, Maintenance and Weatherstripping of Doors Desired Outcome: Doors operable, air...
  116. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  117. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...
  118. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.3: Pre-inspection

    Door system will be inspected for air and water leakage, warping, stability, no holes, hardware operating properly, proper operation and security; if...

    Door system will be inspected for air and water leakage, warping, stability, no holes, hardware operating properly, proper operation and security; if...
  119. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.4: Door operation and fit

    Door will be adjusted or repaired to properly fit the jamb and allow for ease of operation (e.g., hardware adjustment and/or replacement, replane...

    Door will be adjusted or repaired to properly fit the jamb and allow for ease of operation (e.g., hardware adjustment and/or replacement, replane...
  120. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.5: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  121. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.6: Frame sealing

    When the door trim/frame leaks at wall, the door trim/frame will be sealed to both the exterior and interior side of the wall Door stop will be...

    When the door trim/frame leaks at wall, the door trim/frame will be sealed to both the exterior and interior side of the wall Door stop will be...
  122. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.7: Weatherstripping

    All weatherstripping will be an effective air barrier Durable weatherstripping material will be sized to span irregularities in the door/frame as...

    All weatherstripping will be an effective air barrier Durable weatherstripping material will be sized to span irregularities in the door/frame as...
  123. Air Sealing > Doors 2.24: Repair, Maintenance and Weatherstripping of Doors

    2.24.8: Quality assurance

    Door will be adjusted to properly fit the jamb and allow for ease of operation and security Door system will be tested for air leakage in...

    Door will be adjusted to properly fit the jamb and allow for ease of operation and security Door system will be tested for air leakage in...
  124. 2.25 Window Replacement

    Topic: Air Sealing Subtopic: Windows 2.25 Detail Name: Window Replacement Desired Outcome: Maintain a continuous air and thermal barrier and...

    Topic: Air Sealing Subtopic: Windows 2.25 Detail Name: Window Replacement Desired Outcome: Maintain a continuous air and thermal barrier and...
  125. Air Sealing > Windows 2.25: Window Replacement

    2.25.1: Design considerations

    Glazing type will be chosen by location in the building, building height, code and climate Window frame will be insulated and selected with...

    Glazing type will be chosen by location in the building, building height, code and climate Window frame will be insulated and selected with...
  126. Air Sealing > Windows 2.25: Window Replacement

    2.25.2: Pre-Inspection

    Incorporate SWS Topic “General, Pre-inspection”

    Incorporate SWS Topic “General, Pre-inspection”
  127. Air Sealing > Windows 2.25: Window Replacement

    2.25.3: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  128. Air Sealing > Windows 2.25: Window Replacement

    2.25.4: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...
  129. Air Sealing > Windows 2.25: Window Replacement

    2.25.5: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  130. Air Sealing > Windows 2.25: Window Replacement

    2.25.6: Window location, installation and sealing

    Glazing system frame will be aligned with the wall system’s air and thermal barrier to create a continuous air and thermal barrier Glazing system...

    Glazing system frame will be aligned with the wall system’s air and thermal barrier to create a continuous air and thermal barrier Glazing system...
  131. Air Sealing > Windows 2.25: Window Replacement

    2.25.7: Quality assurance

    A sampling protocol will be used to test glazing system for air leakage in accordance with ASTM E783-02 A sampling protocol will be used to test...

    A sampling protocol will be used to test glazing system for air leakage in accordance with ASTM E783-02 A sampling protocol will be used to test...
  132. 2.26 Exterior Door Replacement

    Topic: Windows and Doors Subtopic: Doors 2.26 Detail Name: Exterior Door Replacement Desired Outcome: Exterior door selection and...

    Topic: Windows and Doors Subtopic: Doors 2.26 Detail Name: Exterior Door Replacement Desired Outcome: Exterior door selection and...
  133. Windows and Doors > Doors 2.26: Exterior Door Replacement

    2.26.1: Design considerations

    Door/glass will be selected by location in the building, building height, code and climate Door frame will be insulated and selected with thermal...

    Door/glass will be selected by location in the building, building height, code and climate Door frame will be insulated and selected with thermal...
  134. Windows and Doors > Doors 2.26: Exterior Door Replacement

    2.26.2: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  135. Windows and Doors > Doors 2.26: Exterior Door Replacement

    2.26.3: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented Occupant will be notified...
  136. Windows and Doors > Doors 2.26: Exterior Door Replacement

    2.26.4: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  137. Windows and Doors > Doors 2.26: Exterior Door Replacement

    2.26.5: Door location, installation and sealing

    Door frame will be aligned with the wall system’s air and thermal barrier to create a continuous air and thermal barrier Door system will be...

    Door frame will be aligned with the wall system’s air and thermal barrier to create a continuous air and thermal barrier Door system will be...
  138. Windows and Doors > Doors 2.26: Exterior Door Replacement

    2.26.6: Quality assurance

    Door will be adjusted to properly fit the jamb and allow for ease of operation and security A sampling protocol will be used to test door system...

    Door will be adjusted to properly fit the jamb and allow for ease of operation and security A sampling protocol will be used to test door system...
  139. 2.27 General Compartmentalization Techniques

    Topic: Air Sealing Subtopic: Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms,...

    Topic: Air Sealing Subtopic: Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms,...
  140. Air Sealing > Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms, kitchens, elevator shafts, laundry rooms, scheduled occupancy rooms) 2.27: 2.27 Detail Name: General

    2.27.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  141. Air Sealing > Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms, kitchens, elevator shafts, laundry rooms, scheduled occupancy rooms) 2.27: General Compartmentalization Techniques

    2.27.2: Identification of penetrations

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009))

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009))
  142. Air Sealing > Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms, kitchens, elevator shafts, laundry rooms, scheduled occupancy rooms) 2.27: General Compartmentalization Techniques

    2.27.3: Preparation

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...
  143. Air Sealing > Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms, kitchens, elevator shafts, laundry rooms, scheduled occupancy rooms) 2.27: General Compartmentalization Techniques

    2.27.4: Sealant and materials selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...
  144. Air Sealing > Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms, kitchens, elevator shafts, laundry rooms, scheduled occupancy rooms) 2.27: General Compartmentalization Techniques

    2.27.5: Installation, sealant and materials selection

    This is a duplicate entry of 2.27.4

    This is a duplicate entry of 2.27.4
  145. Air Sealing > Compartmentalization (Any room or space that needs to be isolated from other rooms or spaces e.g. mechanical rooms, kitchens, elevator shafts, laundry rooms, scheduled occupancy rooms) 2.27: General Compartmentalization Techniques

    2.27.6: Verification

    Repairs will be verified by visual inspections, infrared thermography, smoke and/or pressure tests consistent with the pre-inspection

    Repairs will be verified by visual inspections, infrared thermography, smoke and/or pressure tests consistent with the pre-inspection
  146. 2.28 Performance-Based Air Sealing of Dwelling Units and Corridors

    Topic: Air Sealing Subtopic: Compartmentalization 2.28 Detail Name: Performance-Based Air Sealing of Dwelling Units and Corridors Desired...

    Topic: Air Sealing Subtopic: Compartmentalization 2.28 Detail Name: Performance-Based Air Sealing of Dwelling Units and Corridors Desired...
  147. Air Sealing > Compartmentalization 2.28: Performance-Based Air Sealing of Dwelling Units and Corridors

    2.28.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  148. Air Sealing > Compartmentalization 2.28: Performance-Based Air Sealing of Dwelling Units and Corridors

    2.28.2: Work coordination among trades

    Work will be coordinated with all other trades performing work in compartmentalized spaces to schedule any required systemwide test-out verification

    Work will be coordinated with all other trades performing work in compartmentalized spaces to schedule any required systemwide test-out verification
  149. Air Sealing > Compartmentalization 2.28: Performance-Based Air Sealing of Dwelling Units and Corridors

    2.28.3: Preparation

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...
  150. Air Sealing > Compartmentalization 2.28: Performance-Based Air Sealing of Dwelling Units and Corridors

    2.28.4: Identification of penetrations

    Unit or corridor air leakage will be measured and penetrations identified using pressure tests ASTM E1186-03 (2009). Note: work will preserve...

    Unit or corridor air leakage will be measured and penetrations identified using pressure tests ASTM E1186-03 (2009). Note: work will preserve...
  151. Air Sealing > Compartmentalization 2.28: Performance-Based Air Sealing of Dwelling Units and Corridors

    2.28.5: Installation, sealant and materials selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...
  152. Air Sealing > Compartmentalization 2.28: Performance-Based Air Sealing of Dwelling Units and Corridors

    2.28.6: Verification

    Repairs will be verified by pressure tests consistent with the pre-inspection Any pressure balance test-out verification will be performed after...

    Repairs will be verified by pressure tests consistent with the pre-inspection Any pressure balance test-out verification will be performed after...
  153. Air Sealing > Compartmentalization 2.28: Performance-Based Air Sealing of Dwelling Units and Corridors

    2.28.7: Property manager/occupant education

    Documentation of material and maintenance requirements will be provided to property manager/occupant, as appropriate

    Documentation of material and maintenance requirements will be provided to property manager/occupant, as appropriate
  154. 2.29 Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or structural components, includes dumbwaiters and trash chutes)

    Topic: Air Sealing Subtopic: Compartmentalization 2.29 Detail Name: : Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or...

    Topic: Air Sealing Subtopic: Compartmentalization 2.29 Detail Name: : Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or...
  155. Air Sealing > Compartmentalization 2.29: Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or structural components, includes dumbwaiters and trash chutes)

    2.29.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  156. Air Sealing > Compartmentalization 2.29: Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or structural components, includes dumbwaiters and trash chutes)

    2.29.2: Identification of penetrations

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009)) Access will be...

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009)) Access will be...
  157. Air Sealing > Compartmentalization 2.29: Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or structural components, includes dumbwaiters and trash chutes)

    2.29.3: Preparation

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...
  158. Air Sealing > Compartmentalization 2.29: Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or structural components, includes dumbwaiters and trash chutes)

    2.29.4: Installation, sealant and materials selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...
  159. Air Sealing > Compartmentalization 2.29: Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or structural components, includes dumbwaiters and trash chutes)

    2.29.5: Demolition repair

    Access holes will be repaired Both temporary (during construction) and permanent demolition repairs will preserve the fire resistance ratings of...

    Access holes will be repaired Both temporary (during construction) and permanent demolition repairs will preserve the fire resistance ratings of...
  160. Air Sealing > Compartmentalization 2.29: Chase Ways (e.g., service spaces containing pipes, wires, ducts, and/or structural components, includes dumbwaiters and trash chutes)

    2.29.6: Verification

    Repairs will be verified by visual inspections, infrared thermography, smoke and/or pressure tests consistent with the pre-inspection

    Repairs will be verified by visual inspections, infrared thermography, smoke and/or pressure tests consistent with the pre-inspection
  161. 2.3 Covers for Sump Pumps, Drains, Pits and Other Intentional Slab penetrations

    Topic: Moisture Control Subtopic: Crawl Spaces and Basements 2.3 Detail Name: Covers for Sump Pumps, Drains, Pits and Other Intentional Slab...

