  1. 1.1 Static Electric Shock

    Topic: Safe Work Practices Subtopic: Global Worker Safety Health and Safety 1.1 Detail Name: Static Electric Shock Desired Outcome:...

    Topic: Safe Work Practices Subtopic: Global Worker Safety Health and Safety 1.1 Detail Name: Static Electric Shock Desired Outcome:...
  2. Safe Work Practices > Global Worker Safety 1.1: Static Electric Shock

    1.1.1: Rigid fill tube

    Rigid fill tubes will be made of a material that will not hold an electric charge, such as Schedule 40 PVC Electrical Conduit, or be grounded

    Rigid fill tubes will be made of a material that will not hold an electric charge, such as Schedule 40 PVC Electrical Conduit, or be grounded
  3. Safe Work Practices > Global Worker Safety 1.1: Static Electric Shock

    1.1.2: Metal coupler grounding

    For an additional level of protection, metal coupler on the hose will be connected to the grounding wire Grounding wire will be connected to the...

    For an additional level of protection, metal coupler on the hose will be connected to the grounding wire Grounding wire will be connected to the...
  4. 1.2 House Current Electric Hazard

    Topic: Safe Work Practices Subtopic: Global Worker Safety 1.2 Detail Name: House Current Electric Hazard Desired Outcome: Prevention of...

    Topic: Safe Work Practices Subtopic: Global Worker Safety 1.2 Detail Name: House Current Electric Hazard Desired Outcome: Prevention of...
  5. Safe Work Practices > Global Worker Safety 1.2: House Current Electric Hazard

    1.2.1: Metal skin and frame grounding

    Metal skin and frame will be grounded through the panel box to avoid electrical shock

    Metal skin and frame will be grounded through the panel box to avoid electrical shock
  6. Safe Work Practices > Global Worker Safety 1.2: House Current Electric Hazard

    1.2.2: Metal fill tube grounding

    For an additional level of protection, metal fill tube will be connected to the grounding wire Grounding wire will be connected to the copper...

    For an additional level of protection, metal fill tube will be connected to the grounding wire Grounding wire will be connected to the copper...
  7. Safe Work Practices > Global Worker Safety 1.2: House Current Electric Hazard

    1.2.3: Electrical tool safety

    An electrical safety assessment will be performed All electric tools will be protected by ground-fault circuit interrupters (GFCI) Three-wire...

    An electrical safety assessment will be performed All electric tools will be protected by ground-fault circuit interrupters (GFCI) Three-wire...
  8. Safe Work Practices > Global Worker Safety 1.2: House Current Electric Hazard

    1.2.4: Aluminum wiring

    If aluminum wiring is present, work on the home will be stopped until the suspect wiring is inspected and determined to be safe by a licensed...

    If aluminum wiring is present, work on the home will be stopped until the suspect wiring is inspected and determined to be safe by a licensed...
  9. 1.3 Global Worker Safety

    Topic: Safe Work Practices Subtopic: Mobile Home Global Worker Safety 1.3 Detail Name: Global Worker Safety Desired Outcome: Work...

    Topic: Safe Work Practices Subtopic: Mobile Home Global Worker Safety 1.3 Detail Name: Global Worker Safety Desired Outcome: Work...
  10. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.10: Slips, trips and falls

    Caution will be used around power cords, hoses, tarps and plastic sheeting Precautions will be taken when ladders are used, when working at...

    Caution will be used around power cords, hoses, tarps and plastic sheeting Precautions will be taken when ladders are used, when working at...
  11. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.11: Heat and thermal stress

    Ensure staff is aware of risks during summer months including the symptoms of heat stroke and heat exhaustion Appropriate ventilation, hydration,...

    Ensure staff is aware of risks during summer months including the symptoms of heat stroke and heat exhaustion Appropriate ventilation, hydration,...
  12. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.12: Fire safety

    Ignition sources will be identified and eliminated (e.g., turn off pilot lights, space heaters and fuel supply) Use of flammable material will be...

    Ignition sources will be identified and eliminated (e.g., turn off pilot lights, space heaters and fuel supply) Use of flammable material will be...
  13. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.13: Crawl space safety

    The source of all contaminants (e.g., sewage, dead animals, needles) will be corrected, repaired or removed before performing inspections that...

    The source of all contaminants (e.g., sewage, dead animals, needles) will be corrected, repaired or removed before performing inspections that...
  14. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.1: Prevention through design

    Design will be incorporated to eliminate or minimize hazards (e.g., material selection, access to equipment for installation and maintenance,...

    Design will be incorporated to eliminate or minimize hazards (e.g., material selection, access to equipment for installation and maintenance,...
  15. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.2: Hand protection

    Durable and wrist protecting gloves will be worn that can withstand work activity

    Durable and wrist protecting gloves will be worn that can withstand work activity
  16. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.3: Respiratory protection

    If the risk of airborne contaminants cannot be prevented, proper respiratory protection will be provided and worn (e.g., N-95 or equivalent face...

    If the risk of airborne contaminants cannot be prevented, proper respiratory protection will be provided and worn (e.g., N-95 or equivalent face...
  17. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.4: Protective clothing

    If contaminants are present, (e.g., insulation materials) removable protective clothing will be worn Eye protection will always be worn (e.g.,...

    If contaminants are present, (e.g., insulation materials) removable protective clothing will be worn Eye protection will always be worn (e.g.,...
  18. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.5: Confined space safety

    Spaces with limited ingress and egress and restricted work area will be considered Confined Space. Access and egress points will be located before...

    Spaces with limited ingress and egress and restricted work area will be considered Confined Space. Access and egress points will be located before...
  19. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.6: Power tool safety

    Power tools will be inspected and used according to manufacturer specifications to minimize hazards associated with missing ground prongs, ungrounded...

    Power tools will be inspected and used according to manufacturer specifications to minimize hazards associated with missing ground prongs, ungrounded...
  20. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.7: Chemical safety

    The least toxic suitable material will be chosen Hazardous materials will be handled in accordance with manufacturer specifications or MSDS...

    The least toxic suitable material will be chosen Hazardous materials will be handled in accordance with manufacturer specifications or MSDS...
  21. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.8: Ergonomic safety

    Appropriate PPE will be used (e.g., knee pads, bump caps, additional padding) Proper equipment will be used for work Proper lifting techniques...

    Appropriate PPE will be used (e.g., knee pads, bump caps, additional padding) Proper equipment will be used for work Proper lifting techniques...
  22. Safe Work Practices > Mobile Home Global Worker Safety 1.3: Global Worker Safety

    1.3.9: Hand tool safety

    Hand tools will be used for intended purpose only

    Hand tools will be used for intended purpose only
  23. 1.4 Combustion Worker Safety

    Topic: Health and Safety Subtopic: Safe Work Practices 1.4 Detail Name: Combustion Worker Safety Desired Outcome Work completed safely...

    Topic: Health and Safety Subtopic: Safe Work Practices 1.4 Detail Name: Combustion Worker Safety Desired Outcome Work completed safely...
  24. Health and Safety > Safe Work Practices 1.4: Combustion Worker Safety

    1.4.1: Worker safety

    Follow all worker safety specifications in Global Worker Safety section

    Follow all worker safety specifications in Global Worker Safety section
  25. 2.1 Combustion Appliance Zone (CAZ) Testing

    Topic: Combustion Safety Testing Subtopic: Combustion Safety Testing – General Combustion Safety 2.1 Detail Name: Combustion Appliance Zone...

    Topic: Combustion Safety Testing Subtopic: Combustion Safety Testing – General Combustion Safety 2.1 Detail Name: Combustion Appliance Zone...
  26. Combustion Safety Testing > Combustion Safety Testing – General 1.201.1: Combustion Appliance Zone (CAZ) Testing

    2.1.1 : Assessment

    Emergency problems (e.g., gas leak, ambient CO levels that exceed 35 ppm) will be communicated clearly and immediately to the customer and...

    Emergency problems (e.g., gas leak, ambient CO levels that exceed 35 ppm) will be communicated clearly and immediately to the customer and...
  27. Combustion Safety Testing > Combustion Safety Testing  General 1.201.1: Combustion Appliance Zone (CAZ) Testing

    2.1.2: Fuel Leak Detection

    Inspect and test for gas or oil leakage at connections of natural gas, propane piping or oil systems If leaks are found, immediate action will be...

    Inspect and test for gas or oil leakage at connections of natural gas, propane piping or oil systems If leaks are found, immediate action will be...
  28. Combustion Safety Testing > Combustion Safety Testing  General 1.201.1: Combustion Appliance Zone (CAZ) Testing

    2.1.3: Venting

    The presence and operability of a draft regulator will be verified and tested Combustion venting systems will be inspected for damage, leaks,...

    The presence and operability of a draft regulator will be verified and tested Combustion venting systems will be inspected for damage, leaks,...
  29. Combustion Safety Testing > Combustion Safety Testing  General 1.201.1: Combustion Appliance Zone (CAZ) Testing

    2.1.4: Base pressure test

    Baseline pressure will be measured in Combustion Appliance Zone (CAZ) with reference to outdoors when testing any natural draft appliance

    Baseline pressure will be measured in Combustion Appliance Zone (CAZ) with reference to outdoors when testing any natural draft appliance
  30. Combustion Safety Testing > Combustion Safety Testing  General 1.201.1: Combustion Appliance Zone (CAZ) Testing

    2.1.5: Depressurization test

    CAZ depressurization testing will be administered on all natural draft equipment

    CAZ depressurization testing will be administered on all natural draft equipment
  31. Combustion Safety Testing > Combustion Safety Testing  General 1.201.1: Combustion Appliance Zone (CAZ) Testing

    2.1.6: Spillage test

    Appliance spillage testing will be administered on natural draft appliances and shall not exceed 2 minutes

    Appliance spillage testing will be administered on natural draft appliances and shall not exceed 2 minutes
  32. Combustion Safety Testing > Combustion Safety Testing  General 1.201.1: Combustion Appliance Zone (CAZ) Testing

    2.1.7: Carbon monoxide (CO) test in appliance vent

    CO will be tested for in undiluted flue gases of combustion appliances CO levels exceeding 100 ppm as measured, or 200 ppm air-free measurement,...

    CO will be tested for in undiluted flue gases of combustion appliances CO levels exceeding 100 ppm as measured, or 200 ppm air-free measurement,...
  33. Combustion Safety Testing > Combustion Safety Testing  General 2.1.8: Combustion Appliance Zone (CAZ) Testing

    2.1.8: Final Test Out

    Final combustion testing will be conducted at project completion to ensure compliance with the above specifications

    Final combustion testing will be conducted at project completion to ensure compliance with the above specifications
  34. 2.2 Unvented Space Heaters: Propane, Natural Gas, and Kerosene Heaters

    Topic: Combustion Safety Testing Subtopic: Unvented Space Heaters 2.2 Detail Name: Unvented Space Heaters: Propane, Natural Gas, and Kerosene...

    Topic: Combustion Safety Testing Subtopic: Unvented Space Heaters 2.2 Detail Name: Unvented Space Heaters: Propane, Natural Gas, and Kerosene...
  35. Combustion Safety Testing > Unvented Space Heaters 1.202.1: Unvented Space Heaters: Propane, Natural Gas, and Kerosene Heaters

    2.2.1 : Removal

    With the occupant’s permission, unvented heaters will be removed, except when used as a secondary heat source and when it can be confirmed that the...