    Topic: Moisture Control Subtopic: Crawl Spaces and Basements 2.3 Detail Name: Covers for Sump Pumps, Drains, Pits and Other Intentional Slab...
  162. Topic: Moisture Control > Crawl Spaces and Basements 2.3: Covers for Sump Pumps, Drains, Pits and Other Intentional Slab penetrations

    2.3.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Repairs necessary to stabilize treatment areas and protect or preserve integrity of energy...

    Incorporate SWS Topic “General, Pre-inspection” Repairs necessary to stabilize treatment areas and protect or preserve integrity of energy...
  163. Moisture Control > Crawl Spaces and Basements 2.3: Covers for Sump Pumps, Drains, Pits and Other Intentional Slab penetrations

    2.3.2: Installation

    All exposed water sources will be capped and operable/able to be opened for maintenance access Caps will be rigid, durable and suitable for high...

    All exposed water sources will be capped and operable/able to be opened for maintenance access Caps will be rigid, durable and suitable for high...
  164. Moisture Control > Crawl Spaces and Basements 2.3: Covers for Sump Pumps, Drains, Pits and Other Intentional Slab penetrations

    2.3.3: Property manager education

    Documentation of material and maintenance requirements will be provided to property manager

    Documentation of material and maintenance requirements will be provided to property manager
  165. 2.30 Enclosed common area stairwells, elevators (floor-to-floor access), including rooftop elevator mechanical rooms

    Topic: Air Sealing Subtopic: Compartmentalization 2.30 Detail Name: Enclosed common area stairwells, elevators (floor-to-floor access),...

    Topic: Air Sealing Subtopic: Compartmentalization 2.30 Detail Name: Enclosed common area stairwells, elevators (floor-to-floor access),...
  166. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  167. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.2: Work coordination among trades

    Work will be coordinated with all other trades performing work in compartmentalized spaces to schedule systemwide test-out verification requirements...

    Work will be coordinated with all other trades performing work in compartmentalized spaces to schedule systemwide test-out verification requirements...
  168. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.3: Identification of penetrations

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009)) Worker access...

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009)) Worker access...
  169. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.4: Preparation

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...
  170. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.5: Installation, sealant and materials selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...
  171. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.6: Verification

    Repairs will be verified by visual inspections, infrared thermography, smoke and/or pressure tests consistent with the pre-inspection Any pressure...

    Repairs will be verified by visual inspections, infrared thermography, smoke and/or pressure tests consistent with the pre-inspection Any pressure...
  172. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.7: Verification: stairwell pressure balancing

    All doors, hatches and louvers in stairwells will be tested and adjusted as a system to ensure effective operation and closure Verification will...

    All doors, hatches and louvers in stairwells will be tested and adjusted as a system to ensure effective operation and closure Verification will...
  173. Air Sealing > Compartmentalization 2.30: Enclosed common area stairwells and elevators (floor-to-floor access)

    2.30.8: Property manager education

    Documentation of material and maintenance requirements will be provided to property manager

    Documentation of material and maintenance requirements will be provided to property manager
  174. 2.31 Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room, generator room)

    Topic: Air Sealing Subtopic: Compartmentalization 2.31 Detail Name: Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room,...

    Topic: Air Sealing Subtopic: Compartmentalization 2.31 Detail Name: Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room,...
  175. Air Sealing > Compartmentalization 2.31: Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room, generator room)

    2.31.1: Pre-inspection

    Hazardous materials stored in mechanical rooms with air handlers or combustion appliances (e.g., boilers, furnaces) will be identified and removed;...

    Hazardous materials stored in mechanical rooms with air handlers or combustion appliances (e.g., boilers, furnaces) will be identified and removed;...
  176. Air Sealing > Compartmentalization 2.31: Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room, generator room)

    2.31.2: Identification of penetrations

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009))

    Penetrations will be identified using visual inspections, infrared thermography, smoke and/or pressure tests (ASTM E1186-03 (2009))
  177. Air Sealing > Compartmentalization 2.31: Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room, generator room)

    2.31.3: Preparation

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926, 1910) The...
  178. Air Sealing > Compartmentalization 2.31: Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room, generator room)

    2.31.4: Sealant and materials selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...
  179. Air Sealing > Compartmentalization 2.31: Isolating Combustion Appliance Rooms (e.g., boiler room, furnace room, generator room)

    2.31.5: Verification

    Repairs will be verified by pressure testing for every instance of the room type

    Repairs will be verified by pressure testing for every instance of the room type
  180. 2.32 Garages- Isolating from Living Spaces

    Topic: Air Sealing Subtopic: Compartmentalization 2.32 Detail Name: Garages- Isolating from Living Spaces Desired Outcome: Effective air...

    Topic: Air Sealing Subtopic: Compartmentalization 2.32 Detail Name: Garages- Isolating from Living Spaces Desired Outcome: Effective air...
  181. Air Sealing > Compartmentalization 2.32: Garages- Isolating from Living Spaces

    2.32.1: Pre-inspection including combustion safety

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  182. Air Sealing > Compartmentalization 2.32: Garages- Isolating from Living Spaces

    2.32.2: Identification of penetrations

    Penetrations will be identified using one or more of the following: Visual inspections Infrared thermography Air flow detection smoke or visible...

    Penetrations will be identified using one or more of the following: Visual inspections Infrared thermography Air flow detection smoke or visible...
  183. Air Sealing > Compartmentalization 2.32: Garages- Isolating from Living Spaces

    2.32.3: Preparation

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926 or 1910) CO...

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1926 or 1910) CO...
  184. Air Sealing > Compartmentalization 2.32: Garages- Isolating from Living Spaces

    2.32.4: Installation, sealant and materials selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...
  185. Air Sealing > Compartmentalization 2.32: Garages- Isolating from Living Spaces

    2.32.5: Verification

    Pressure differential of garage to building will be measured CO levels in the building will be measured

    Pressure differential of garage to building will be measured CO levels in the building will be measured
  186. 2.33 Garages – Sealing penetrations

    Topic: Air Sealing Subtopic: Compartmentalization 2.33 Detail Name: Garages – Sealing penetrations Desired Outcome: Openings sealed to...

    Topic: Air Sealing Subtopic: Compartmentalization 2.33 Detail Name: Garages – Sealing penetrations Desired Outcome: Openings sealed to...
  187. Air Sealing > Compartmentalization 2.33: Garages – Sealing penetrations

    2.33.1: Penetrations

    All lighting fixtures, wiring, plumbing, venting, ducting and gas piping penetrations will be sealed

    All lighting fixtures, wiring, plumbing, venting, ducting and gas piping penetrations will be sealed
  188. Air Sealing > Compartmentalization 2.33: Garages - Sealing penetrations

    2.33.2: Ductwork

    All ductwork in attached garage will be sealed in accordance with the duct sealing specifications Where duct system serves any other conditioned...

    All ductwork in attached garage will be sealed in accordance with the duct sealing specifications Where duct system serves any other conditioned...
  189. Air Sealing > Compartmentalization 2.33: Garages - Sealing penetrations

    2.33.3: Cracks

    All cracks in walls, ceilings or floors that separate conditionedspace from garage will be sealed, including cracks between mud sill, rim joists,...

    All cracks in walls, ceilings or floors that separate conditionedspace from garage will be sealed, including cracks between mud sill, rim joists,...
  190. Air Sealing > Compartmentalization 2.33: Garages - Sealing penetrations

    2.33.4: Garage to conditioned space door

    Weatherstripping, door sweep or threshold will be installed to stop air leakage

    Weatherstripping, door sweep or threshold will be installed to stop air leakage
  191. Air Sealing > Compartmentalization 2.33: Garages - Sealing penetrations

    2.33.5: Glass

    Broken glass panes in doors will be replaced, pointed and glazed where needed Where glazing is permitted by code, verify that replacement glass...

    Broken glass panes in doors will be replaced, pointed and glazed where needed Where glazing is permitted by code, verify that replacement glass...
  192. Air Sealing > Compartmentalization 2.33: Garages - Sealing penetrations

    2.33.6: Carbon monoxide (CO) detector

    Carbon monoxide alarms or detection systems that comply with applicable codes, laws and ordinances will be tested and confirmed to be operational...

    Carbon monoxide alarms or detection systems that comply with applicable codes, laws and ordinances will be tested and confirmed to be operational...
  193. Air Sealing > Compartmentalization 2.33: Garages - Sealing penetrations

    2.33.7: Building operations staff/occupant education

    Occupant and building operations staff will be educated on need to keep door from garage to conditioned space closed and need to minimize the time...

    Occupant and building operations staff will be educated on need to keep door from garage to conditioned space closed and need to minimize the time...
  194. 2.34 Air Seal Concrete Floor Slab Foundation: Raised, On Grade and Below-Grade

    Topic: Air Sealing Subtopic: Slab-on-Grade 2.34 Detail Name: Air Seal Concrete Floor Slab Foundation: Raised, On Grade and Below-Grade ...

    Topic: Air Sealing Subtopic: Slab-on-Grade 2.34 Detail Name: Air Seal Concrete Floor Slab Foundation: Raised, On Grade and Below-Grade ...
  195. Air Sealing > Slab-on-Grade 2.34: Air seal floor slab foundation: raised, on-grade and below-grade

    2.34.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Where applicable (generally above-grade concrete slabs between conditioned and unconditioned...

    Incorporate SWS Topic “General, Pre-inspection” Where applicable (generally above-grade concrete slabs between conditioned and unconditioned...
  196. Air Sealing > Slab-on-Grade 2.34: Air seal floor slab foundation: raised, on-grade and below-grade

    2.34.2: Identification of penetrations

    Penetrations will be identified using visual inspections, smoke and/or pressure tests (ASTM E1186-03 (2009))

    Penetrations will be identified using visual inspections, smoke and/or pressure tests (ASTM E1186-03 (2009))
  197. Air Sealing > Slab-on-Grade 2.34: Air seal floor slab foundation: raised, on-grade and below-grade

    2.34.3: Preparation

    Health and safety concerns regarding for occupants, workers and materials will be addressed in accordance with OSHA standards (OSHA 1926, 1910) ...

    Health and safety concerns regarding for occupants, workers and materials will be addressed in accordance with OSHA standards (OSHA 1926, 1910) ...
  198. Air Sealing > Slab-on-Grade 2.34: Air seal floor slab foundation: raised, on-grade and below-grade

    2.34.4: Sealant and materials selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will...
  199. Air Sealing > Slab-on-Grade 2.34: Air seal floor slab foundation: raised, on-grade and below-grade

    2.34.5: Demolition repair

    Access holes will be repaired

    Access holes will be repaired
  200. Air Sealing > Slab-on-Grade 2.34: Air seal floor slab foundation: raised, on-grade and below-grade

    2.34.6: Verification

    Repairs will be verified by visual inspections, smoke and/or pressure tests consistent with the pre-inspection

    Repairs will be verified by visual inspections, smoke and/or pressure tests consistent with the pre-inspection
  201. 2.35 Reflective Roof Coatings

    Topic: Insulation Subtopic: Roof 2.35 Detail Name: Reflective Roof Coatings Desired Outcome: Reduced solar heat gain and increased...