    With the occupant’s permission, unvented heaters will be removed, except when used as a secondary heat source and when it can be confirmed that the...
  36. Combustion Safety Testing > Unvented Space Heaters 1.202.1: Unvented Space Heaters: Propane, Natural Gas, and Kerosene Heaters

    2.2.2: Occupant education

    Occupant will be educated on potential hazards of unvented combustion appliances (primary or secondary) within a living space

    Occupant will be educated on potential hazards of unvented combustion appliances (primary or secondary) within a living space
  37. 2.3 Combustion Air for Natural Draft Appliances

    Topic: Combustion Safety Testing Subtopic: Vented Gas Appliances 2.3 Detail Name: Combustion Air for Natural Draft Appliances Desired...

    Topic: Combustion Safety Testing Subtopic: Vented Gas Appliances 2.3 Detail Name: Combustion Air for Natural Draft Appliances Desired...
  38. Combustion Safety Testing > Vented Gas Appliances 1.203.1 : Combustion Air for Natural Draft Appliances

    2.3.1: Required combustion air

    The minimum required volume will be 50 cubic feet per 1,000 Btu/h in accordance with IRC G2407.5.1 or G2407.5.2, except that where the air...

    The minimum required volume will be 50 cubic feet per 1,000 Btu/h in accordance with IRC G2407.5.1 or G2407.5.2, except that where the air...
  39. Combustion Safety Testing > Vented Gas Appliances 1.203.1: Combustion Air for Natural Draft Appliances

    2.3.2: Additional combustion air (if action is required)

    Additional combustion air will be provided in accordance with IRC G2407

    Additional combustion air will be provided in accordance with IRC G2407
  40. Combustion Safety Testing > Vented Gas Appliances 1.203.1: Combustion Air for Natural Draft Appliances

    2.3.3: Spillage testing

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.
  41. Combustion Safety Testing > Vented Gas Appliances 1.203.1: Combustion Air for Natural Draft Appliances

    2.3.4: Occupant health & safety

    All homes will have a functioning CO alarm. EPA offers expanded actions If CO levels in interior living spaces exceed outdoor levels, investigate...

    All homes will have a functioning CO alarm. EPA offers expanded actions If CO levels in interior living spaces exceed outdoor levels, investigate...
  42. Combustion Safety Testing > Vented Gas Appliances 1.203.1: Combustion Air for Natural Draft Appliances

    2.3.5: Occupant education

    Occupants will be educated on the operation and maintenance of the CO alarm Completed work on combustion appliances and recommended maintenance...

    Occupants will be educated on the operation and maintenance of the CO alarm Completed work on combustion appliances and recommended maintenance...
  43. 2.4 Combustion Flue Gas – Orphaned Water Heaters

    Topic: Combustion Safety Testing Subtopic: Vented Gas Appliances 2.4 Detail Name: Combustion Flue Gas – Orphaned Water Heaters Desired...

    Topic: Combustion Safety Testing Subtopic: Vented Gas Appliances 2.4 Detail Name: Combustion Flue Gas – Orphaned Water Heaters Desired...
  44. Combustion Safety Testing > Vented Gas Appliances 1.203.2 : Combustion Flue Gas – Orphaned Water Heaters

    2.4.1: Spillage testing

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.
  45. Combustion Safety Testing > Vented Gas Appliances 1.203.2: Combustion Flue Gas  Orphaned Water Heaters

    2.4.2: Retesting spillage

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.
  46. Combustion Safety Testing > Vented Gas Appliances 1.203.2: Combustion Flue Gas  Orphaned Water Heaters

    2.4.3: Required combustion air

    The minimum required volume will be 50 cubic feet per 1,000 Btu/h in accordance with IRC G2407.5.1

    The minimum required volume will be 50 cubic feet per 1,000 Btu/h in accordance with IRC G2407.5.1
  47. Combustion Safety Testing > Vented Gas Appliances 1.203.2: Combustion Flue Gas  Orphaned Water Heaters

    2.4.4: Additional combustion air (if action is required)

    Additional combustion air will be provided in accordance with IRC G2407

    Additional combustion air will be provided in accordance with IRC G2407
  48. Combustion Safety Testing > Vented Gas Appliances 1.203.2: Combustion Flue Gas  Orphaned Water Heaters

    2.4.5: Occupant health and safety

    All homes will have a functioning CO alarm. EPA offers expanded actions If CO levels in interior living spaces exceed outdoor levels, investigate...

    All homes will have a functioning CO alarm. EPA offers expanded actions If CO levels in interior living spaces exceed outdoor levels, investigate...
  49. Combustion Safety Testing > Vented Gas Appliances 1.203.2: Combustion Flue Gas  Orphaned Water Heaters

    2.4.6: Occupant education

    Occupants will be educated on the operation and maintenance of the CO alarm Completed work on combustion appliances and recommended maintenance...

    Occupants will be educated on the operation and maintenance of the CO alarm Completed work on combustion appliances and recommended maintenance...
  50. 2.5 Draft Regulation – Category I Appliance

    Topic: Combustion Safety Testing Subtopic: Vented Gas Appliances 2.5 Detail Name: Draft Regulation – Category I Appliance Desired Outcome:...

    Topic: Combustion Safety Testing Subtopic: Vented Gas Appliances 2.5 Detail Name: Draft Regulation – Category I Appliance Desired Outcome:...
  51. Combustion Safety Testing > Vented Gas Appliances 1.203.3 : Draft Regulation – Category I Appliance

    2.5.1 : Assessment

    Oil systems having an operable draft regulator will be verified Combustion venting systems will be inspected for damage, leaks, disconnections...

    Oil systems having an operable draft regulator will be verified Combustion venting systems will be inspected for damage, leaks, disconnections...
  52. Combustion Safety Testing > Vented Gas Appliances 1.203.3: Draft Regulation  Category I Appliance

    2.5.2: Installation (if action is required)

    A draft regulator will be installed if necessary Manufacturer specifications for installation will be followed (e.g., size, type, location)

    A draft regulator will be installed if necessary Manufacturer specifications for installation will be followed (e.g., size, type, location)
  53. Combustion Safety Testing > Vented Gas Appliances 1.203.3: Draft Regulation  Category I Appliance

    2.5.3: Retesting spillage

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.

    If a combustion appliance spillage exceeds two minutes during pressure testing, specify measures to mitigate.
  54. Combustion Safety Testing > Vented Gas Appliances 1.203.3: Draft Regulation  Category I Appliance

    2.5.4: Occupant health & safety

    All homes will have a functioning CO alarm. EPA offers expanded actions If CO levels in interior living spaces exceed outdoor levels, potential...

    All homes will have a functioning CO alarm. EPA offers expanded actions If CO levels in interior living spaces exceed outdoor levels, potential...
  55. Combustion Safety Testing > Vented Gas Appliances 1.203.3: Draft Regulation  Category I Appliance

    2.5.5: Occupant education

    Occupants will be educated on the operation and maintenance of the CO alarm Completed work on combustion appliances and recommended maintenance...

    Occupants will be educated on the operation and maintenance of the CO alarm Completed work on combustion appliances and recommended maintenance...
  56. 2.6 Smoke Alarm

    Topic: Safety Devices Subtopic: Combustion Safety Devices 2.6 Detail Name: Smoke Alarm Desired Outcome: Properly installed smoke alarms

    Topic: Safety Devices Subtopic: Combustion Safety Devices 2.6 Detail Name: Smoke Alarm Desired Outcome: Properly installed smoke alarms
  57. Safety Devices > Combustion Safety Devices 1.301.1 : Smoke Detector

    2.6.1: Smoke alarm (hardwired)

    Smoke alarms will be listed and labeled in accordance with UL 217 and installed (hardwired) in accordance with the IRC or as required by the...

    Smoke alarms will be listed and labeled in accordance with UL 217 and installed (hardwired) in accordance with the IRC or as required by the...
  58. Safety Devices > Combustion Safety Devices 1.301.1: Smoke Detector

    2.6.2: Smoke alarm (battery operated)

    Battery operated alarms will be installed in accordance with the IRC and manufacturer specifications Number of smoke alarms installed will be per...

    Battery operated alarms will be installed in accordance with the IRC and manufacturer specifications Number of smoke alarms installed will be per...
  59. 2.7 Carbon Monoxide Alarm

    Topic: Safety Devices Subtopic: Combustion Safety Devices 2.7 Detail Name: Carbon Monoxide Alarm Desired Outcome: Properly installed CO...

    Topic: Safety Devices Subtopic: Combustion Safety Devices 2.7 Detail Name: Carbon Monoxide Alarm Desired Outcome: Properly installed CO...
  60. Safety Devices > Combustion Safety Devices 1.301.2 : Carbon Monoxide Detector or Monitor

    2.7.1: CO detection and warning equipment (hardwired)

    Hardwired CO detection or warning equipment will be installed in accordance with the IRC or as required by the authority having jurisdiction ...

    Hardwired CO detection or warning equipment will be installed in accordance with the IRC or as required by the authority having jurisdiction ...
  61. Safety Devices > Combustion Safety Devices 1.301.2: Carbon Monoxide Detector or Monitor

    2.7.2: CO detection and warning equipment (battery operated)

    Battery operated CO detection or warning equipment will be installed in accordance with the IRC and manufacturer specifications as required by the...

    Battery operated CO detection or warning equipment will be installed in accordance with the IRC and manufacturer specifications as required by the...
  62. 2.8 Combustion Safety

    Topic: Combustion Safety Testing Subtopic: Combustion Safety Testing – General 2.8 Detail Name: Combustion Safety Desired Outcome: Buildup...

    Topic: Combustion Safety Testing Subtopic: Combustion Safety Testing – General 2.8 Detail Name: Combustion Safety Desired Outcome: Buildup...
  63. Combustion Safety Testing > Combustion Safety Testing – General 1.201.2: Combustion Safety

    2.8.1: Outside combustion make-up air

    Combustion air will be provided from the outside and, where applicable, in accordance with the IRC for the type of appliance installed

    Combustion air will be provided from the outside and, where applicable, in accordance with the IRC for the type of appliance installed
  64. Combustion Safety Testing > Combustion Safety Testing  General 1.201.2: Combustion Safety

    2.8.2: New appliances

    If replacing appliances, a sealed-combustion, direct-vent appliance will be installed in accordance with manufacturer specifications and IRC G2427.8...

    If replacing appliances, a sealed-combustion, direct-vent appliance will be installed in accordance with manufacturer specifications and IRC G2427.8...
  65. Combustion Safety Testing > Combustion Safety Testing  General 1.201.2: Combustion Safety

    2.8.3: CO detection and warning equipment

    CO detection or warning equipment will be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms in accordance...

    CO detection or warning equipment will be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms in accordance...
  66. Combustion Safety Testing > Combustion Safety Testing - General 1.201.2: Combustion Safety

    2.8.4: Gas ovens

    Gas ovens will be tested for CO A clean and tune will be conducted if CO in undiluted flue gas exceeds 100ppm at steady state

    Gas ovens will be tested for CO A clean and tune will be conducted if CO in undiluted flue gas exceeds 100ppm at steady state
  67. Combustion Safety Testing > Combustion Safety Testing - General 1.201.2: Combustion Safety

    2.8.5: Gas range burners

    Specify clean and tune if the flame has any discoloration, flame impingement, or an irregular pattern or if burners are visibly dirty, corroded or...

    Specify clean and tune if the flame has any discoloration, flame impingement, or an irregular pattern or if burners are visibly dirty, corroded or...
  68. Combustion Safety Testing > Combustion Safety Testing - General 1.201.2: Combustion Safety

    2.8.6: Solid fuel burning appliances

    Replacement of solid fuel burning appliance with UL-listed and EPA-certified appliances if the existing appliance is not UL-listed or has signs of...

    Replacement of solid fuel burning appliance with UL-listed and EPA-certified appliances if the existing appliance is not UL-listed or has signs of...
  69. 2.9 Combustion Appliance Depressurization Limits Table

    Topic: Combustion Safety Testing Subtopic: Additional Resources 2.9 Combustion Appliance Depressurization Limits Table

    Topic: Combustion Safety Testing Subtopic: Additional Resources 2.9 Combustion Appliance Depressurization Limits Table
  70. 3.1 Whole House Exhaust Only Strategies

    Topic: Exhaust Subtopic: Whole House System Ventilation 3.1 Detail Name: Whole House Exhaust Only Strategies Whole house/common space/main...

    Topic: Exhaust Subtopic: Whole House System Ventilation 3.1 Detail Name: Whole House Exhaust Only Strategies Whole house/common space/main...
  71. Exhaust > Whole House System 3.1: Whole House Exhaust Only Strategies

    3.1.1: Assessment

    Assessment will be done using ASHRAE 62.2 standard: • Blower door test • Fan flow measurements • Calculations

    Assessment will be done using ASHRAE 62.2 standard: • Blower door test • Fan flow measurements • Calculations
  72. Exhaust > Whole House System 3.1: Whole House Exhaust Only Strategies

    3.1.2: Selection

    Fan type will be capable of continuous operation and selected in accordance with ASHRAE 62.2 for: • Sizing • Climate considerations • Control...

    Fan type will be capable of continuous operation and selected in accordance with ASHRAE 62.2 for: • Sizing • Climate considerations • Control...
  73. Exhaust > Whole House System 3.1: Whole House Exhaust Only Strategies

    3.1.3: Location

    No resistance greater than 3 Pascals will exist between fan intake location with reference to the common area

    No resistance greater than 3 Pascals will exist between fan intake location with reference to the common area
  74. Exhaust > Whole House System 3.1: Whole House Exhaust Only Strategies

    3.1.4: Climate considerations

    ASHRAE 62.2 will be referenced for climate considerations • Note: Whole house mechanical net exhaust flow for hot-humid climate will not exceed...

    ASHRAE 62.2 will be referenced for climate considerations • Note: Whole house mechanical net exhaust flow for hot-humid climate will not exceed...
  75. Exhaust > Whole House System 3.1: Whole House Exhaust Only Strategies

    3.1.5: Combustion Appliance Zone (CAZ) testing

    CAZ test will be performed where combustion appliances are utilized, where applicable

    CAZ test will be performed where combustion appliances are utilized, where applicable
  76. Exhaust > Whole House System 3.1: Whole House Exhaust Only Strategies

    3.1.6: Occupant education

    Occupant will be educated on: • Purpose of the ventilation system • Proper operation and use of controls • Cost and benefit of system • Manual...

    Occupant will be educated on: • Purpose of the ventilation system • Proper operation and use of controls • Cost and benefit of system • Manual...
  77. Exhaust > Whole House System 3.1: Whole House Exhaust Only Strategies

    3.1.7: Total exhaust airflow

    Total exhaust system airflow will be measured

    Total exhaust system airflow will be measured
  78. 3.2 Fan placement (Whole House/Common Space Exhaust Only)

    Topic: Exhaust Subtopic: Fans 3.2 Detail Name: Fan placement (Whole House/Common Space Exhaust Only) Desired Outcome: Provide primary...

    Topic: Exhaust Subtopic: Fans 3.2 Detail Name: Fan placement (Whole House/Common Space Exhaust Only) Desired Outcome: Provide primary...
  79. Exhaust > Fans 3.2: Fan placement (Whole House/Common Space Exhaust Only)

    3.2.1: Clearance

    Clearance for size of the fan recommended will be determined Consideration will be given for adequate head clearance

    Clearance for size of the fan recommended will be determined Consideration will be given for adequate head clearance
  80. Exhaust > Fans 3.2: Fan placement (Whole House/Common Space Exhaust Only)

    3.2.2: Power source

    Power source load will be determined as adequate Consideration will be given to power source location

    Power source load will be determined as adequate Consideration will be given to power source location
  81. Exhaust > Fans 3.2: Fan placement (Whole House/Common Space Exhaust Only)

    3.2.3: Location

    No resistance greater than 3 Pascals will exist between fan intake location with reference to the common area

    No resistance greater than 3 Pascals will exist between fan intake location with reference to the common area
  82. Exhaust > Fans 3.2: Fan placement (Whole House/Common Space Exhaust Only)

    3.2.4: Duct/vent

    Consideration will be given to: • Vent termination location • Amount of space for duct run • Roof condition and type (e.g., metal, shingle, bow...

    Consideration will be given to: • Vent termination location • Amount of space for duct run • Roof condition and type (e.g., metal, shingle, bow...
  83. Exhaust > Fans 3.2: Fan placement (Whole House/Common Space Exhaust Only)

    3.2.5: Attachment

    Fan will be secured to a structural component Structural integrity of the manufactured home will be maintained (e.g., roof trusses, walls, floor...

    Fan will be secured to a structural component Structural integrity of the manufactured home will be maintained (e.g., roof trusses, walls, floor...
  84. Exhaust > Fans 3.2: Fan placement (Whole House/Common Space Exhaust Only)

    3.2.6: Total exhaust airflow

    Total exhaust system airflow will be measured

    Total exhaust system airflow will be measured
  85. 3.3 Sound Ratings - New Fan Installation

    Topic: Exhaust Subtopic: Fans 3.3 Detail Name: Sound Ratings - New Fan Installation Desired Outcome: Systems operate as quietly as possible

    Topic: Exhaust Subtopic: Fans 3.3 Detail Name: Sound Ratings - New Fan Installation Desired Outcome: Systems operate as quietly as possible
  86. Exhaust > Fans 3.3: Sound Ratings - New Fan Installation

    3.3.1: Primary ventilation system/continuously operating fan

    System will be rated at a sound no greater than 1.0 Sone

    System will be rated at a sound no greater than 1.0 Sone
  87. Exhaust > Fans 3.3: Sound Ratings - New Fan Installation

    3.3.2: Intermittent spot ventilation system

    Spot ventilation (local mechanical exhaust systems operated as needed by the occupant; e.g., range hood, bath fans) will be rated at a sound no...

    Spot ventilation (local mechanical exhaust systems operated as needed by the occupant; e.g., range hood, bath fans) will be rated at a sound no...
  88. 3.4 Decommissioning Existing Exhaust or Supply Ventilation Systems

    Topic: Whole House Ventilation Subtopic: Ventilation System 3.4 Detail Name: Decommissioning Existing Exhaust or Supply Ventilation Systems ...

    Topic: Whole House Ventilation Subtopic: Ventilation System 3.4 Detail Name: Decommissioning Existing Exhaust or Supply Ventilation Systems ...
  89. Whole House Ventilation > Ventilation System 3.4: Decommissioning Existing Exhaust or Supply Ventilation Systems

    3.4.1: Power supply

    Power supply will be disconnected and properly terminated in visible junction box

    Power supply will be disconnected and properly terminated in visible junction box
  90. Whole House Ventilation > Ventilation System 3.4: Decommissioning Existing Exhaust or Supply Ventilation Systems

    3.4.2: Removal

    Fan components will be removed and disposed of lawfully Duct work will be removed if necessary OR Fan housing will be left in place, ducts...

    Fan components will be removed and disposed of lawfully Duct work will be removed if necessary OR Fan housing will be left in place, ducts...
  91. Whole House Ventilation > Ventilation System 3.4: Decommissioning Existing Exhaust or Supply Ventilation Systems

    3.4.3: Repair

    Fan opening will be sealed and insulated If necessary, the void from the duct work removal will be insulated Fan termination will be sealed

    Fan opening will be sealed and insulated If necessary, the void from the duct work removal will be insulated Fan termination will be sealed
  92. Whole House Ventilation > Ventilation System 3.4: Decommissioning Existing Exhaust or Supply Ventilation Systems

    3.4.4: Combustion Appliance Zone (CAZ) testing

    Combustion safety test will be performed where combustion appliances are utilized

    Combustion safety test will be performed where combustion appliances are utilized
  93. 3.5 Commissioning Existing Exhaust or Supply Ventilation Systems

    Topic: Whole House Ventilation Subtopic: Ventilation System 3.5 Detail Name: Commissioning Existing Exhaust or Supply Ventilation Systems ...

    Topic: Whole House Ventilation Subtopic: Ventilation System 3.5 Detail Name: Commissioning Existing Exhaust or Supply Ventilation Systems ...
  94. Whole House Ventilation > Ventilation System 3.5: Commissioning Existing Exhaust or Supply Ventilation Systems

    3.5.1: Systems check

    Visual inspection will be performed and documented for: Electrical connections Name plate (rated sone and flow) Damper operation (internal and...

    Visual inspection will be performed and documented for: Electrical connections Name plate (rated sone and flow) Damper operation (internal and...
  95. Whole House Ventilation > Ventilation System 3.5: Commissioning Existing Exhaust or Supply Ventilation Systems

    3.5.2: Verify flow rate

    Calibrated device will be used to test for flow measurement

    Calibrated device will be used to test for flow measurement
  96. Whole House Ventilation > Ventilation System 3.5: Commissioning Existing Exhaust or Supply Ventilation Systems

    3.5.3: Work order

    Work order will be developed as necessary in accordance with systems check and flow rate

    Work order will be developed as necessary in accordance with systems check and flow rate
  97. Whole House Ventilation > Ventilation System 3.5: Commissioning Existing Exhaust or Supply Ventilation Systems

    3.5.4: Total ventilation airflow

    Total exhaust and/or supply system ventilation airflow will be measured

    Total exhaust and/or supply system ventilation airflow will be measured
  98. 3.6 Ducts (Exhaust Fans)

    Topic: Exhaust Subtopic: Components 3.6 Detail Name: Ducts (Exhaust Fans) Desired Outcome Installed ducts effectively move the required...

    Topic: Exhaust Subtopic: Components 3.6 Detail Name: Ducts (Exhaust Fans) Desired Outcome Installed ducts effectively move the required...
  99. Exhaust > Components 3.6: Ducts (Exhaust Fans)

    3.6.1: Duct design and configuration

    Consideration will be given to: • Vent termination location • Amount of space for duct run • Roof condition, type and access (e.g., metal,...

    Consideration will be given to: • Vent termination location • Amount of space for duct run • Roof condition, type and access (e.g., metal,...
  100. Exhaust > Components 3.6: Ducts (Exhaust Fans)

    3.6.2: Duct insulation

    Ducts installed outside of the thermal envelope will be insulated to a minimum of R-8 or equivalent to local codes

    Ducts installed outside of the thermal envelope will be insulated to a minimum of R-8 or equivalent to local codes
  101. Exhaust > Components 3.6: Ducts (Exhaust Fans)

    3.6.3: Duct support

    Horizontal runs will be supported in accordance with flex duct manufacturer specifications, local codes Supports with a width of at least 1 ½”...

    Horizontal runs will be supported in accordance with flex duct manufacturer specifications, local codes Supports with a width of at least 1 ½”...
  102. Exhaust > Components 3.6: Ducts (Exhaust Fans)

    3.6.4: Duct connections

    Metal-to-metal or metal-to-PVC will be fastened with a minimum of three equally spaced screws Flexible duct-to-metal or flexible duct-to-PVC will...