    Topic: Insulation Subtopic: Roof 2.35 Detail Name: Reflective Roof Coatings Desired Outcome: Reduced solar heat gain and increased...
  202. Insulation > Roof 2.35: Reflective Roof Coatings

    2.35.1: Roof coating/membrane selection

    Assess condition of existing roof system and correct all deficiencies prior to application of reflective coating Reflective coatings will only be...

    Assess condition of existing roof system and correct all deficiencies prior to application of reflective coating Reflective coatings will only be...
  203. 2.36 Spray Polyurethane Foam Preparation and Application

    Topic: Insulation Subtopic: Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36 Detail Name: Spray Polyurethane Foam Preparation and...

    Topic: Insulation Subtopic: Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36 Detail Name: Spray Polyurethane Foam Preparation and...
  204. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36: Spray Polyurethane Foam Preparation and Application

    2.36.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  205. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36: Spray Polyurethane Foam Preparation and Application

    2.36.2: Occupant safety

    An occupant safety plan will be prepared and implemented

    An occupant safety plan will be prepared and implemented
  206. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36: Spray Polyurethane Foam Preparation and Application

    2.36.3: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  207. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36: Spray Polyurethane Foam Preparation and Application

    2.36.4: Surface preparation

    All surfaces where spray polyurethane foam (SPF) is applied will be clean, dry and in accordance with manufacturer specifications for ambient and...

    All surfaces where spray polyurethane foam (SPF) is applied will be clean, dry and in accordance with manufacturer specifications for ambient and...
  208. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36: Spray Polyurethane Foam Preparation and Application

    2.36.5: Installation of insulation dams

    Attic space ventilation to be retained will be appropriately baffled and protected to allow for maximum application of foam insulation at exterior...

    Attic space ventilation to be retained will be appropriately baffled and protected to allow for maximum application of foam insulation at exterior...
  209. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.36: Spray Polyurethane Foam Preparation and Application

    2.36.6: Installation

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Spray polyurethane foam (SPF) will be applied...

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Spray polyurethane foam (SPF) will be applied...
  210. 2.37 Spray Polyurethane Foam Vented Roof Decks Preparation

    Topic: Insulation Subtopic: Roof Decks (Underside of Deck - Attic Space Ceilings) 2.37 Detail Name: Spray Polyurethane Foam Vented Roof Decks...

    Topic: Insulation Subtopic: Roof Decks (Underside of Deck - Attic Space Ceilings) 2.37 Detail Name: Spray Polyurethane Foam Vented Roof Decks...
  211. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.37: Spray Polyurethane Foam Vented Roof Decks Preparation

    2.37.1: Surface preparation

    All surfaces where Spray polyurethane foam (SPF) is applied will be clean, dry and free of contamination and degradation Substrate surfaces will...

    All surfaces where Spray polyurethane foam (SPF) is applied will be clean, dry and free of contamination and degradation Substrate surfaces will...
  212. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.37: Spray Polyurethane Foam Vented Roof Decks Preparation

    2.37.2: Installation of vent chutes

    Vent chutes will be installed between all rafters or trusses to ensure a continuous ventilation path between the eave or soffit area and the ridge or...

    Vent chutes will be installed between all rafters or trusses to ensure a continuous ventilation path between the eave or soffit area and the ridge or...
  213. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.37: Spray Polyurethane Foam Vented Roof Decks Preparation

    2.37.3: Installation of insulation dams

    Attic space ventilation to be retained will be appropriately baffled and protected to allow for maximum application of foam insulation at exterior...

    Attic space ventilation to be retained will be appropriately baffled and protected to allow for maximum application of foam insulation at exterior...
  214. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.37: Spray Polyurethane Foam Vented Roof Decks Preparation

    2.37.4: Removal of existing insulation and vapor retarder

    All existing attic floor insulation and vapor retarder will be removed

    All existing attic floor insulation and vapor retarder will be removed
  215. 2.38 Spray Polyurethane Foam Vented Roof Decks Installation

    Topic: Insulation Subtopic: Roof Decks (Underside of Deck - Attic Space Ceilings) 2.38 Detail Name: Spray Polyurethane Foam Vented Roof Decks...

    Topic: Insulation Subtopic: Roof Decks (Underside of Deck - Attic Space Ceilings) 2.38 Detail Name: Spray Polyurethane Foam Vented Roof Decks...
  216. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.38: Spray Polyurethane Foam Vented Roof Decks Installation

    2.38.1: Installation

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Spray polyurethane foam (SPF) will be applied to...

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Spray polyurethane foam (SPF) will be applied to...
  217. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.38: Spray Polyurethane Foam Vented Roof Decks Installation

    2.38.2: Onsite documentation

    Documentation will be posted as required by federal specification 16CFR460.17

    Documentation will be posted as required by federal specification 16CFR460.17
  218. Insulation > Roof Decks (Underside of Deck - Attic Space Ceilings) 2.38: Spray Polyurethane Foam Vented Roof Decks Installation

    2.38.3: Building operations staff education

    Documentation of material and R-value will be provided to building operations staff

    Documentation of material and R-value will be provided to building operations staff
  219. 2.39 Accessible Unvented Flat Roof with or without Existing Insulation

    Topic: Insulation Subtopic: Attics 2.39 Detail Name: Accessible Unvented Flat Roof with or without Existing Insulation Desired...

    Topic: Insulation Subtopic: Attics 2.39 Detail Name: Accessible Unvented Flat Roof with or without Existing Insulation Desired...
  220. Insulation > Attics 2.39: Accessible Unvented Flat Roof with or without Existing Insulation

    2.39.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  221. Insulation > Attics 2.39: Accessible Unvented Flat Roof with or without Existing Insulation

    2.39.2: Occupant safety

    An occupant safety plan will be prepared and implemented

    An occupant safety plan will be prepared and implemented
  222. Insulation > Attics 2.39: Accessible Unvented Flat Roof with or without Existing Insulation

    2.39.3: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Insulation will not be installed if moisture related issues are not resolved

    Incorporate SWS Topic “General, Pre-inspection” Insulation will not be installed if moisture related issues are not resolved
  223. Insulation > Attics 2.39: Accessible Unvented Flat Roof with or without Existing Insulation

    2.39.4: Preparation

    New insulation that is not designed to also serve as an air barrier (e.g., closed cell polyurethane spray foam) will not be added until all air...

    New insulation that is not designed to also serve as an air barrier (e.g., closed cell polyurethane spray foam) will not be added until all air...
  224. Insulation > Attics 2.39: Accessible Unvented Flat Roof with or without Existing Insulation

    2.39.5: Installation

    Attic insulation will be installed without gaps, voids, compressions, misalignments or wind intrusions Roof cavities will be blown with loose...

    Attic insulation will be installed without gaps, voids, compressions, misalignments or wind intrusions Roof cavities will be blown with loose...
  225. Insulation > Attics 2.39: Accessible Unvented Flat Roof with or without Existing Insulation

    2.39.6: Ventilation

    Code compliant ventilation will be installed before insulation

    Code compliant ventilation will be installed before insulation
  226. Insulation > Attics 2.39: Accessible Unvented Flat Roof with or without Existing Insulation

    2.39.7: Occupant education

    Documentation of material and R-value will be provided to occupant

    Documentation of material and R-value will be provided to occupant
  227. 2.4 Radon Testing and Evaluation

    Topic: Health and Safety Subtopic: Occupant Health 2.4 Detail Name: Radon Testing and Evaluation Desired Outcome: Work completed without...

    Topic: Health and Safety Subtopic: Occupant Health 2.4 Detail Name: Radon Testing and Evaluation Desired Outcome: Work completed without...
  228. Health and Safety > Occupant Health 2.4: Radon Testing and Evaluation

    2.4.1: Radon testing and mitigation

    EPA guidelines for radon in current edition of “Healthy Indoor Environment Protocols for Home Energy Retrofits” will be followed Test will be...

    EPA guidelines for radon in current edition of “Healthy Indoor Environment Protocols for Home Energy Retrofits” will be followed Test will be...
  229. 2.40 Loose Fill Over Existing Insulation on Accessible Attic Floors

    Topic: Insulation Subtopic: Attics 2.40 Detail Name: Loose Fill Over Existing Insulation on Accessible Attic Floors Desired Outcome:...

    Topic: Insulation Subtopic: Attics 2.40 Detail Name: Loose Fill Over Existing Insulation on Accessible Attic Floors Desired Outcome:...
  230. Insulation > Attics 2.40: Loose Fill Over Existing Insulation on Accessible Attic Floors

    2.40.1: Preparation

    New insulation will not be added until all air sealing has been completed Existing insulation will be inspected to confirm that it is not...

    New insulation will not be added until all air sealing has been completed Existing insulation will be inspected to confirm that it is not...
  231. Insulation > Attics 2.40: Loose Fill Over Existing Insulation on Accessible Attic Floors

    2.40.2: Installation

    The correct depth and number of bags will be blown in accordance with manufacturer specifications Insulation will be installed to prescribed...

    The correct depth and number of bags will be blown in accordance with manufacturer specifications Insulation will be installed to prescribed...
  232. Insulation > Attics 2.40: Loose Fill Over Existing Insulation on Accessible Attic Floors

    2.40.3: Safety

    Insulation will not be allowed on top of noninsulation contact (IC), rated can light boxes or between a heat generating appliance and a dam unless...

    Insulation will not be allowed on top of noninsulation contact (IC), rated can light boxes or between a heat generating appliance and a dam unless...
  233. Insulation > Attics 2.40: Loose Fill Over Existing Insulation on Accessible Attic Floors

    2.40.4: Onsite documentation

    Documentation will be posted as required by federal specification 16CFR460.17

    Documentation will be posted as required by federal specification 16CFR460.17
  234. 2.41 Insulating Inaccessible Attics

    Topic: Insulation Subtopic: Attics 2.41 Detail Name: Insulating Inaccessible Attics Desired Outcome: Insulation installation does not...

    Topic: Insulation Subtopic: Attics 2.41 Detail Name: Insulating Inaccessible Attics Desired Outcome: Insulation installation does not...
  235. Insulation > Attics 2.41: Insulating Inaccessible Attics

    2.41.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  236. Insulation > Attics 2.41: Insulating Inaccessible Attics

    2.41.2: Pre-inspection

    Attics that cannot be air sealed will not be filled with blown insulation At no time will dense pack insulation products be considered an...

    Attics that cannot be air sealed will not be filled with blown insulation At no time will dense pack insulation products be considered an...
  237. 2.42 Installation/Correction of Unconditioned Attic Ventilation

    Topic: Insulation Subtopic: Attics 2.42 Detail Name: Installation/Correction of Unconditioned Attic Ventilation Desired...

    Topic: Insulation Subtopic: Attics 2.42 Detail Name: Installation/Correction of Unconditioned Attic Ventilation Desired...
  238. Insulation > Attics 2.42: Installation/Correction of Unconditioned Attic Ventilation

    2.42.1: Pre-Inspection

    Incorporate SWS Topic “General, Pre-inspection”

    Incorporate SWS Topic “General, Pre-inspection”
  239. Insulation > Attics 2.42: Installation/Correction of Unconditioned Attic Ventilation

    2.42.2: Air barrier and thermal boundary

    Attic ventilation will be recommended or installed only if: The presence of an effective air barrier and thermal boundary between the attic and...

    Attic ventilation will be recommended or installed only if: The presence of an effective air barrier and thermal boundary between the attic and...
  240. Insulation > Attics 2.42: Installation/Correction of Unconditioned Attic Ventilation

    2.42.3: Vent type

    Attic vent types will be consistent with requirements for their specific location (e.g., exterior soffit, gable end, roof) and material and intended...

    Attic vent types will be consistent with requirements for their specific location (e.g., exterior soffit, gable end, roof) and material and intended...
  241. Insulation > Attics 2.42: Installation/Correction of Unconditioned Attic Ventilation

    2.42.4: Vent location

    Placement of attic vents will be considered for proper air flow and prevention of entry of wind driven rain or snow

    Placement of attic vents will be considered for proper air flow and prevention of entry of wind driven rain or snow
  242. Insulation > Attics 2.42: Installation/Correction of Unconditioned Attic Ventilation

    2.42.5: Ventilation baffling

    Baffling for attic soffit vents will be installed to: • Ensure proper air flow • Prevent wind washing of insulation • Allow maximum insulation...

    Baffling for attic soffit vents will be installed to: • Ensure proper air flow • Prevent wind washing of insulation • Allow maximum insulation...
  243. Insulation > Attics 2.42: Installation/Correction of Unconditioned Attic Ventilation

    2.42.6: Ventilation screens

    All attic ventilation will have screens with noncorroding wire mesh with openings of 1/8” to prevent pest entry (e.g., birds, bats, bees) ...

    All attic ventilation will have screens with noncorroding wire mesh with openings of 1/8” to prevent pest entry (e.g., birds, bats, bees) ...
  244. 2.43 Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic Spaces

    Topic: Insulation Subtopic: Attics 2.43 Detail Name: Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic...

    Topic: Insulation Subtopic: Attics 2.43 Detail Name: Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic...
  245. Insulation > Attics 2.43: Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic Spaces

    2.43.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  246. Insulation > Attics 2.43: Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic Spaces

    2.43.2: Occupant safety

    An occupant safety plan will be prepared and implemented

    An occupant safety plan will be prepared and implemented
  247. Insulation > Attics 2.43: Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic Spaces

    2.43.3: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  248. Insulation > Attics 2.43: Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic Spaces

    2.43.4: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  249. Insulation > Attics 2.43: Tenting, Air Sealing and Insulating Wet Sprinkler System Components in Unconditioned Attic Spaces

    2.43.5: Installation

    When tenting is required, an air tight, rigid and insulated enclosure will be installed around entire sprinkler system exposed within the attic ...

    When tenting is required, an air tight, rigid and insulated enclosure will be installed around entire sprinkler system exposed within the attic ...
  250. 2.44 Dense Packing Blown Insulation

    Topic: Insulation Subtopic: Exterior Walls with Empty Wall Cavities 2.44 Detail Name: Dense Packing Blown Insulation Desired Outcome:...

    Topic: Insulation Subtopic: Exterior Walls with Empty Wall Cavities 2.44 Detail Name: Dense Packing Blown Insulation Desired Outcome:...
  251. Insulation > Exterior Walls with Empty Wall Cavities 2.44: Dense Packing Blown Insulation

    2.44.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS Lead safety procedures in buildings built before 1980 will...

    All worker safety specifications will be in accordance with Global Worker Safety SWS Lead safety procedures in buildings built before 1980 will...
  252. Insulation > Exterior Walls with Empty Wall Cavities 2.44: Dense Packing Blown Insulation

    2.44.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented
  253. Insulation > Exterior Walls with Empty Wall Cavities 2.44: Dense Packing Blown Insulation

    2.44.3: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  254. Insulation > Exterior Walls with Empty Wall Cavities 2.44: Dense Packing Blown Insulation

    2.44.4: Wall access

    When feasible, insulation will be installed into cavities from the exterior side of the wall When feasible, exterior cladding at the insulation ...

    When feasible, insulation will be installed into cavities from the exterior side of the wall When feasible, exterior cladding at the insulation ...
  255. Insulation > Exterior Walls with Empty Wall Cavities 2.44: Dense Packing Blown Insulation

    2.44.5: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  256. Insulation > Exterior Walls with Empty Wall Cavities 2.44: Dense Packing Blown Insulation

    2.44.6: Exterior dense pack

    Using fill tube, 100% of each cavity will be completely filled to a consistent density: • Cellulose insulation used in an enclosed cavity will be...

    Using fill tube, 100% of each cavity will be completely filled to a consistent density: • Cellulose insulation used in an enclosed cavity will be...
  257. 2.45 Exterior Wall Surface Insulation

    Topic: Insulation Subtopic: Walls 2.45 Detail Name: Exterior Wall Surface Insulation Desired Outcome: Complete and continuous thermal air...

    Topic: Insulation Subtopic: Walls 2.45 Detail Name: Exterior Wall Surface Insulation Desired Outcome: Complete and continuous thermal air...
  258. Insulation > Walls 2.45: Exterior Wall Surface Insulation

    2.45.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  259. Insulation > Walls 2.45: Exterior Wall Surface Insulation

    2.45.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented
  260. Insulation > Walls 2.45: Exterior Wall Surface Insulation

    2.45.3: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Repairs necessary to stabilize work areas and protect or preserve integrity of energy improvement...

    Incorporate SWS Topic “General, Pre-inspection” Repairs necessary to stabilize work areas and protect or preserve integrity of energy improvement...
  261. Insulation > Walls 2.45: Exterior Wall Surface Insulation

    2.45.4: Prepare substrate

    Exterior siding will be removed as appropriate. Where siding materials contain lead, lead safe work practices will be used. Where siding...

    Exterior siding will be removed as appropriate. Where siding materials contain lead, lead safe work practices will be used. Where siding...
  262. Insulation > Walls 2.45: Exterior Wall Surface Insulation

    2.45.5: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  263. Insulation > Walls 2.45: Exterior Wall Surface Insulation

    2.45.6: Installation

    Insulation will be installed to provide a continuous thermal (insulation) barrier to achieve the specified R-value for the assembly being insulated. ...

    Insulation will be installed to provide a continuous thermal (insulation) barrier to achieve the specified R-value for the assembly being insulated. ...
  264. 2.46 Above Grade Exposed Floor, Joisted Assemblies

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.46 Detail Name:– Above Grade Exposed Floor, Joisted Assemblies Desired...

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.46 Detail Name:– Above Grade Exposed Floor, Joisted Assemblies Desired...
  265. Topic: Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.10: Rigid protective barrier

    A continuous rigid barrier, suitable to withstand weather, moisture & pest contact and with a fire resistance rating equal to the resistance rating...

    A continuous rigid barrier, suitable to withstand weather, moisture & pest contact and with a fire resistance rating equal to the resistance rating...
  266. Topic: Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.11: Property manager education

    Documentation of material and R-value will be provided to property manager

    Documentation of material and R-value will be provided to property manager
  267. Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  268. Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.2: Preparation

    Health and safety concerns will be addressed for occupants, workers, and repair materials in accordance with OSHA standards. (OSHA 1926, 1910) ...

    Health and safety concerns will be addressed for occupants, workers, and repair materials in accordance with OSHA standards. (OSHA 1926, 1910) ...
  269. Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.3: Subfloor preparation

    Sealing between conditioned space and unconditioned space will be completed before insulating

    Sealing between conditioned space and unconditioned space will be completed before insulating
  270. Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.4: Installation

    Insulation will be installed to at least prescribed R-value Insulation will be installed in contact with subfloor without gaps, voids,...

    Insulation will be installed to at least prescribed R-value Insulation will be installed in contact with subfloor without gaps, voids,...
  271. Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.5: Installation of batts or dense pack

    Insulation will completely fill the cavity space within the joists or trusses

    Insulation will completely fill the cavity space within the joists or trusses
  272. Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.6: Installation of rigid insulation

    Rigid insulation will be mechanically fastened to the bottom of the subfloor or at the bottom of the joists or trusses If attached at the bottom...

    Rigid insulation will be mechanically fastened to the bottom of the subfloor or at the bottom of the joists or trusses If attached at the bottom...
  273. Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.7: Installation of spray polyurethane foam (SPF)

    SPF will be applied to bottom side of subfloor between floor joists and all rim/band joists Spray applied foam products will incorporate a thermal...

    SPF will be applied to bottom side of subfloor between floor joists and all rim/band joists Spray applied foam products will incorporate a thermal...
  274. Topic: Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.8: Installation, if mechanicals in joisted assemblies (Applies to all insulation types)

    All plumbing or mechanical ductwork will be enclosed within the insulated space and will have sufficient insulation on the exterior side

    All plumbing or mechanical ductwork will be enclosed within the insulated space and will have sufficient insulation on the exterior side
  275. Topic: Insulation > Above Grade Exterior Floors 2.46: Above Grade Exposed Floor, Joisted Assemblies

    2.46.9: Secure batts

    Batts will be secured with physical fasteners

    Batts will be secured with physical fasteners
  276. 2.47 Pier House Subfloor Insulation – Batt Installation with Rigid Barrier

    Topic: Insulation Subtopic: Above Grade Exterior Floor 2.47 Detail Name: Pier House Subfloor Insulation – Batt Installation with Rigid Barrier ...

    Topic: Insulation Subtopic: Above Grade Exterior Floor 2.47 Detail Name: Pier House Subfloor Insulation – Batt Installation with Rigid Barrier ...
  277. Insulation > Above Grade Exterior Floor 2.47: Pier House Subfloor Insulation – Batt Installation with Rigid Barrier

    2.47.1: Subfloor preparation

    Sealing between conditioned space and crawl space will be completed before insulating work begins

    Sealing between conditioned space and crawl space will be completed before insulating work begins
  278. Insulation > Above Grade Exterior Floor 2.47: Pier House Subfloor Insulation  Batt Installation with Rigid Barrier

    2.47.2: Installation

    Insulation will be cut as necessary to fit between the floor joists and installed in contact with subfloor without gaps, voids, compressions,...