    Metal-to-metal or metal-to-PVC will be fastened with a minimum of three equally spaced screws Flexible duct-to-metal or flexible duct-to-PVC will...
  103. Exhaust > Components 3.6: Ducts (Exhaust Fans)

    3.6.5: Duct materials

    Flexible materials will be UL 181 listed or Air Diffusion Council approved Rigid, smooth metal of 30-gauge wall thickness or thicker will be used ...

    Flexible materials will be UL 181 listed or Air Diffusion Council approved Rigid, smooth metal of 30-gauge wall thickness or thicker will be used ...
  104. Exhaust > Components 3.6: Ducts (Exhaust Fans)

    3.6.6: Total exhaust airflow

    Total exhaust system ventilation airflow will be measured

    Total exhaust system ventilation airflow will be measured
  105. 3.7 Intake to Forced Air System

    Topic: Supply Subtopic: Components 3.7 Detail Name: Intake to Forced Air System Desired Outcome Intake reduces pollutant entry, is...

    Topic: Supply Subtopic: Components 3.7 Detail Name: Intake to Forced Air System Desired Outcome Intake reduces pollutant entry, is...
  106. Supply > Components 3.7: Intake to Forced Air System

    3.7.1: Forced air system requirements

    Existing forced air system leakage to the outdoors will be less than 10% of the air handler flow, when measured at 25 Pascals with reference to the...

    Existing forced air system leakage to the outdoors will be less than 10% of the air handler flow, when measured at 25 Pascals with reference to the...
  107. Supply > Components 3.7: Intake to Forced Air System

    3.7.2: Wiring

    Wiring will be installed by a licensed electrician Wiring will be installed in accordance with original equipment manufacturer specifications and...

    Wiring will be installed by a licensed electrician Wiring will be installed in accordance with original equipment manufacturer specifications and...
  108. Supply > Components 3.7: Intake to Forced Air System

    3.7.3: Access

    Motorized damper and service switch will be accessible for maintenance

    Motorized damper and service switch will be accessible for maintenance
  109. Supply > Components 3.7: Intake to Forced Air System

    3.7.4: Mounting intake duct

    Ventilation duct will be attached as close to the HVAC systems fan as possible while remaining in compliance with manufacturer specifications ...

    Ventilation duct will be attached as close to the HVAC systems fan as possible while remaining in compliance with manufacturer specifications ...
  110. Supply > Components 3.7: Intake to Forced Air System

    3.7.5: Motorized damper

    A motorized damper or equivalent technology will be installed between the intake fitting and the return side of the air handler Air flow will be...

    A motorized damper or equivalent technology will be installed between the intake fitting and the return side of the air handler Air flow will be...
  111. Supply > Components 3.7: Intake to Forced Air System

    3.7.6: Intake filter

    An accessible filter designed for the system will be installed Filter will be able to remove contaminants consistent with at least minimum...

    An accessible filter designed for the system will be installed Filter will be able to remove contaminants consistent with at least minimum...
  112. Supply > Components 3.7: Intake to Forced Air System

    3.7.7: Occupant education

    Occupant will be educated on how and when to change filter

    Occupant will be educated on how and when to change filter
  113. Supply > Components 3.7: Intake to Forced Air System

    3.7.8: Intake ventilation airflow

    Total intake ventilation airflow will be measured

    Total intake ventilation airflow will be measured
  114. 4.1 Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Bottom Board

    Topic: Flooring Subtopic: Penetrations Air Sealing 4.1 Detail Name: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations Through...

    Topic: Flooring Subtopic: Penetrations Air Sealing 4.1 Detail Name: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations Through...
  115. Flooring > Penetrations 4.1: : Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Bottom Board

    4.1.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Structural integrity Standing water Raw sewage Insect infestation Pests...

    Installer pre-work assessment will be conducted to determine: Structural integrity Standing water Raw sewage Insect infestation Pests...
  116. Flooring > Penetrations 4.1: : Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Bottom Board

    4.1.2: Soft bottom board repair

    Patching material will be provided as needed to meet the specific characteristics of the bottom board material and the characteristics of the hole ...

    Patching material will be provided as needed to meet the specific characteristics of the bottom board material and the characteristics of the hole ...
  117. Flooring > Penetrations 4.1: : Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Bottom Board

    4.1.3: Hard bottom board repair

    Patching will be provided as needed to meet both the specific characteristics of the bottom board material and the characteristics of the hole ...

    Patching will be provided as needed to meet both the specific characteristics of the bottom board material and the characteristics of the hole ...
  118. Flooring > Penetrations 4.1: : Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Bottom Board

    4.1.4: Bottom board penetrations

    Combustion air supplies will be labeled for identification and will not be blocked or sealed Penetrations will be sealed to meet both the specific...

    Combustion air supplies will be labeled for identification and will not be blocked or sealed Penetrations will be sealed to meet both the specific...
  119. Flooring > Penetrations 4.1: : Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Bottom Board

    4.1.5: Materials

    Materials will be selected to comply with Manufactured Housing rules and regulations (e.g., Manufactured Housing Institute) Surface preparation...

    Materials will be selected to comply with Manufactured Housing rules and regulations (e.g., Manufactured Housing Institute) Surface preparation...
  120. 4.10 Replacing Window Glass

    Topic: Window and Door Sealing Subtopic: Cracked and Broken Glass 4.10 Detail Name: Replacing Window Glass Desired Outcome: Glass...

    Topic: Window and Door Sealing Subtopic: Cracked and Broken Glass 4.10 Detail Name: Replacing Window Glass Desired Outcome: Glass...
  121. Window and Door Sealing > Cracked and Broken Glass 4.10: Replacing Window Glass

    4.10.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Number Type Location Operating condition Wall construction Size

    Installer pre-work assessment will be conducted to determine: Number Type Location Operating condition Wall construction Size
  122. Window and Door Sealing > Cracked and Broken Glass 4.10: Replacing Window Glass

    4.10.2: Lead paint assessment

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...
  123. Window and Door Sealing > Cracked and Broken Glass 4.10: Replacing Window Glass

    4.10.3: Broken glass removal

    Damaged glass will be removed

    Damaged glass will be removed
  124. Window and Door Sealing > Cracked and Broken Glass 4.10: Replacing Window Glass

    4.10.4: Opening preparation

    Opening will be cleaned Original sealant/material will be removed

    Opening will be cleaned Original sealant/material will be removed
  125. Window and Door Sealing > Cracked and Broken Glass 4.10: Replacing Window Glass

    4.10.5: New glass installation

    Replacement glass will be sized to original width, height and depth Stops will be replaced or installed Glass will be sealed in accordance with...

    Replacement glass will be sized to original width, height and depth Stops will be replaced or installed Glass will be sealed in accordance with...
  126. 4.11 Replacement of Windows and Doors

    Topic: Window and Door Sealing Subtopic: Replacement 4.11 Detail Name: Replacement of Windows and Doors Desired Outcome: Smooth...

    Topic: Window and Door Sealing Subtopic: Replacement 4.11 Detail Name: Replacement of Windows and Doors Desired Outcome: Smooth...
  127. Window and Door Sealing > Cracked and Broken Glass 4.11: Replacement of Windows and Doors

    4.11.1: Work assessment

    Installer pre-work assessment will be conducted to determine: - Number - Type - Operating condition - Wall construction

    Installer pre-work assessment will be conducted to determine: - Number - Type - Operating condition - Wall construction
  128. Window and Door Sealing > Cracked and Broken Glass 4.11: Replacement of Windows and Doors

    4.11.2: Lead paint assessment

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...
  129. Window and Door Sealing > Cracked and Broken Glass 4.11: Replacement of Windows and Doors

    4.11.3: Window or door selection

    Window or door units will be designed for manufactured home use and will be ENERGY STAR qualified Rough opening will be measured before ordering...

    Window or door units will be designed for manufactured home use and will be ENERGY STAR qualified Rough opening will be measured before ordering...
  130. Window and Door Sealing > Cracked and Broken Glass 4.11: Replacement of Windows and Doors

    4.11.4: Rough opening preparation

    Existing units will be removed Opening will be cleaned Any damaged framing will be replaced Opening for installation will be prepared in...

    Existing units will be removed Opening will be cleaned Any damaged framing will be replaced Opening for installation will be prepared in...
  131. Window and Door Sealing > Cracked and Broken Glass 4.11: Replacement of Windows and Doors

    4.11.5: Window and door installation

    Window or door units will be installed in accordance with manufacturer specifications

    Window or door units will be installed in accordance with manufacturer specifications
  132. Window and Door Sealing > Cracked and Broken Glass 4.11: Replacement of Windows and Doors

    4.11.6: Safety

    Egress windows will only be replaced with egress windows

    Egress windows will only be replaced with egress windows
  133. Window and Door Sealing > Cracked and Broken Glass 4.11: Replacement of Windows and Doors

    4.11.7: Maintenance and occupant education

    Occupants will be notified of changes or repairs made and will be educated on how to operate and maintain window or door

    Occupants will be notified of changes or repairs made and will be educated on how to operate and maintain window or door
  134. 4.12 Interior Storm Windows

    Topic: Window and Door Sealing Subtopic: Maintenance and Repair 4.12 Detail Name: Interior Storm Windows Desired Outcome: Minimize air...

    Topic: Window and Door Sealing Subtopic: Maintenance and Repair 4.12 Detail Name: Interior Storm Windows Desired Outcome: Minimize air...
  135. Window and Door Sealing > Maintenance and Repair 4.12: Interior Storm Windows

    4.12.1: Work assessment

    Installer pre-work assessment will be conducted to determine: - Number - Type - Size - Condition of opening

    Installer pre-work assessment will be conducted to determine: - Number - Type - Size - Condition of opening
  136. Window and Door Sealing > Maintenance and Repair 4.12: Interior Storm Windows

    4.12.2: Fixed storm window

    Fixed interior storm windows will not be installed in egress locations

    Fixed interior storm windows will not be installed in egress locations
  137. Window and Door Sealing > Maintenance and Repair 4.12: Interior Storm Windows

    4.12.3: Installing operable storm window

    Operable interior storm windows will be installed in accordance with manufacturer specifications

    Operable interior storm windows will be installed in accordance with manufacturer specifications
  138. Window and Door Sealing > Maintenance and Repair 4.12: Interior Storm Windows

    4.12.4: Health and safety

    Interior storm windows will be operable and egress rated in egress locations

    Interior storm windows will be operable and egress rated in egress locations
  139. Window and Door Sealing > Maintenance and Repair 4.12: Interior Storm Windows

    4.12.5: Occupant education

    Occupants will be educated on the proper use and maintenance of storm windows

    Occupants will be educated on the proper use and maintenance of storm windows
  140. 4.13 Floor Framing – Bay Window

    Topic: Floor Sealing Subtopic: Floor Framing 4.13 Detail Name: Floor Framing – Bay Window Desired Outcome: Floor/framing around window...

    Topic: Floor Sealing Subtopic: Floor Framing 4.13 Detail Name: Floor Framing – Bay Window Desired Outcome: Floor/framing around window...
  141. Floor Sealing > Floor Framing 4.13: Floor Framing - Bay Window

    4.13.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Accessibility Number Type Size Operating condition Condition of opening Wall...

    Installer pre-work assessment will be conducted to determine: Accessibility Number Type Size Operating condition Condition of opening Wall...
  142. Floor Sealing > Floor Framing 4.13: Floor Framing - Bay Window

    4.13.2: Lead paint assessment

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...
  143. Floor Sealing > Floor Framing 4.13: Floor Framing - Bay Window

    4.13.3: Air infiltration

    Details that reduce air infiltration will be repaired, replaced, sealed or installed Bay window floor framing that connects interior to exterior...