    Insulation will be cut as necessary to fit between the floor joists and installed in contact with subfloor without gaps, voids, compressions,...
  279. Insulation > Above Grade Exterior Floor 2.47: Pier House Subfloor Insulation  Batt Installation with Rigid Barrier

    2.47.3: Secure batts

    Batts will be secured with physical fasteners

    Batts will be secured with physical fasteners
  280. Insulation > Above Grade Exterior Floor 2.47: Pier House Subfloor Insulation  Batt Installation with Rigid Barrier

    2.47.4: Rigid air barrier

    A rigid air barrier will be mechanically fastened to underside of floor assembly Seams and penetrations will be sealed Rigid barrier will be...

    A rigid air barrier will be mechanically fastened to underside of floor assembly Seams and penetrations will be sealed Rigid barrier will be...
  281. Insulation > Above Grade Exterior Floor 2.47: Pier House Subfloor Insulation  Batt Installation with Rigid Barrier

    2.47.5: Building operations staff education

    Documentation of material and R-value will be provided to building operations staff

    Documentation of material and R-value will be provided to building operations staff
  282. 2.48 Pier House Subfloor Insulation – Spray Polyurethane Foam Preparation and Installation

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.48 Detail Name: Pier House Subfloor Insulation – Spray Polyurethane Foam Preparation...

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.48 Detail Name: Pier House Subfloor Insulation – Spray Polyurethane Foam Preparation...
  283. Insulation > Above Grade Exterior Floor 2.48: Pier House Subfloor Installation – Spray Polyurethane Foam Preparation and Installation

    2.48.1: Preparation

    All floor areas will be open and accessible for spray polyurethane foam (SPF) application Any openings larger than Ľ” will be covered with...

    All floor areas will be open and accessible for spray polyurethane foam (SPF) application Any openings larger than Ľ” will be covered with...
  284. Insulation > Above Grade Exterior Floor 2.48: Pier House Subfloor Installation  Spray Polyurethane Foam Preparation and Installation

    2.48.2: Installation

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Applicator will be certified by a recognized...

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Applicator will be certified by a recognized...
  285. Insulation > Above Grade Exterior Floor 2.48: Pier House Subfloor Installation  Spray Polyurethane Foam Preparation and Installation

    2.48.3: Fire protection

    SPF will be separated from the occupied space of the building with a thermal and ignition barrier Thermal and ignition barriers will be applied...

    SPF will be separated from the occupied space of the building with a thermal and ignition barrier Thermal and ignition barriers will be applied...
  286. Insulation > Above Grade Exterior Floor 2.48: Pier House Subfloor Installation  Spray Polyurethane Foam Preparation and Installation

    2.48.4: Installation for fireproofed assemblies with sprayed on cellulose insulation

    SPF insulation will not be applied to existing spray applied fireproofing

    SPF insulation will not be applied to existing spray applied fireproofing
  287. 2.49 Pier House Subfloor Insulation – Loose Fill with Rigid Barrier

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.49 Detail Name: Pier House Subfloor Insulation – Loose Fill with Rigid Barrier ...

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.49 Detail Name: Pier House Subfloor Insulation – Loose Fill with Rigid Barrier ...
  288. Insulation > Above Grade Exterior Floors 2.49: Pier House Subfloor Insulation – Loose Fill with Rigid Barrier

    2.49.1: Subfloor preparation

    Sealing between conditioned space and crawl space will be completed before insulating

    Sealing between conditioned space and crawl space will be completed before insulating
  289. Insulation > Above Grade Exterior Floors 2.49: Pier House Subfloor Insulation  Loose Fill with Rigid Barrier

    2.49.2: Rigid air barrier

    A rigid air barrier will be mechanically fastened to underside of floor assembly Seams and penetrations will be sealed Rigid barrier will be...

    A rigid air barrier will be mechanically fastened to underside of floor assembly Seams and penetrations will be sealed Rigid barrier will be...
  290. Insulation > Above Grade Exterior Floors 2.49: Pier House Subfloor Insulation  Loose Fill with Rigid Barrier

    2.49.3: Installation

    Loose fill insulation will be installed between air barrier and subfloor in accordance with manufacturer specifications to achieve required density,...

    Loose fill insulation will be installed between air barrier and subfloor in accordance with manufacturer specifications to achieve required density,...
  291. Insulation > Above Grade Exterior Floors 2.49: Pier House Subfloor Insulation  Loose Fill with Rigid Barrier

    2.49.4: Building operations staff education

    Documentation of material and R-value will be provided to operations staff

    Documentation of material and R-value will be provided to operations staff
  292. 2.5 HVAC Supply and Return Ducts and Plenums

    Topic: Health and Safety Subtopic: Occupant Health 2.5 Detail Name: HVAC Supply and Return Ducts and Plenums Desired Outcome:...

    Topic: Health and Safety Subtopic: Occupant Health 2.5 Detail Name: HVAC Supply and Return Ducts and Plenums Desired Outcome:...
  293. Health and Safety > Occupant Health 2.5: HVAC Supply and Return Ducts and Plenums

    2.5.1: Supply plenums (Includes conditioned crawl spaces)

    Crawl spaces that are used as heating and cooling supply plenums will not be allowed

    Crawl spaces that are used as heating and cooling supply plenums will not be allowed
  294. Health and Safety > Occupant Health 2.5: HVAC Supply and Return Ducts and Plenums

    2.5.2: Return plenums

    Crawl spaces that are used as heating and cooling return plenums will not be allowed

    Crawl spaces that are used as heating and cooling return plenums will not be allowed
  295. Health and Safety > Occupant Health 2.5: HVAC Supply and Return Ducts and Plenums

    2.5.3: Existing condition where crawl space is used as supply and/or return plenum

    Condition will be corrected to provide supply and/or return plenums isolated from crawl space before work can continue

    Condition will be corrected to provide supply and/or return plenums isolated from crawl space before work can continue
  296. 2.50 Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.50 Detail Name: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast...

    Topic: Insulation Subtopic: Above Grade Exterior Floors 2.50 Detail Name: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast...
  297. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.10: Property manager education

    Documentation of material and maintenance requirements will be provided to property manager

    Documentation of material and maintenance requirements will be provided to property manager
  298. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.1: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  299. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.2: Preparation

    Health and safety concerns will be addressed for occupants, workers, and repair materials in accordance with OSHA standards (OSHA 1926, 1910) ...

    Health and safety concerns will be addressed for occupants, workers, and repair materials in accordance with OSHA standards (OSHA 1926, 1910) ...
  300. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.3: Subfloor preparation

    Sealing between conditioned space and unconditioned space or exterior will be completed before insulating

    Sealing between conditioned space and unconditioned space or exterior will be completed before insulating
  301. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.4: Installation

    Insulation will be installed to prescribed R-value Insulation will be installed in contact with bottom of the floor decking without gaps, voids,...

    Insulation will be installed to prescribed R-value Insulation will be installed in contact with bottom of the floor decking without gaps, voids,...
  302. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.5: Installation of batts

    Batts will be installed continuously All perimeter joints will be sealed to the floor deck

    Batts will be installed continuously All perimeter joints will be sealed to the floor deck
  303. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.6: Installation of rigid insulation

    Rigid insulation will be installed continuously and mechanically fastened to the bottom of the floor deck Where rigid foam plastics are used, in...

    Rigid insulation will be installed continuously and mechanically fastened to the bottom of the floor deck Where rigid foam plastics are used, in...
  304. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.7: Installation of Spray polyurethane foam (SPF)

    SPF will be applied continuously to bottom side of floor deck, per global section for application of SPF Where rigid foam plastics are used, in no...

    SPF will be applied continuously to bottom side of floor deck, per global section for application of SPF Where rigid foam plastics are used, in no...
  305. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.8: Installation, if mechanicals are below the floor deck (Applies to all insulation types)

    All plumbing and ductwork will be enclosed within the insulated space and will have sufficient insulation on the exterior side

    All plumbing and ductwork will be enclosed within the insulated space and will have sufficient insulation on the exterior side
  306. Insulation > Above Grade Exterior Floors 2.50: Above Grade Exposed Floor, Non-Joisted Assemblies (e.g. Pre-cast concrete, Poured in Place, Metal Deck)

    2.50.9: Weather-resistant barrier

    A weather-resistant barrier will be applied to the weather side of the insulation (e.g., Exterior Insulated Finishing System (EIFS) and spray-on roof...

    A weather-resistant barrier will be applied to the weather side of the insulation (e.g., Exterior Insulated Finishing System (EIFS) and spray-on roof...
  307. 2.51 Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    Topic: Insulation Subtopic: Above Grade Floors 2.51 Detail Name:– Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete,...

    Topic: Insulation Subtopic: Above Grade Floors 2.51 Detail Name:– Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete,...
  308. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.1: Subfloor preparation

    Air sealing between conditioned space and unconditioned space will be completed before insulating

    Air sealing between conditioned space and unconditioned space will be completed before insulating
  309. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.2: Metal floor decks

    Bottom side of metal deck flutes will be sealed to the insulation material at every support beam joint Top side of open metal deck flutes (e.g.,...

    Bottom side of metal deck flutes will be sealed to the insulation material at every support beam joint Top side of open metal deck flutes (e.g.,...
  310. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.3: Installation

    Insulation will be installed to prescribed R-value Insulation will be installed in contact with bottom of the floor decking without gaps, voids,...

    Insulation will be installed to prescribed R-value Insulation will be installed in contact with bottom of the floor decking without gaps, voids,...
  311. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.4: Installation of batts and support system

    Batts will be installed continuously between structural framing Batts will be installed with a support system below the insulation Support...

    Batts will be installed continuously between structural framing Batts will be installed with a support system below the insulation Support...
  312. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.5: Installation of rigid insulation and support system

    Rigid insulation will be installed continuously between structural framing Rigid insulation will be installed with a support system below the...

    Rigid insulation will be installed continuously between structural framing Rigid insulation will be installed with a support system below the...
  313. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.6: Installation of Spray polyurethane foam (SPF)

    SPF will be applied continuously to bottom side of floor deck Where rigid foam plastics are used, in no case will the final thickness exceed the...

    SPF will be applied continuously to bottom side of floor deck Where rigid foam plastics are used, in no case will the final thickness exceed the...
  314. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.7: Installation, if mechanicals are below the floor deck( Applies to all insulation types)

    All plumbing and ductwork will be enclosed within the insulated space and will have sufficient insulation in contact with a continuous air barrier on...

    All plumbing and ductwork will be enclosed within the insulated space and will have sufficient insulation in contact with a continuous air barrier on...
  315. Insulation > Above Grade Floors 2.51: Non-Joisted Floors Over Basements or Crawl Spaces (e.g., Pre-cast Concrete, Poured in Place, Metal Deck)

    2.51.8: Property manager education

    Documentation of material and maintenance requirements will be provided to property manager

    Documentation of material and maintenance requirements will be provided to property manager
  316. 2.52 Slab-Edge Foundations and Above Grade Concrete Decks: Raised, On-Grade

    Topic: Insulation Subtopic: Slab-Edge Insulation 2.52 Detail Name: Slab-Edge Foundations and Above Grade Concrete Decks: Raised, On-Grade ...

    Topic: Insulation Subtopic: Slab-Edge Insulation 2.52 Detail Name: Slab-Edge Foundations and Above Grade Concrete Decks: Raised, On-Grade ...
  317. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.10: Property manager education

    Documentation of material and maintenance requirements will be provided to property manager

    Documentation of material and maintenance requirements will be provided to property manager
  318. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.1: Pre-inspection

    An exterior and interior inspection will be conducted for water damage, drainage plane failures, grading issues and breaches unrelated to the...

    An exterior and interior inspection will be conducted for water damage, drainage plane failures, grading issues and breaches unrelated to the...
  319. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.2: Air sealing

    Air sealing between conditioned space and unconditioned space will be completed before insulating

    Air sealing between conditioned space and unconditioned space will be completed before insulating
  320. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.3: Excavation

    Excavation will be done to expose the slab edge to the required depth Caution will be exercised to avoid undermining slab footing and to avoid...

    Excavation will be done to expose the slab edge to the required depth Caution will be exercised to avoid undermining slab footing and to avoid...
  321. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.4: Clean and prepare surfaces

    Slab edge will be prepared for material installation to meet manufacturer specifications

    Slab edge will be prepared for material installation to meet manufacturer specifications
  322. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.5: Top and bottom flashing

    Flashing will be continuous and permanently secured

    Flashing will be continuous and permanently secured
  323. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.6: Installation

    Insulation will be installed to prescribed R-value Insulation will be installed in contact with the slab edge, without voids, compressions or...

    Insulation will be installed to prescribed R-value Insulation will be installed in contact with the slab edge, without voids, compressions or...
  324. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.7: Protective cover

    Exposed insulation will be covered with a durable, rigid material

    Exposed insulation will be covered with a durable, rigid material
  325. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.8: Termites

    Existing termite treatment and inspection gaps will be preserved and termite control measures consistent with local code requirements will be...

    Existing termite treatment and inspection gaps will be preserved and termite control measures consistent with local code requirements will be...
  326. Insulation > Slab-Edge Insulation 2.52: Slab-Edge Foundations: Raised, On-Grade

    2.52.9: Back fill

    Restore excavated earth and grade to preserve drainage plane

    Restore excavated earth and grade to preserve drainage plane
  327. 2.53 Exterior Overhangs Communicating to or through Pressure Boundary

    Topic: Air Sealing Subtopic: Roof/Wall 2.53 Detail Name: Exterior Overhangs Communicating to or through Pressure Boundary Desired Outcome:...

    Topic: Air Sealing Subtopic: Roof/Wall 2.53 Detail Name: Exterior Overhangs Communicating to or through Pressure Boundary Desired Outcome:...
  328. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.1: Worker safety

    All worker safety specifications will be in accordance with Global Worker Safety SWS

    All worker safety specifications will be in accordance with Global Worker Safety SWS
  329. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.2: Occupant safety

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented

    Occupant will be notified of changes or repairs to be made An occupant safety plan will be prepared and implemented
  330. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.3: Pre-inspection

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...

    Incorporate SWS Topic “General, Pre-inspection” Gaps, cracks and holes in fire separations located within the work area will be visually...
  331. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.4: Site

    Items and property below and adjacent to work area will be removed from the work areas or will be adequately protected

    Items and property below and adjacent to work area will be removed from the work areas or will be adequately protected
  332. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.5: Backing and infill

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...

    Where gaps, cracks or holes are larger than 1/4” across and/or where the air sealing materials will be subject to temperature variations in excess of...
  333. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.6: Sealant selection

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...

    Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Selection will be durable,...
  334. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.7: Air barrier

    At the overhang, a continuous air barrier will be created to align with the wall air barrier The opening will be closed off with a rigid material...

    At the overhang, a continuous air barrier will be created to align with the wall air barrier The opening will be closed off with a rigid material...
  335. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.8: Quality assurance

    Overhang will be visually inspected and tested for air tightness in accordance with ASTM E 1186-03 Water management systems will be verified as...

    Overhang will be visually inspected and tested for air tightness in accordance with ASTM E 1186-03 Water management systems will be verified as...
  336. Air Sealing > Roof/Wall 2.53: Exterior Overhangs Communicating to or through Pressure Boundary

    2.53.9: Ignition barrier/fire proofing

    Where rigid foam plastics are used, in no case will the final thickness exceed the manufacturer's tested thickness used to determine the maximum 75...

    Where rigid foam plastics are used, in no case will the final thickness exceed the manufacturer's tested thickness used to determine the maximum 75...
  337. 2.6 Air Sealing Moisture Precautions

    Topic: Health and Safety Subtopic: Safe Work Practices 2.6 Detail Name: Air Sealing Moisture Precautions Desired Outcome: Ensure...

    Topic: Health and Safety Subtopic: Safe Work Practices 2.6 Detail Name: Air Sealing Moisture Precautions Desired Outcome: Ensure...
  338. Health and Safety > Safe Work Practices 2.6: Air Sealing Moisture Precautions

    2.6.1: Moisture precautions: attics/roofs

    Roof leaks will be repaired before performing attic/roof air sealing or insulation Moisture sources in the building that create persistent RH...

    Roof leaks will be repaired before performing attic/roof air sealing or insulation Moisture sources in the building that create persistent RH...
  339. 2.7 Air Sealing Worker Safety

    Topic: Health and Safety Subtopic: Safe Work Practices 2.7 Detail Name: Air Sealing Worker Safety Desired Outcome: Work completed safely...

    Topic: Health and Safety Subtopic: Safe Work Practices 2.7 Detail Name: Air Sealing Worker Safety Desired Outcome: Work completed safely...
  340. Health and Safety > Safe Work Practices 2.7: Air Sealing Worker Safety

    2.7.1: Worker safety

    Worker safety specifications will be in accordance with Global Worker Safety SWS Complete safety action plan based on hazard analysis will be in...

    Worker safety specifications will be in accordance with Global Worker Safety SWS Complete safety action plan based on hazard analysis will be in...
  341. Health and Safety > Safe Work Practices 2.7: Air Sealing Worker Safety

    2.7.2: Moisture precautions for crawl spaces and basements

    Exposed earth will be covered with a continuous, durable and sealed Class I vapor retarder that is suitable for ground contact exposure to normal...

    Exposed earth will be covered with a continuous, durable and sealed Class I vapor retarder that is suitable for ground contact exposure to normal...
  342. Health and Safety > Safe Work Practices 2.7: Air Sealing Worker Safety

    2.7.3: Moisture precautions: living space

    Moisture sources in the building will be identified and reduced or removed Where local ventilation will be installed, (e.g., baths, kitchens),...

    Moisture sources in the building will be identified and reduced or removed Where local ventilation will be installed, (e.g., baths, kitchens),...
  343. Health and Safety > Safe Work Practices 2.7: Air Sealing Worker Safety

    2.7.4: Moisture precautions for exterior water

    Before air sealing and insulating building components, exterior water management will be addressed Before insulating basement or crawl space...

    Before air sealing and insulating building components, exterior water management will be addressed Before insulating basement or crawl space...
  344. 2.8 Insulation Worker Safety

    Topic: Health and Safety Subtopic: Safe Work Practices 2.8 Detail Name: Insulation Worker Safety Desired Outcome: Work is completed...

    Topic: Health and Safety Subtopic: Safe Work Practices 2.8 Detail Name: Insulation Worker Safety Desired Outcome: Work is completed...
  345. Health and Safety > Safe Work Practices 2.8: Insulation Worker Safety

    2.8.1: Worker safety

    Worker safety specifications will be followed in accordance with Global Worker Safety section Personal Protective Equipment (PPE) must comply...

    Worker safety specifications will be followed in accordance with Global Worker Safety section Personal Protective Equipment (PPE) must comply...
  346. Health and Safety > Safe Work Practices 2.8: Insulation Worker Safety

    2.8.2: Vermiculite

    OSHA asbestos abatement protocol 1926.1101 will be followed if vermiculite insulation is present, unless material is tested and certified as not...

    OSHA asbestos abatement protocol 1926.1101 will be followed if vermiculite insulation is present, unless material is tested and certified as not...
  347. Health and Safety > Safe Work Practices 2.8: Insulation Worker Safety

    2.8.3: Respiratory protection

    Least toxic suitable material will be chosen Chemicals will be handled in accordance with manufacturer specifications or Material Safety Data...

    Least toxic suitable material will be chosen Chemicals will be handled in accordance with manufacturer specifications or Material Safety Data...
  348. Health and Safety > Safe Work Practices 2.8: Insulation Worker Safety

    2.8.4: Lead paint assessment

    Presence of lead based paint in pre-1978 homes will be assumed unless testing confirms otherwise EPA’s Renovation, Repair and Painting (RRP)...

    Presence of lead based paint in pre-1978 homes will be assumed unless testing confirms otherwise EPA’s Renovation, Repair and Painting (RRP)...
  349. 2.9 Sealing/Isolating Exposed Fibrous Insulation in Areas with Routine Human Activity

    Topic: Health and Safety Subtopic: Occupant Health 2.9 Detail Name: Sealing/Isolating Exposed Fibrous Insulation in Areas with Routine Human...

    Topic: Health and Safety Subtopic: Occupant Health 2.9 Detail Name: Sealing/Isolating Exposed Fibrous Insulation in Areas with Routine Human...
  350. Health and Safety > Occupant Health 2.9: Sealing/Isolating Exposed Fibrous Insulation in Areas with Routine Human Activity

    2.9.1: Fibrous Insulation Isolation

    Fibrous insulation materials will be encapsulated on all surfaces facing spaces where there is routine human activity Encapsulation materials...

    Fibrous insulation materials will be encapsulated on all surfaces facing spaces where there is routine human activity Encapsulation materials...
  351. 3.1 Central/Common Exhaust Fan Serving Multiple Dwelling Units via Common Duct(s) and Dwelling Unit Branches

    Topic: Exhaust Subtopic: Fans Ventilation 3.1 Detail Name: Central/Common Exhaust Fan Serving Multiple Dwelling Units via Common Duct(s) and...

    Topic: Exhaust Subtopic: Fans Ventilation 3.1 Detail Name: Central/Common Exhaust Fan Serving Multiple Dwelling Units via Common Duct(s) and...
  352. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.10: Backdraft dampers

    A backdraft damper will be installed at or near the fan A backdraft damper will be installed at each dwelling unit unless the fan runs on a...

    A backdraft damper will be installed at or near the fan A backdraft damper will be installed at each dwelling unit unless the fan runs on a...
  353. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.11: Combining intake ducts

    All individual intake ducts will be combined on the inlet side of fan (e.g., Y-fitting, T-fitting, collector box)

    All individual intake ducts will be combined on the inlet side of fan (e.g., Y-fitting, T-fitting, collector box)
  354. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.12: Duct connections

    All riser ducts or plenums will be connected and sealed to applicable intakes, collector box, fan and termination fitting Sealing activities will...