    Details that reduce air infiltration will be repaired, replaced, sealed or installed Bay window floor framing that connects interior to exterior...
  144. Floor Sealing > Floor Framing 4.13: Floor Framing - Bay Window

    4.13.4: Water infiltration

    Details that reduce water infiltration will be repaired, replaced or installed

    Details that reduce water infiltration will be repaired, replaced or installed
  145. Floor Sealing > Floor Framing 4.13: Floor Framing - Bay Window

    4.13.5: Materials

    Materials will be used or installed in accordance with product manufacturer specifications

    Materials will be used or installed in accordance with product manufacturer specifications
  146. 4.14 Regional Considerations

    Topic: Attic Sealing Subtopic: Special Considerations 4.14 Detail Name: Regional Considerations

    Topic: Attic Sealing Subtopic: Special Considerations 4.14 Detail Name: Regional Considerations
  147. Attic Sealing > Special Considerations 4.14: Regional Considerations

    4.14.1: Cold

    Water-resistant sealants and/or closed cell foams (use a minimum of 2" to reach water barrier requirement) will be used in all attic sealing details

    Water-resistant sealants and/or closed cell foams (use a minimum of 2" to reach water barrier requirement) will be used in all attic sealing details
  148. Attic Sealing > Special Considerations 4.14: Regional Considerations

    4.14.2: Mixed humid

  149. Attic Sealing > Special Considerations 4.14: Regional Considerations

    4.14.3: Hot humid

    Plastic, foil or any other Class 1 vapor barrier will not be used

    Plastic, foil or any other Class 1 vapor barrier will not be used
  150. Attic Sealing > Special Considerations 4.14: Regional Considerations

    4.14.4: Marine

    Vapor permeable materials will be used to block and seal penetrations in attic

    Vapor permeable materials will be used to block and seal penetrations in attic
  151. Attic Sealing > Special Considerations 4.14: Regional Considerations

    4.14.5: Hot dry

  152. 4.2 Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring

    Topic: Flooring Subtopic: Penetrations 4.2 Detail Name: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring ...

    Topic: Flooring Subtopic: Penetrations 4.2 Detail Name: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring ...
  153. Flooring > Penetrations 4.2: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring

    4.2.1: Work assessment

    Installer pre-work assessment will be conducted to determine: - Structural integrity - Insect infestation - Pests - Accessibility - Plumbing...

    Installer pre-work assessment will be conducted to determine: - Structural integrity - Insect infestation - Pests - Accessibility - Plumbing...
  154. Flooring > Penetrations 4.2: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring

    4.2.2: Floor air sealing (decking, subfloor, floor decking)

    Backing or infill will be provided as needed to meet the specific characteristics of the selected sealant and the characteristics of the penetration ...

    Backing or infill will be provided as needed to meet the specific characteristics of the selected sealant and the characteristics of the penetration ...
  155. Flooring > Penetrations 4.2: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring

    4.2.3: Sealant selection

    Sealants will be used to fill holes no larger than recommended by manufacturer specifications Sealants will be compatible with all adjoining...

    Sealants will be used to fill holes no larger than recommended by manufacturer specifications Sealants will be compatible with all adjoining...
  156. Flooring > Penetrations 4.2: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring

    4.2.4: Floor repair

    Floor repair material will meet or exceed strength of existing floor material Repair will span from joist to joist and blocking added as needed to...

    Floor repair material will meet or exceed strength of existing floor material Repair will span from joist to joist and blocking added as needed to...
  157. Flooring > Penetrations 4.2: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring

    4.2.5: Structural materials

    Materials will be selected to comply with Manufactured Housing rules and regulations (e.g., Manufactured Housing Institute) Materials will be used...

    Materials will be selected to comply with Manufactured Housing rules and regulations (e.g., Manufactured Housing Institute) Materials will be used...
  158. Flooring > Penetrations 4.2: Electrical, HVAC, Plumbing, Gas, Dryer Vent, General Penetrations through Flooring

    4.2.6: High temperature application

    Only noncombustible materials will be used in contact with chimneys, combustion exhaust vents and flues

    Only noncombustible materials will be used in contact with chimneys, combustion exhaust vents and flues
  159. 4.3 Holes and Penetrations

    Topic: Walls Subtopic: Exterior Wall Penetrations 4.3 Detail Name: Holes and Penetrations Desired Outcome: Penetrations sealed to...

    Topic: Walls Subtopic: Exterior Wall Penetrations 4.3 Detail Name: Holes and Penetrations Desired Outcome: Penetrations sealed to...
  160. Walls > Exterior Wall Penetrations 4.3: Holes and Penetrations

    4.3.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Structural integrity Size of wall stud Insect infestation Accessibility...

    Installer pre-work assessment will be conducted to determine: Structural integrity Size of wall stud Insect infestation Accessibility...
  161. Walls > Exterior Wall Penetrations 4.3: Holes and Penetrations

    4.3.2: Materials

    Like material and/or compatible materials will be used for repairs Materials will be selected to comply with Manufactured Housing rules and...

    Like material and/or compatible materials will be used for repairs Materials will be selected to comply with Manufactured Housing rules and...
  162. Walls > Exterior Wall Penetrations 4.3: Holes and Penetrations

    4.3.3: Exterior wall air sealing

    All holes and penetrations on exterior surface of exterior walls will be sealed to ensure resistance to outdoor elements Intentionally ventilated...

    All holes and penetrations on exterior surface of exterior walls will be sealed to ensure resistance to outdoor elements Intentionally ventilated...
  163. 4.4 Holes and Penetrations

    Topic: Walls Subtopic: Interior Wall Penetrations 4.4 Detail Name: Holes and Penetrations Desired Outcome: Penetrations sealed to minimize...

    Topic: Walls Subtopic: Interior Wall Penetrations 4.4 Detail Name: Holes and Penetrations Desired Outcome: Penetrations sealed to minimize...
  164. Walls > Interior Wall Penetrations 4.4: Holes and Penetrations

    4.4.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Structural integrity Size of wall stud Insect infestation Accessibility...

    Installer pre-work assessment will be conducted to determine: Structural integrity Size of wall stud Insect infestation Accessibility...
  165. Walls > Interior Wall Penetrations 4.4: Holes and Penetrations

    4.4.2: Interior wall air sealing

    All accessible holes and penetrations in top and bottom plates will be sealed Backing or infill will be provided as needed to meet the specific...

    All accessible holes and penetrations in top and bottom plates will be sealed Backing or infill will be provided as needed to meet the specific...
  166. Walls > Interior Wall Penetrations 4.4: Holes and Penetrations

    4.4.3: Materials

    Like material and/or compatible materials will be used for repairs Materials will be selected to comply with Manufactured Housing rules and...

    Like material and/or compatible materials will be used for repairs Materials will be selected to comply with Manufactured Housing rules and...
  167. 4.5 Holes, Penetrations and Marriage Line

    Topic: Walls Subtopic: Marriage Wall Penetrations and Marriage Line 4.5 Detail Name: Holes, Penetrations and Marriage Line Desired...

    Topic: Walls Subtopic: Marriage Wall Penetrations and Marriage Line 4.5 Detail Name: Holes, Penetrations and Marriage Line Desired...
  168. Walls > Marriage Wall Penetrations and Marriage Line 4.5: Holes, Penetrations and Marriage Line

    4.5.1: Work assessment

    Installer pre-work assessment will be conducted to determine: - Structural integrity - Insect infestation - Accessibility - Number, type, size...

    Installer pre-work assessment will be conducted to determine: - Structural integrity - Insect infestation - Accessibility - Number, type, size...
  169. Walls > Marriage Wall Penetrations and Marriage Line 4.5: Holes, Penetrations and Marriage Line

    4.5.2: Marriage wall air sealing of holes and penetrations

    All accessible holes and penetrations in top and bottom plates will be sealed Backing or infill will be provided as needed to meet the specific...

    All accessible holes and penetrations in top and bottom plates will be sealed Backing or infill will be provided as needed to meet the specific...
  170. Walls > Marriage Wall Penetrations and Marriage Line 4.5: Holes, Penetrations and Marriage Line

    4.5.3: Marriage line air sealing

    All accessible holes and penetrations at marriage lines will be sealed continuously at end walls, floors and ceiling Backing or infill will be...

    All accessible holes and penetrations at marriage lines will be sealed continuously at end walls, floors and ceiling Backing or infill will be...
  171. Walls > Marriage Wall Penetrations and Marriage Line 4.5: Holes, Penetrations and Marriage Line

    4.5.4: Materials

    Materials will be used or installed in accordance with product manufacturer specifications

    Materials will be used or installed in accordance with product manufacturer specifications
  172. 4.6 General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting)

    Topic: Attics Subtopic: Penetrations 4.6 Detail Name: General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting) ...

    Topic: Attics Subtopic: Penetrations 4.6 Detail Name: General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting) ...
  173. Attics > Penetrations 4.6 : General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting)

    4.6.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Structural integrity Roof leaks Insect infestation Accessibility Number, type,...

    Installer pre-work assessment will be conducted to determine: Structural integrity Roof leaks Insect infestation Accessibility Number, type,...
  174. Attics > Penetrations 4.6: General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting)

    4.6.2: Air sealing penetrations

    Backing or infill will be provided as needed to meet the specific characteristics of the selected sealant and the characteristics of the penetration...

    Backing or infill will be provided as needed to meet the specific characteristics of the selected sealant and the characteristics of the penetration...
  175. Attics > Penetrations 4.6: General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting)

    4.6.3: Sealant selection

    Sealants will be used to fill holes no larger than recommended by manufacturer specifications Sealants will be compatible with all adjoining...

    Sealants will be used to fill holes no larger than recommended by manufacturer specifications Sealants will be compatible with all adjoining...
  176. Attics > Penetrations 4.6: General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting)

    4.6.4: Ceiling hole repair

    Ceiling repair material must meet or exceed strength of existing ceiling material Ceiling repair must span from truss to truss or add blocking as...

    Ceiling repair material must meet or exceed strength of existing ceiling material Ceiling repair must span from truss to truss or add blocking as...
  177. Attics > Penetrations 4.6: General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting)

    4.6.5: Materials

    Materials will be used or installed in accordance with product manufacturer specifications

    Materials will be used or installed in accordance with product manufacturer specifications
  178. Attics > Penetrations 4.6: General Penetrations (Electrical, HVAC, Plumbing, Vent Termination, Recessed Lighting)

    4.6.6: High temperature application

    Only noncombustible materials will be used in contact with chimneys, vents and flues

    Only noncombustible materials will be used in contact with chimneys, vents and flues
  179. 4.7 Combustion Water Heater Closet

    Topic: Air Sealing Subtopic: Combustion Water Heater Closet 4.7 Detail Name: Combustion Water Heater Closet Desired Outcome: Isolate...

    Topic: Air Sealing Subtopic: Combustion Water Heater Closet 4.7 Detail Name: Combustion Water Heater Closet Desired Outcome: Isolate...
  180. Air Sealing > Combustion Water Heater Closet 4.7: Combustion Water Heater Closet

    4.7.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Combustion safety Proper venting Structural integrity Roof leaks Insect...

    Installer pre-work assessment will be conducted to determine: Combustion safety Proper venting Structural integrity Roof leaks Insect...
  181. Air Sealing > Combustion Water Heater Closet 4.7: Combustion Water Heater Closet

    4.7.2: Air seal closet

    When the water heater closet contains a heater that is not sealed combustion or power vented, the closet will be isolated/separated from the rest...

    When the water heater closet contains a heater that is not sealed combustion or power vented, the closet will be isolated/separated from the rest...
  182. Air Sealing > Combustion Water Heater Closet 4.7: Combustion Water Heater Closet

    4.7.3: Materials

    Only noncombustible materials will be used in contact with chimneys, vents and flues

    Only noncombustible materials will be used in contact with chimneys, vents and flues
  183. Air Sealing > Combustion Water Heater Closet 4.7: Combustion Water Heater Closet

    4.7.4: Post work testing/verification

    Blower door assisted zonal pressure diagnostics will be used to verify isolation has been achieved

    Blower door assisted zonal pressure diagnostics will be used to verify isolation has been achieved
  184. 4.8 Holes, Penetrations and Connection Seam

    Topic: Attached Addition Sealing Subtopic: Additions 4.8 Detail Name: Holes, Penetrations and Connection Seam Desired Outcome: The...

    Topic: Attached Addition Sealing Subtopic: Additions 4.8 Detail Name: Holes, Penetrations and Connection Seam Desired Outcome: The...
  185. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.10: Ceiling hole repair

    Ceiling repair material must meet or exceed strength of existing ceiling material Ceiling repair must span from truss to truss or add blocking as...

    Ceiling repair material must meet or exceed strength of existing ceiling material Ceiling repair must span from truss to truss or add blocking as...
  186. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.11: High temperature application

    Only non-combustible materials will be used in contact with chimneys, vents and flues

    Only non-combustible materials will be used in contact with chimneys, vents and flues
  187. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Structural integrity Roof leaks Insect infestation Accessibility Mechanical...

    Installer pre-work assessment will be conducted to determine: Structural integrity Roof leaks Insect infestation Accessibility Mechanical...
  188. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.2: Hole, seam, line and penetration sealing

    Marriage wall seams will be sealed continuously at walls, floors and ceiling connection All accessible holes and penetrations in the addition...

    Marriage wall seams will be sealed continuously at walls, floors and ceiling connection All accessible holes and penetrations in the addition...
  189. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.3: Materials

    Materials will be used or installed in accordance with product manufacturer specifications

    Materials will be used or installed in accordance with product manufacturer specifications
  190. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.4: Addition exterior wall air sealing

    All holes and penetrations on exterior surface of exterior walls will be sealed to ensure resistance to outdoor elements Intentionally ventilated...

    All holes and penetrations on exterior surface of exterior walls will be sealed to ensure resistance to outdoor elements Intentionally ventilated...
  191. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.5: Addition interior wall air sealing

    All accessible holes and penetrations in top and bottom plates will be sealed Backing or infill will be provided as needed to meet the specific...

    All accessible holes and penetrations in top and bottom plates will be sealed Backing or infill will be provided as needed to meet the specific...
  192. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.6: Addition floor air sealing (decking, subfloor, floor decking)

    Backing or infill will be provided as needed to meet the specific characteristics of the selected sealant and the characteristics of the penetration ...

    Backing or infill will be provided as needed to meet the specific characteristics of the selected sealant and the characteristics of the penetration ...
  193. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.7: Sealant selection

    Sealants will be used to fill holes no larger than recommended by manufacturer specifications Sealants will be compatible with all adjoining...

    Sealants will be used to fill holes no larger than recommended by manufacturer specifications Sealants will be compatible with all adjoining...
  194. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.8: Floor repair

    Floor repair material will meet or exceed strength of existing floor material Repair will span from joist to joist and blocking added as needed to...

    Floor repair material will meet or exceed strength of existing floor material Repair will span from joist to joist and blocking added as needed to...
  195. Attached Addition Sealing > Additions 4.8: Holes, Penetrations and Connection Seam

    4.8.9: Structural materials

    Materials will be used or installed in accordance with product manufacturer specifications

    Materials will be used or installed in accordance with product manufacturer specifications
  196. 4.9 Windows and Doors – Maintenance and Repair

    Topic: Window and Door Sealing Subtopic: Maintenance and Repair 4.9 Detail Name: Windows and Doors – Maintenance and Repair Desired...

    Topic: Window and Door Sealing Subtopic: Maintenance and Repair 4.9 Detail Name: Windows and Doors – Maintenance and Repair Desired...
  197. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors – Maintenance and Repair

    4.9.1: Work assessment

    Installer pre-work assessment will be conducted to determine: Number Type Operating condition Wall construction

    Installer pre-work assessment will be conducted to determine: Number Type Operating condition Wall construction
  198. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors - Maintenance and Repair

    4.9.2: Lead paint assessment

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...

    Presence of lead-based paint in pre-1978 homes will be assumed unless testing confirms otherwise; documentation of testing results will be kept on...
  199. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors - Maintenance and Repair

    4.9.3: Operable windows and doors

    All egress windows will be operable as required by local codes All egress doors will be operable as required by local codes

    All egress windows will be operable as required by local codes All egress doors will be operable as required by local codes
  200. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors - Maintenance and Repair

    4.9.4: Air infiltration

    Details that reduce air infiltration will be repaired, replaced, sealed or installed (e.g., plastic gliders, weatherstripping, cranks, latches,...

    Details that reduce air infiltration will be repaired, replaced, sealed or installed (e.g., plastic gliders, weatherstripping, cranks, latches,...
  201. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors - Maintenance and Repair

    4.9.5: Water infiltration

    Details that reduce water infiltration will be repaired, replaced or installed (e.g., replace missing glazing on sash, exterior caulking, exterior...

    Details that reduce water infiltration will be repaired, replaced or installed (e.g., replace missing glazing on sash, exterior caulking, exterior...
  202. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors - Maintenance and Repair

    4.9.6: Materials

    Materials will be used or installed in accordance with product manufacturer specifications

    Materials will be used or installed in accordance with product manufacturer specifications
  203. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors - Maintenance and Repair

    4.9.7: Quality assurance

    Windows and doors will be adjusted to properly fit the jamb and allow for ease of operation and security

    Windows and doors will be adjusted to properly fit the jamb and allow for ease of operation and security
  204. Window and Door Sealing > Maintenance and Repair 4.9: Windows and Doors - Maintenance and Repair

    4.9.8: Occupant education and maintenance

    Occupants will be notified of changes or repairs made and will be educated on how to operate and maintain windows and doors

    Occupants will be notified of changes or repairs made and will be educated on how to operate and maintain windows and doors
  205. 5.1 Package Units – Repair and Service

    Topic: Forced Air Subtopic: Commissioning of Equipment Heating and Cooling 5.1 Detail Name: Package Units – Repair and Service Desired...

    Topic: Forced Air Subtopic: Commissioning of Equipment Heating and Cooling 5.1 Detail Name: Package Units – Repair and Service Desired...
  206. Forced Air > Commissioning of Equipment 5.1: Package Units – Repair and Service

    5.1.1: Work assessment

    Assessment will be performed to identify problems with air, refrigerant, electrical, load, safety, indoor environmental quality (IEQ) and/or other...

    Assessment will be performed to identify problems with air, refrigerant, electrical, load, safety, indoor environmental quality (IEQ) and/or other...
  207. Forced Air > Commissioning of Equipment 5.1: Package Units - Repair and Service

    5.1.2: Remove existing system components

    Non-salvageable components and waste will be removed and disposed of properly Refrigerant will be removed in accordance with EPA requirements

    Non-salvageable components and waste will be removed and disposed of properly Refrigerant will be removed in accordance with EPA requirements
  208. Forced Air > Commissioning of Equipment 5.1: Package Units - Repair and Service

    5.1.3: Repairs

    Repairs will be performed by qualified specialist as identified in the assessment Maintenance will be done in accordance with ANSI/ACCA 4...

    Repairs will be performed by qualified specialist as identified in the assessment Maintenance will be done in accordance with ANSI/ACCA 4...
  209. Forced Air > Commissioning of Equipment 5.1: Package Units - Repair and Service

    5.1.4: Service existing components

    Service will be performed by qualified personnel as identified in the assessment Maintenance will be done in accordance with ANSI/ACCA 4...

    Service will be performed by qualified personnel as identified in the assessment Maintenance will be done in accordance with ANSI/ACCA 4...
  210. Forced Air > Commissioning of Equipment 5.1: Package Units - Repair and Service

    5.1.5: Commissioning

    Equipment will be fully tested for proper operation following procedures outlined in ANSI/ACCA 5 QI-2010 Property manager/occupant will be...

    Equipment will be fully tested for proper operation following procedures outlined in ANSI/ACCA 5 QI-2010 Property manager/occupant will be...
  211. 5.10 Heating and Cooling Controls

    Topic: Forced Air Subtopic: Thermostat Replacement 5.10 Detail Name: Heating and Cooling Controls Desired Outcome Heating and cooling...

    Topic: Forced Air Subtopic: Thermostat Replacement 5.10 Detail Name: Heating and Cooling Controls Desired Outcome Heating and cooling...
  212. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.10: Heat pump: supplementary heat wiring

    Supplementary heat will be wired onto second stage heating terminal

    Supplementary heat will be wired onto second stage heating terminal
  213. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.11: Thermostat: installer programming

    The installer options will be set to match the thermostat to the equipment and control board settings

    The installer options will be set to match the thermostat to the equipment and control board settings
  214. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.12: Time delay settings

    Time delay for equipment will be set in accordance with manufacturer specifications and as appropriate for the climate zone (e.g., no time delay for...

    Time delay for equipment will be set in accordance with manufacturer specifications and as appropriate for the climate zone (e.g., no time delay for...
  215. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.13: Humidistat: location

    Humidistat will be installed to reflect humidity of the zone in which it is installed Humidistat will be installed in a dry location

    Humidistat will be installed to reflect humidity of the zone in which it is installed Humidistat will be installed in a dry location
  216. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.14: Ventilation control

    Ventilation controls will be connected to operational control system, as originally designed in the factory Powered ventilation system alarm will...

    Ventilation controls will be connected to operational control system, as originally designed in the factory Powered ventilation system alarm will...
  217. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.15: Occupant education

    Occupants will be educated on proper use of thermostat including: Proper use of setbacks for air conditioners and heat pumps Allowing occupant...

    Occupants will be educated on proper use of thermostat including: Proper use of setbacks for air conditioners and heat pumps Allowing occupant...
  218. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.1: Removal of mercury-based thermostats

    Mercury-based thermostat will be removed safely and recycled or disposed of in accordance with EPA regulations

    Mercury-based thermostat will be removed safely and recycled or disposed of in accordance with EPA regulations
  219. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.2: Removal of existing controls

    Existing controls will be removed in accordance with EPA lead safe work rules

    Existing controls will be removed in accordance with EPA lead safe work rules
  220. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.3: Penetrations

    Penetrations for control wiring will be sealed with a durable sealant (e.g. caulk, silicone, foam) at both the interior (e.g., floor, sheetrock) and...

    Penetrations for control wiring will be sealed with a durable sealant (e.g. caulk, silicone, foam) at both the interior (e.g., floor, sheetrock) and...
  221. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.4: Thermostat location

    Thermostats will be installed to reflect the temperature of the zone in which they are installed Mounting location for air leakage and conductance...