    All riser ducts or plenums will be connected and sealed to applicable intakes, collector box, fan and termination fitting Sealing activities will...
  355. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.13: Insulation

    All components outside of the thermal envelope will be insulated to a minimum of R-8 or equivalent to local codes

    All components outside of the thermal envelope will be insulated to a minimum of R-8 or equivalent to local codes
  356. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.14: Register boot to interior surface seal

    Register boot will be sealed to interior surfaces with sealants compatible to their intended surfaces Sealants will be continuous and meet fire...

    Register boot will be sealed to interior surfaces with sealants compatible to their intended surfaces Sealants will be continuous and meet fire...
  357. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.15: Preventing air leakage caused by exhaust fans

    Walls, ceilings and floors will be sealed to separate any occupied space from any unconditioned spaces and adjacent dwelling units (Refer to ASHRAE...

    Walls, ceilings and floors will be sealed to separate any occupied space from any unconditioned spaces and adjacent dwelling units (Refer to ASHRAE...
  358. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.16: Balance and flow

    Air flows will be measured and adjusted to match the design specification in accordance with ANSI ACCA Standard 5 or ANSI/ASHRAE Standard 111

    Air flows will be measured and adjusted to match the design specification in accordance with ANSI ACCA Standard 5 or ANSI/ASHRAE Standard 111
  359. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.17: Combustion zone testing

    Pressure effects caused by fans will be assessed and corrected when found outside of combustion safety standards

    Pressure effects caused by fans will be assessed and corrected when found outside of combustion safety standards
  360. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System)

    3.1.18: Fire Dampers

    Fire dampers must be accessible for inspection and/or testing by the local authorities. If fire dampers are not accessible from a grill or register,...

    Fire dampers must be accessible for inspection and/or testing by the local authorities. If fire dampers are not accessible from a grill or register,...
  361. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.19: Occupant/property manager education

    Occupant/property manager will be educated on purpose and value of system Property manager will be instructed on all maintenance procedures

    Occupant/property manager will be educated on purpose and value of system Property manager will be instructed on all maintenance procedures
  362. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.1: Pre-inspection

    Specifications will be field verified as appropriate to site conditions by installer

    Specifications will be field verified as appropriate to site conditions by installer
  363. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.2: Air flow

    Design air flow rate will be determined in accordance with local code requirements and/or the most current version of ASHRAE 62.2-2010 for inside...

    Design air flow rate will be determined in accordance with local code requirements and/or the most current version of ASHRAE 62.2-2010 for inside...
  364. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.3: Fan specification

    1 HP or larger motors will be National Electrical Manufacturer’s Association (NEMA) premium efficiency Fan will be capable of maintaining a...

    1 HP or larger motors will be National Electrical Manufacturer’s Association (NEMA) premium efficiency Fan will be capable of maintaining a...
  365. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.4: Fan outlet termination

    Outlet will be terminated outside of the building shell and will have a louvered cover and bird screen Minimum distance of exhaust outlet from any...

    Outlet will be terminated outside of the building shell and will have a louvered cover and bird screen Minimum distance of exhaust outlet from any...
  366. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.5: Wiring

    Wiring will be installed by a licensed contractor Wiring will be installed in accordance with original equipment manufacturer specifications and...

    Wiring will be installed by a licensed contractor Wiring will be installed in accordance with original equipment manufacturer specifications and...
  367. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.6: Access

    Fan and service switch will be accessible for maintenance

    Fan and service switch will be accessible for maintenance
  368. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.7: Outdoor/indoor fan mounting

    Fan will be oriented so the equivalent length of the duct run is as short as possible Fan will be mounted securely in accordance with ...

    Fan will be oriented so the equivalent length of the duct run is as short as possible Fan will be mounted securely in accordance with ...
  369. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.8: Connecting exposed ductwork

    All exposed ductwork outside of the building will be insulated to a minimum R-12, protected from weather exposure and sealed at all penetrations into...

    All exposed ductwork outside of the building will be insulated to a minimum R-12, protected from weather exposure and sealed at all penetrations into...
  370. Exhaust > Fans 3.1: Multiport Exhaust Fan and Single Inlet Exhaust Fan (with Distributed System) Single Fan Serving Rooms in Multiple Units (All Three Building Types)

    3.1.9: Fan/duct riser connection

    If fan is on curb, the riser will be flashed to the top of the curb and the fan will be sealed to the riser flashing If the fan is separate from...

    If fan is on curb, the riser will be flashed to the top of the curb and the fan will be sealed to the riser flashing If the fan is separate from...
  371. 3.10 Intakes

    Topic: Supply Subtopic: Components 3.10 Detail Name: Intakes Desired Outcome: Intake optimizes air flow while limiting the entry of...

    Topic: Supply Subtopic: Components 3.10 Detail Name: Intakes Desired Outcome: Intake optimizes air flow while limiting the entry of...
  372. Supply > Components 3.10: Intakes

    3.10.1: Hole in building shell

    Holes cut to accommodate the terminal fittings should be no more than 1/8" larger than the fitting itself.

    Holes cut to accommodate the terminal fittings should be no more than 1/8" larger than the fitting itself.
  373. Supply > Components 3.10: Intakes

    3.10.2: Intake fitting

    Intake fitting will have integrated collar at least the same diameter as the duct The fitting will be appropriate for regional weather conditions...

    Intake fitting will have integrated collar at least the same diameter as the duct The fitting will be appropriate for regional weather conditions...
  374. Supply > Components 3.10: Intakes

    3.10.3: Occupant education

    Intake fitting will be labeled “ventilation air intake” Occupant will be instructed to keep yard debris and other contaminants clear of the intake

    Intake fitting will be labeled “ventilation air intake” Occupant will be instructed to keep yard debris and other contaminants clear of the intake
  375. Supply > Components 3.10: Intakes

    3.10.4: Damper (if applicable)

    The damper will be installed to open in the direction of the desired flow Damper will close when system is off

    The damper will be installed to open in the direction of the desired flow Damper will close when system is off
  376. Supply > Components 3.10: Intakes

    3.10.5: Connection to intake fitting

    Duct to intake fitting will be connected and sealed in accordance with supply duct detail Ensure fasteners do not inhibit intake damper operation

    Duct to intake fitting will be connected and sealed in accordance with supply duct detail Ensure fasteners do not inhibit intake damper operation
  377. Supply > Components 3.10: Intakes

    3.10.6: Weatherproofing

    Exterior termination fitting will be flashed or weather sealed Water will be directed away from penetration Installation will not inhibit...

    Exterior termination fitting will be flashed or weather sealed Water will be directed away from penetration Installation will not inhibit...
  378. Supply > Components 3.10: Intakes

    3.10.7: Pest exclusion

    Screen material no less than Ľ” and no greater than ˝” hole size in any direction will be used Screen will be installed so it does...

    Screen material no less than Ľ” and no greater than ˝” hole size in any direction will be used Screen will be installed so it does...
  379. Supply > Components 3.10: Intakes

    3.10.8: Intake location

    Intake will be installed in accordance with all applicable code requirements and/or the most current version of ASHRAE 62.2

    Intake will be installed in accordance with all applicable code requirements and/or the most current version of ASHRAE 62.2
  380. 3.11 Ducts for Supply

    Topic: Supply Subtopic: Components 3.11 Detail Name: Ducts for Supply Desired Outcome: Supply ducts effectively move the required amount...

    Topic: Supply Subtopic: Components 3.11 Detail Name: Ducts for Supply Desired Outcome: Supply ducts effectively move the required amount...
  381. Supply > Components 3.11: Ducts for Supply

    3.11.1: Duct design and configuration

    Duct shall be designed in accordance with the applicable codes adopted by the jurisdiction

    Duct shall be designed in accordance with the applicable codes adopted by the jurisdiction
  382. Supply > Components 3.11: Ducts for Supply

    3.11.2: Duct insulation

    Ducts installed outside of the thermal envelope will be insulated to a minimum of R-8 or equivalent to local codes

    Ducts installed outside of the thermal envelope will be insulated to a minimum of R-8 or equivalent to local codes
  383. Supply > Components 3.11: Ducts for Supply

    3.11.3: Duct support

    Ducts will be supported as required by the applicable code adopted by the jurisdiction for the type of duct used

    Ducts will be supported as required by the applicable code adopted by the jurisdiction for the type of duct used
  384. Supply > Components 3.11: Ducts for Supply

    3.11.4: Duct connections

    Metal-to-metal or metal-to-PVC will be fastened with a minimum of three equally spaced screws Flexible duct-to-metal or flexible duct-to-PVC will...

    Metal-to-metal or metal-to-PVC will be fastened with a minimum of three equally spaced screws Flexible duct-to-metal or flexible duct-to-PVC will...
  385. Supply > Components 3.11: Ducts for Supply

    3.11.5: Duct materials

    Flexible duct materials will be UL 181 listed or Air Diffusion Council approved

    Flexible duct materials will be UL 181 listed or Air Diffusion Council approved
  386. Supply > Components 3.11: Ducts for Supply

    3.11.6: Outdoor air intake location

    Intake will be installed in accordance with all applicable code requirements and/or the most current version of ASHRAE 62.2

    Intake will be installed in accordance with all applicable code requirements and/or the most current version of ASHRAE 62.2
  387. 3.12 Balancing – Make Up/Outside Air (All Building Types)

    Topic: Ventilation Subtopic: Air Balancing 3.12 Detail Name: Balancing – Make Up/Outside Air (All Building Types) Desired Outcome:...

    Topic: Ventilation Subtopic: Air Balancing 3.12 Detail Name: Balancing – Make Up/Outside Air (All Building Types) Desired Outcome:...
  388. Ventilation > Air Balancing 3.12: Balancing – Make Up/Outside Air (All Building Types)

    3.12.1: Validate air distribution system installation

    System will be checked for existence of specified system components

    System will be checked for existence of specified system components
  389. Ventilation > Air Balancing 3.12: Balancing – Make Up/Outside Air (All Building Types)

    3.12.2: Testing equipment selection

    Measurement equipment will be selected so that design value will be within the accurate range of the measuring device Equipment will be capable of...

    Measurement equipment will be selected so that design value will be within the accurate range of the measuring device Equipment will be capable of...
  390. Ventilation > Air Balancing 3.12: Balancing – Make Up/Outside Air (All Building Types)

    3.12.3: Test main fan or air handler unit

    Equipment testing will check for: •Proper operation (programmed schedule/sequence of operation) •Proper rotation •Filter condition •Total flow at...

    Equipment testing will check for: •Proper operation (programmed schedule/sequence of operation) •Proper rotation •Filter condition •Total flow at...
  391. Ventilation > Air Balancing 3.12: Balancing – Make Up/Outside Air (All Building Types)

    3.12.4: Measure air flow and static pressure at terminals

    Air flow and static pressure will be measured and recorded Measurements will be taken with terminals as found, with no adjustments made to the...