    Thermostats will be installed to reflect the temperature of the zone in which they are installed Mounting location for air leakage and conductance...
  222. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.5: Blower speed

    Blower speed will be set for equipment in accordance with manufacturer specifications

    Blower speed will be set for equipment in accordance with manufacturer specifications
  223. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.6: Thermostat selection: heat pump

    A thermostat with supplementary heat lockout that can interface with an outdoor temperature sensor will be selected

    A thermostat with supplementary heat lockout that can interface with an outdoor temperature sensor will be selected
  224. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.7: Heat pump: supplementary heat

    Supplementary heat lockout on air-to-air heat pumps will be set to the economical balance point ANSI/ACCA 3 Manual S-2004 Residential Equipment...

    Supplementary heat lockout on air-to-air heat pumps will be set to the economical balance point ANSI/ACCA 3 Manual S-2004 Residential Equipment...
  225. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.8: Heat pump: low ambient compressor lockout

    For air-to-air heat pumps, low ambient compressor lockout will be set to 0°F outdoor temperature or ambient compressor lockout will be disabled ...

    For air-to-air heat pumps, low ambient compressor lockout will be set to 0°F outdoor temperature or ambient compressor lockout will be disabled ...
  226. Forced Air > Thermostat Replacement 5.10: Heating and Cooling Controls

    5.10.9: Heat pump: outside temperature sensor

    An outdoor temperature sensor will be installed in accordance with manufacturer specifications

    An outdoor temperature sensor will be installed in accordance with manufacturer specifications
  227. 5.11 Data Plate Verification

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.11 Detail Name: Data Plate Verification Desired Outcome Data for...

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.11 Detail Name: Data Plate Verification Desired Outcome Data for...
  228. Forced Air > Commissioning of Equipment 5.11: Data Plate Verification

    5.11.1: Equipment data plate verification

    Equipment will be visually inspected Information will be recorded from the equipment data plates inside and outside

    Equipment will be visually inspected Information will be recorded from the equipment data plates inside and outside
  229. 5.12 Combustion Analysis Oil Fired Appliances

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.12 Detail Name: Combustion Analysis Oil Fired Appliances Desired Outcome...

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.12 Detail Name: Combustion Analysis Oil Fired Appliances Desired Outcome...
  230. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.10: Testing/inspection holes

    All testing and inspection holes will be sealed with approved materials

    All testing and inspection holes will be sealed with approved materials
  231. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.1: Oil system: Smoke test (This test must be conducted before any combustion testing is completed)

    Smoke spot reading will be in accordance with burner manufacturer specifications

    Smoke spot reading will be in accordance with burner manufacturer specifications
  232. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.2: Oil system: nozzle

    Nozzle size, angle and spray pattern will be correct for design input and within equipment firing rate of the heating system manufacturer

    Nozzle size, angle and spray pattern will be correct for design input and within equipment firing rate of the heating system manufacturer
  233. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.3: Oil filter

    Filter will be present, clean and leak free

    Filter will be present, clean and leak free
  234. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.4: Fuel pressure

    Measurement will be verified in accordance with manufacturer specifications

    Measurement will be verified in accordance with manufacturer specifications
  235. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.5: Oil system: steady state efficiency (SSE)

    Measurement will be verified in accordance with manufacturer specifications

    Measurement will be verified in accordance with manufacturer specifications
  236. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.6: Net stack temperature

    Net stack temperature will be measured and verified in accordance with manufacturer specifications

    Net stack temperature will be measured and verified in accordance with manufacturer specifications
  237. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.7: Carbon dioxide (CO2) and oxygen (O2)

    Measurement will be verified in accordance with industry manuals (e.g., Testo, Bacharach)

    Measurement will be verified in accordance with industry manuals (e.g., Testo, Bacharach)
  238. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.8: Excess combustion air

    Excess combustion air will be calculated and shown to be in accordance with industry manuals (e.g., Testo, Bacharach)

    Excess combustion air will be calculated and shown to be in accordance with industry manuals (e.g., Testo, Bacharach)
  239. Forced Air > Commissioning of Equipment 5.12: Combustion Analysis Oil Fired Appliances

    5.12.9: CO in flue gas

    CO in the undiluted flue gas will be less than 100 ppm

    CO in the undiluted flue gas will be less than 100 ppm
  240. 5.13 Electrical Service

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.13 Detail Name: Electrical Service Desired Outcome Electrical components...

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.13 Detail Name: Electrical Service Desired Outcome Electrical components...
  241. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.1: Service entrance

    Homes will have a four wire service entrance to the panel box to ensure a wiring system that is nominally rated at 120/240 volts and allows for...

    Homes will have a four wire service entrance to the panel box to ensure a wiring system that is nominally rated at 120/240 volts and allows for...
  242. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.2: Polarity

    Polarity of equipment will be verified by a qualified technician if wiring is to be modified or repaired

    Polarity of equipment will be verified by a qualified technician if wiring is to be modified or repaired
  243. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.3: Voltage: incoming power

    Voltage will be in accordance with manufacturer specifications

    Voltage will be in accordance with manufacturer specifications
  244. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.4: Voltage: contactor

    Voltage drop will be within acceptable range in accordance with manufacturer specifications

    Voltage drop will be within acceptable range in accordance with manufacturer specifications
  245. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.5: Grounding

    Grounding will be connected in compliance with local code requirements and ANSI/NEMA GR 1-2007, and NFPA 70 National Electric Code Frames of home...

    Grounding will be connected in compliance with local code requirements and ANSI/NEMA GR 1-2007, and NFPA 70 National Electric Code Frames of home...
  246. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.6: Blower amperage

    Amperage will not exceed manufacturer full load amperage

    Amperage will not exceed manufacturer full load amperage
  247. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.7: Compressor amperage

    Amperage will not exceed manufacturer full load amperage

    Amperage will not exceed manufacturer full load amperage
  248. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.8: Door switch operation

    Blower compartment safety switch operation will be verified if present

    Blower compartment safety switch operation will be verified if present
  249. Forced Air > Commissioning of Equipment 5.13: Electrical Service

    5.13.9: Heat pump: emergency heat

    Emergency heat circuit functions will be verified

    Emergency heat circuit functions will be verified
  250. 5.14 Regional Considerations

    Topic: Forced Air Subtopic: Special Considerations 5.14 Detail Name: Regional Considerations

    Topic: Forced Air Subtopic: Special Considerations 5.14 Detail Name: Regional Considerations
  251. Forced Air > Special Considerations 5.14: Regional Considerations

    5.14.1: Very cold

    New systems will be installed inside of the conditioned space of the house Condensate line will be insulated The house, as well as individual...

    New systems will be installed inside of the conditioned space of the house Condensate line will be insulated The house, as well as individual...
  252. Forced Air > Special Considerations 5.14: Regional Considerations

    5.14.2: Cold

    Combustion inlets will be installed in accordance with mechanical standards and authority having jurisdiction (e.g., inlets will be terminated above...

    Combustion inlets will be installed in accordance with mechanical standards and authority having jurisdiction (e.g., inlets will be terminated above...
  253. Forced Air > Special Considerations 5.14: Regional Considerations

    5.14.3: Mixed humid

    Refrigerant charge will be in accordance with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements ...

    Refrigerant charge will be in accordance with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements ...
  254. Forced Air > Special Considerations 5.14: Regional Considerations

    5.14.4: Hot humid

    Refrigerant charge will be in accordance with with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements ...

    Refrigerant charge will be in accordance with with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements ...
  255. Forced Air > Special Considerations 5.14: Regional Considerations

    5.14.5: Marine

    Refrigerant charge will be in accordance with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements ...

    Refrigerant charge will be in accordance with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements ...
  256. Forced Air > Special Considerations 5.14: Regional Considerations

    5.14.6: Hot dry

    Refrigerant charge will be in accordance with with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements

    Refrigerant charge will be in accordance with with ANSI/ACCA 5 QI-2010 HVAC Quality Installation Specification refrigerant charging requirements
  257. 5.15 Preparation and Mechanical Fastening

    Topic: Ducts Subtopic: Duct Sealing 5.15 Detail Name: Preparation and Mechanical Fastening Desired Outcome Ducts and plenums...

    Topic: Ducts Subtopic: Duct Sealing 5.15 Detail Name: Preparation and Mechanical Fastening Desired Outcome Ducts and plenums...
  258. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.1: Preparation

    Surrounding insulation will be cleared to expose joints being sealed; salvage for reuse if possible Duct surface to receive sealant will be cleaned

    Surrounding insulation will be cleared to expose joints being sealed; salvage for reuse if possible Duct surface to receive sealant will be cleaned
  259. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.2: Metal to metal

    Ducts will be fastened with a minimum of three equally spaced screws

    Ducts will be fastened with a minimum of three equally spaced screws
  260. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.3: Flex to metal

    Joints will be fastened with tie bands using a tie band tensioning tool For oval flexible duct to metal connections, tie bands cannot be used;...

    Joints will be fastened with tie bands using a tie band tensioning tool For oval flexible duct to metal connections, tie bands cannot be used;...
  261. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.4: Duct board to duct board

    Joints will be fastened with outward clinching (stitch) staples and c-channels if possible

    Joints will be fastened with outward clinching (stitch) staples and c-channels if possible
  262. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.5: Duct board to flexible duct

    Metal take-off collar specifically designed for the thickness of the duct board will be used All fingertabs will be bent down securely ...

    Metal take-off collar specifically designed for the thickness of the duct board will be used All fingertabs will be bent down securely ...
  263. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.6: Duct board plenum to air handler cabinet

    Flange/c-channel will be fastened with screws with the duct board installed between c-channel flanges Duct board plenum will be connected to air...

    Flange/c-channel will be fastened with screws with the duct board installed between c-channel flanges Duct board plenum will be connected to air...
  264. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.7: Boot to wood

    Pre-drill for screws or use ring shanked nails to fasten boot to wood

    Pre-drill for screws or use ring shanked nails to fasten boot to wood
  265. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.8: Boot to gypsum

    If accessible, boot hanger will be fastened to adjacent framing with screws or nails Boot will be connected to boot hanger with screws If...

    If accessible, boot hanger will be fastened to adjacent framing with screws or nails Boot will be connected to boot hanger with screws If...
  266. Ducts > Duct Sealing 5.15: Preparation and Mechanical Fastening

    5.15.9: Duct board to flex

    Metal take-off collar with a hip and an internal metal backer will be used Take-offs will be in accordance code requirements

    Metal take-off collar with a hip and an internal metal backer will be used Take-offs will be in accordance code requirements
  267. 5.16 Support for horizontal, suspended ducts

    Topic: Ducts Subtopic: Duct Sealing 5.16 Detail Name: Support for horizontal, suspended ducts Desired Outcome Ducts and plenums...

    Topic: Ducts Subtopic: Duct Sealing 5.16 Detail Name: Support for horizontal, suspended ducts Desired Outcome Ducts and plenums...
  268. Ducts > Duct Sealing 5.16: Support for horizontal, suspended ducts

    5.16.1: Support (applies to all duct types)

    Flexible and duct board ducts and plenums will be supported where feasible in accordance with flex duct manufacturer specifications and local codes ...

    Flexible and duct board ducts and plenums will be supported where feasible in accordance with flex duct manufacturer specifications and local codes ...
  269. 5.17 Air Sealing System

    Topic: Ducts Subtopic: Duct Sealing 5.17 Detail Name: Air Sealing System Desired Outcome Ducts and plenums sealed to prevent leakage

    Topic: Ducts Subtopic: Duct Sealing 5.17 Detail Name: Air Sealing System Desired Outcome Ducts and plenums sealed to prevent leakage
  270. Ducts > Duct Sealing 5.17: Air Sealing System

    5.17.1: New component to new component sealant selection

    Any closure system used will meet or exceed applicable standards

    Any closure system used will meet or exceed applicable standards
  271. Ducts > Duct Sealing 5.17: Air Sealing System

    5.17.2: New component to existing component

    Duct surface to receive sealant will be cleaned Seams, cracks, joints, holes and penetrations less than ¼” will be sealed using fiberglass mesh...