    Air flow and static pressure will be measured and recorded Measurements will be taken with terminals as found, with no adjustments made to the...
  392. Ventilation > Air Balancing 3.12: Balancing – Make Up/Outside Air (All Building Types)

    3.12.5: Adjustment of system

    Adjustments will be made to fan speed, dampers and registers until design specifications are met

    Adjustments will be made to fan speed, dampers and registers until design specifications are met
  393. Ventilation > Air Balancing 3.12: Balancing – Make Up/Outside Air (All Building Types)

    3.12.6: Final balance

    Final air flow and/or pressure will be measured, confirmed and recorded at fan and terminals

    Final air flow and/or pressure will be measured, confirmed and recorded at fan and terminals
  394. Ventilation > Air Balancing 3.12: Balancing – Make Up/Outside Air (All Building Types)

    3.12.7: Occupant/Property Manager education

    Occupant/property manager will be : •Instructed on proper operation and maintenance procedures •Educated on value and need for recommissioning...

    Occupant/property manager will be : •Instructed on proper operation and maintenance procedures •Educated on value and need for recommissioning...
  395. 3.13 Primary Ventilation Air Flow Between Rooms

    Topic: Ventilation Subtopic: Air Flow Requirements 3.13 Detail Name: Primary Ventilation Air Flow Between Rooms Desired Outcome: Air...

    Topic: Ventilation Subtopic: Air Flow Requirements 3.13 Detail Name: Primary Ventilation Air Flow Between Rooms Desired Outcome: Air...
  396. Ventilation > Air Flow Requirements 3.13: Primary Ventilation Air Flow Between Rooms

    3.13.1: Balancing pressure

    An appropriate means of pressure balancing will be installed (e.g., transfer grilles, jumper ducts, individual room returns) No room will exceed...

    An appropriate means of pressure balancing will be installed (e.g., transfer grilles, jumper ducts, individual room returns) No room will exceed...
  397. 3.14 Filtration for Fan Powered (Active) Systems

    Topic: Ventilation Subtopic: Filters 3.14 Detail Name: Filtration for Fan Powered (Active) Systems Desired Outcome: Indoor air quality (IAQ)...

    Topic: Ventilation Subtopic: Filters 3.14 Detail Name: Filtration for Fan Powered (Active) Systems Desired Outcome: Indoor air quality (IAQ)...
  398. Ventilation > Filters 3.14: Filtration for Fan Powered (Active) Systems

    3.14.1: Pre-inspection

    Specifications will be field verified as appropriate to site conditions by installer

    Specifications will be field verified as appropriate to site conditions by installer
  399. Ventilation > Filters 3.14: Filtration for Fan Powered (Active) Systems

    3.14.2: Selection

    All mechanically supplied outdoor air will pass through filter before conditioning Filters and filter racks/holders will have a rating of MERV 6...

    All mechanically supplied outdoor air will pass through filter before conditioning Filters and filter racks/holders will have a rating of MERV 6...
  400. Ventilation > Filters 3.14: Filtration for Fan Powered (Active) Systems

    3.14.3: Installation

    Filter will be located and installed to facilitate access and regular service by occupant/maintenance staff Filter will be located on the inlet...

    Filter will be located and installed to facilitate access and regular service by occupant/maintenance staff Filter will be located on the inlet...
  401. Ventilation > Filters 3.14: Filtration for Fan Powered (Active) Systems

    3.14.4: Occupant/Property Manager education

    Occupant/property manager will be instructed on proper maintenance procedures and replacement schedule

    Occupant/property manager will be instructed on proper maintenance procedures and replacement schedule
  402. 3.15 Ventilation Existing Duct Sealing (All Building Types)

    Topic: Ventilation Subtopic: Duct Sealing 3.15 Detail Name: Ventilation Existing Duct Sealing (All Building Types) Desired Outcome:...

    Topic: Ventilation Subtopic: Duct Sealing 3.15 Detail Name: Ventilation Existing Duct Sealing (All Building Types) Desired Outcome:...
  403. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.10: Combustion zone testing

    Pressure effects caused by fans will be assessed and corrected when found outside of combustion safety standards

    Pressure effects caused by fans will be assessed and corrected when found outside of combustion safety standards
  404. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.11: Occupant/property manager education

    Occupant/property manager will be educated on how the system works and its purpose Occupant/property manager will be instructed to not alter or...

    Occupant/property manager will be educated on how the system works and its purpose Occupant/property manager will be instructed to not alter or...
  405. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.1: Pre-Inspection

    Specifications will be field verified as appropriate to site conditions by installer (e.g., fire dampers, other obstructions) Access to all...

    Specifications will be field verified as appropriate to site conditions by installer (e.g., fire dampers, other obstructions) Access to all...
  406. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.2: Health and Safety

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1929 or 1910) ...

    Health and safety concerns will be addressed for occupants, workers and repair materials in accordance with OSHA standards (OSHA 1929 or 1910) ...
  407. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.3: Identification of leakage locations

    Duct leakage sites will be identified using industry approved approaches (e.g., visual inspections, boroscopes, remote cameras, infrared...

    Duct leakage sites will be identified using industry approved approaches (e.g., visual inspections, boroscopes, remote cameras, infrared...
  408. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.4: Identify leakage locations to be sealed

    Duct sealing opportunities will be assessed and prioritized by: Type of hole: 1. Catastrophic holes disconnected, missing ducts or very large...

    Duct sealing opportunities will be assessed and prioritized by: Type of hole: 1. Catastrophic holes disconnected, missing ducts or very large...
  409. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.5: Temporary Access

    When demolition for access is specified, the installer will: •Make the temporary access using appropriate containment and worker protection •Seal...

    When demolition for access is specified, the installer will: •Make the temporary access using appropriate containment and worker protection •Seal...
  410. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.6: Preparation

    Ducts and registers will be cleaned before sealing Presence and type of dampers and smoke control devices will be identified and protected from...

    Ducts and registers will be cleaned before sealing Presence and type of dampers and smoke control devices will be identified and protected from...
  411. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.7: Material selection

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Duct sealants...

    Sealants and materials will be compatible with their intended surfaces and applied in accordance with manufacturer specifications Duct sealants...
  412. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.8: Duct Sealing

    Manual sealing of all accessible leakage areas will be completed first – •Reconnect disconnected ducts •Repair missing ducts with like materials ...

    Manual sealing of all accessible leakage areas will be completed first – •Reconnect disconnected ducts •Repair missing ducts with like materials ...
  413. Ventilation > Duct Sealing 3.15: Ventilation Existing Duct Sealing (All Building Types)

    3.15.9: Verification

    Final visual inspection of duct sealing activities and installer documentation will be completed Continued operation of dampers and smoke control...

    Final visual inspection of duct sealing activities and installer documentation will be completed Continued operation of dampers and smoke control...
  414. 3.16 Airflow Control Devices (All Building Types)

    Topic: Ventilation Subtopic: Controls 3.16 Detail Name: Airflow Control Devices (All Building Types) Desired Outcome: Efficient and...

    Topic: Ventilation Subtopic: Controls 3.16 Detail Name: Airflow Control Devices (All Building Types) Desired Outcome: Efficient and...
  415. Ventilation > Controls 3.16: Airflow Control Devices (All Building Types)

    3.16.1: Pre-inspection

    Specifications will be field verified as appropriate to site conditions by installer (e.g., duct size, type, shape, register type, duct stack...

    Specifications will be field verified as appropriate to site conditions by installer (e.g., duct size, type, shape, register type, duct stack...
  416. Ventilation > Controls 3.16: Airflow Control Devices (All Building Types)

    3.16.2: Preparation

    Duct cleaning will be performed in compliance with ANSI/ACCA 6 HVAC System Cleanliness-2007 Register cleaning or replacement will be performed as...

    Duct cleaning will be performed in compliance with ANSI/ACCA 6 HVAC System Cleanliness-2007 Register cleaning or replacement will be performed as...
  417. Ventilation > Controls 3.16: Airflow Control Devices (All Building Types)

    3.16.3: Material Selection

    Appropriate selection of air flow regulator or orifice will be confirmed by installer; if custom design is required, it will be determined by...

    Appropriate selection of air flow regulator or orifice will be confirmed by installer; if custom design is required, it will be determined by...
  418. Ventilation > Controls 3.16: Airflow Control Devices (All Building Types)

    3.16.4: Installation

    Transition or adapter will be securely fastened and sealed in accordance with manufacturer specifications Flow control device will be installed...

    Transition or adapter will be securely fastened and sealed in accordance with manufacturer specifications Flow control device will be installed...
  419. Ventilation > Controls 3.16: Airflow Control Devices (All Building Types)

    3.16.5: Balance and Flow

    Air flows will be measured and adjusted to match to the design specification in accordance with ANSI/ACCA Standard 5 or ANSI/ASHRAE Standard 111

    Air flows will be measured and adjusted to match to the design specification in accordance with ANSI/ACCA Standard 5 or ANSI/ASHRAE Standard 111
  420. Ventilation > Controls 3.16: Airflow Control Devices (All Building Types)

    3.16.6: Verification

    Final visual inspection of flow control installation and installer documentation will be completed Continued operation of dampers and smoke...

    Final visual inspection of flow control installation and installer documentation will be completed Continued operation of dampers and smoke...
  421. Ventilation > Controls 3.16: Airflow Control Devices (All Building Types)

    3.16.7: Occupant/property manager education

    Occupant/property manager will be educated on how the system works and its purpose Occupant/property manager will be educated on how to inspect...

    Occupant/property manager will be educated on how the system works and its purpose Occupant/property manager will be educated on how to inspect...
  422. 3.17 Operational Controls

    Topic: Ventilation Subtopic: Other Components 3.17 Detail Name: Operational Controls Desired Outcome: Fan controls support ventilation...

    Topic: Ventilation Subtopic: Other Components 3.17 Detail Name: Operational Controls Desired Outcome: Fan controls support ventilation...
  423. Ventilation > Other Components 3.17: Operational Controls

    3.17.1: Primary ventilation fan

    Specifications will be field verified as appropriate to site conditions by installer Controls will be used that can meet the following conditions: ...

    Specifications will be field verified as appropriate to site conditions by installer Controls will be used that can meet the following conditions: ...
  424. Ventilation > Other Components 3.17: Operational Controls

    3.17.2: Spot Fan

    Controls will be used that meet the following conditions: •Run fan continuously or intermittently depending on the intended schedule of operation...

    Controls will be used that meet the following conditions: •Run fan continuously or intermittently depending on the intended schedule of operation...
  425. Ventilation > Other Components 3.17: Operational Controls

    3.17.3: Wiring

    Wiring will be installed by a properly licensed contractor Wiring will be installed in accordance with original equipment manufacturer...

    Wiring will be installed by a properly licensed contractor Wiring will be installed in accordance with original equipment manufacturer...
  426. Ventilation > Other Components 3.17: Operational Controls

    3.17.4: Occupancy sensors/humidistat

    Manual override will be present on all controls Occupancy sensor and/or humidistat will be calibrated and commissioned effectively and on a...

    Manual override will be present on all controls Occupancy sensor and/or humidistat will be calibrated and commissioned effectively and on a...