    Duct surface to receive sealant will be cleaned Seams, cracks, joints, holes and penetrations less than ¼” will be sealed using fiberglass mesh...
  272. Ducts > Duct Sealing 5.17: Air Sealing System

    5.17.3: Existing component to existing component

    Duct surface to receive sealant will be cleaned Fiberglass mesh and mastic will overlap temporary tape by at least 1” on all sides Seams,...

    Duct surface to receive sealant will be cleaned Fiberglass mesh and mastic will overlap temporary tape by at least 1” on all sides Seams,...
  273. Ducts > Duct Sealing 5.17: Air Sealing System

    5.17.4: Performance Testing

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...
  274. 5.18 Proprietary Spray Application

    Topic: Ducts Subtopic: Duct Sealing 5.18 Detail Name: Proprietary Spray Application Desired Outcome Ducts and plenums sealed to...

    Topic: Ducts Subtopic: Duct Sealing 5.18 Detail Name: Proprietary Spray Application Desired Outcome Ducts and plenums sealed to...
  275. Ducts > Duct Sealing 5.18: Proprietary Spray Application

    5.18.1: Internal or external application

    Sealant will be applied in accordance with manufacturer specifications as well as UL 181M, NFPA 90A, and NFPA 90B

    Sealant will be applied in accordance with manufacturer specifications as well as UL 181M, NFPA 90A, and NFPA 90B
  276. 5.19 Air Sealing System Components

    Topic: Ducts Subtopic: Duct Sealing 5.19 Detail Name: Air Sealing System Components Desired Outcome Ducts and plenums sealed to...

    Topic: Ducts Subtopic: Duct Sealing 5.19 Detail Name: Air Sealing System Components Desired Outcome Ducts and plenums sealed to...
  277. Ducts > Duct Sealing 5.19: Air Sealing System Components

    5.19.1: Duct boot to interior surface

    Gaps between boot and gypsum less than a ¼” will be sealed using mastic or appropriate flexible caulking Gypsum edge will be wetted before...

    Gaps between boot and gypsum less than a ¼” will be sealed using mastic or appropriate flexible caulking Gypsum edge will be wetted before...
  278. Ducts > Duct Sealing 5.19: Air Sealing System Components

    5.19.2: Air handler cabinet outside conditioned space

    Joints will be sealed and cracks/holes not needed for proper function of unit will be sealed using removable sealant (e.g., duct tape)

    Joints will be sealed and cracks/holes not needed for proper function of unit will be sealed using removable sealant (e.g., duct tape)
  279. Ducts > Duct Sealing 5.19: Air Sealing System Components

    5.19.3: Performance Testing

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...
  280. 5.2 Commissioning: refrigerant charge

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.2 Detail Name: Commissioning: Refrigerant Charge Desired Outcome: Properly...

    Topic: Forced Air Subtopic: Commissioning of Equipment 5.2 Detail Name: Commissioning: Refrigerant Charge Desired Outcome: Properly...
  281. Forced Air > Commissioning of Equipment 5.2: Commissioning: Refrigerant Charge

    5.2.1: Pre-requisite

    Leak detection, air flow and refrigerant line inspection will be checked and repaired to determine need for refrigerant charge

    Leak detection, air flow and refrigerant line inspection will be checked and repaired to determine need for refrigerant charge
  282. Forced Air > Commissioning of Equipment 5.2: Commissioning: Refrigerant Charge

    5.2.2: Qualified contractor

    Charge will be tested and work performed by a qualified contractor

    Charge will be tested and work performed by a qualified contractor
  283. Forced Air > Commissioning of Equipment 5.2: Commissioning: Refrigerant Charge

    5.2.3: Documentation

    Contractor will provide documentation of work performed

    Contractor will provide documentation of work performed
  284. Forced Air > Commissioning of Equipment 5.2: Commissioning: Refrigerant Charge

    5.2.4: Quality assurance

    External static pressure will be measured and documented EPA refrigerant charge log will be provided

    External static pressure will be measured and documented EPA refrigerant charge log will be provided
  285. 5.20 Return – Framed Platform

    Topic: Ducts Subtopic: Duct Sealing 5.20 Detail Name: Return – Framed Platform Desired Outcome The return duct is installed to...

    Topic: Ducts Subtopic: Duct Sealing 5.20 Detail Name: Return – Framed Platform Desired Outcome The return duct is installed to...
  286. Ducts > Duct Sealing 5.20: Return – Framed Platform

    5.20.1: Preparation

    Debris and dirt will be cleaned out of the return platform

    Debris and dirt will be cleaned out of the return platform
  287. Ducts > Duct Sealing 5.20: Return  Framed Platform

    5.20.2: Infill and backing

    Backing or infill will be provided as needed to meet the specific characteristics of the selected material and the characteristics of the open space...

    Backing or infill will be provided as needed to meet the specific characteristics of the selected material and the characteristics of the open space...
  288. Ducts > Duct Sealing 5.20: Return  Framed Platform

    5.20.3: Sealant selection

    Sealants will be compatible with their intended surfaces Sealants will be continuous and meet fire barrier specifications

    Sealants will be compatible with their intended surfaces Sealants will be continuous and meet fire barrier specifications
  289. 5.21 Removing Supply Vents From Garages

    Topic: Ducts Subtopic: Duct Sealing 5.21 Detail Name: Removing Supply Vents From Garages Desired Outcome Safe removal of garage supply...

    Topic: Ducts Subtopic: Duct Sealing 5.21 Detail Name: Removing Supply Vents From Garages Desired Outcome Safe removal of garage supply...
  290. Ducts > Duct Sealing 5.21: Removing Supply Vents From Garages

    5.21.1: Removal of supply run feeding vent in garage

    Supply run feeding the register will be truncated closest to the supply plenum as possible If directly connected to the plenum, the supply run...

    Supply run feeding the register will be truncated closest to the supply plenum as possible If directly connected to the plenum, the supply run...
  291. Ducts > Duct Sealing 5.21: Removing Supply Vents From Garages

    5.21.2: Patching of the hole in the duct system created by removal

    All holes in sheet metal ducts will be patched with sheet metal and secured with sufficient screws to hold the patch flat without gaps Holes left...

    All holes in sheet metal ducts will be patched with sheet metal and secured with sufficient screws to hold the patch flat without gaps Holes left...
  292. Ducts > Duct Sealing 5.21: Removing Supply Vents From Garages

    5.21.3: Sealing of the patch

    All patches will be sealed with mastic meeting UL 181 and in accordance with manufacturer specifications

    All patches will be sealed with mastic meeting UL 181 and in accordance with manufacturer specifications
  293. Ducts > Duct Sealing 5.21: Removing Supply Vents From Garages

    5.21.4: Removal of discarded ducts

    All abandoned ductwork will be removed from work area

    All abandoned ductwork will be removed from work area
  294. Ducts > Duct Sealing 5.21: Removing Supply Vents From Garages

    5.21.5: Patching of the register hole in garage

    Holes created by the removal of the register and boot will be patched and taped using material meeting local fire wall/separation codes

    Holes created by the removal of the register and boot will be patched and taped using material meeting local fire wall/separation codes
  295. Ducts > Duct Sealing 5.21: Removing Supply Vents From Garages

    5.21.6: External static pressure testing

    Units will be tested for external static pressure (ESP) before and after work If there is a significant rise in ESP, air flow testing will be...

    Units will be tested for external static pressure (ESP) before and after work If there is a significant rise in ESP, air flow testing will be...
  296. Ducts > Duct Sealing 5.21: Removing Supply Vents From Garages

    5.21.7: CAZ testing

    CAZ testing will be performed where combustion appliances are utilized

    CAZ testing will be performed where combustion appliances are utilized
  297. 5.22 Insulating Flex Ducts

    Topic: Ducts Subtopic: Duct Insulation 5.22 Detail Name: Insulating Flex Ducts Desired Outcome Lower conductive heat transfer by ducts...

    Topic: Ducts Subtopic: Duct Insulation 5.22 Detail Name: Insulating Flex Ducts Desired Outcome Lower conductive heat transfer by ducts...
  298. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.10: Completeness of vapor barrier

    Vapor barrier of all duct insulation will be taped to the flex duct using the taping system required by the manufacturer of the duct insulation ...

    Vapor barrier of all duct insulation will be taped to the flex duct using the taping system required by the manufacturer of the duct insulation ...
  299. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.11: Vermin proofing

    Vermin access points will be identified and treated appropriately (e.g., seal access holes)

    Vermin access points will be identified and treated appropriately (e.g., seal access holes)
  300. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.12: CAZ testing

    CAZ testing will be performed where combustion appliances are utilized

    CAZ testing will be performed where combustion appliances are utilized
  301. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.1: Removal of existing flexible ducting

    All accessible low R-value flexible ducting not meeting local codes will be removed from premises and adequate insulation will be added

    All accessible low R-value flexible ducting not meeting local codes will be removed from premises and adequate insulation will be added
  302. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.2: Selection of new flexible ducting

    All flexible ducting will have a minimum of R-8, or in accordance with local regulations, and a continuous vapor barrier

    All flexible ducting will have a minimum of R-8, or in accordance with local regulations, and a continuous vapor barrier
  303. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.3: Sizing of new flex

    Replacement ducts will be appropriately sized

    Replacement ducts will be appropriately sized
  304. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.4: Installation of flex

    Flex duct will be supported in accordance with manufacturer specifications and cut to fit with maximum stretch Beaded rigid elbow or equivalent...

    Flex duct will be supported in accordance with manufacturer specifications and cut to fit with maximum stretch Beaded rigid elbow or equivalent...
  305. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.5: Interior liner attachment

    Interior liner of the flex-to-metal connection will be fastened with tie bands using a tie band tensioning tool For oval flexible duct to metal...

    Interior liner of the flex-to-metal connection will be fastened with tie bands using a tie band tensioning tool For oval flexible duct to metal...
  306. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.6: Sealing of interior liner

    UL 181 B-M listed mastic product will be used to seal the connection

    UL 181 B-M listed mastic product will be used to seal the connection
  307. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.7: Attachment of exterior liner

    Liner will be pulled up onto the metal duct as far as possible before securing The exterior liner of the flex duct will be fastened with tie...

    Liner will be pulled up onto the metal duct as far as possible before securing The exterior liner of the flex duct will be fastened with tie...
  308. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.8: Sealing of all accessible ducts

    All accessible joints, seams and connections will be sealed with UL 181 approved mastics

    All accessible joints, seams and connections will be sealed with UL 181 approved mastics
  309. Ducts > Duct Insulation 5.22: Insulating Flex Ducts

    5.22.9: Insulation of all fittings

    All metal fittings including boots, elbows and take-offs will be insulated separately using a minimum of R-8 duct wrap with a vapor barrier...

    All metal fittings including boots, elbows and take-offs will be insulated separately using a minimum of R-8 duct wrap with a vapor barrier...
  310. 5.23 Insulating Metal Ducts

    Topic: Ducts Subtopic: Duct Insulation 5.23 Detail Name: Insulating Metal Ducts Desired Outcome Lowered thermal conductance of duct...

    Topic: Ducts Subtopic: Duct Insulation 5.23 Detail Name: Insulating Metal Ducts Desired Outcome Lowered thermal conductance of duct...
  311. Ducts > Duct Insulation 5.23: Insulating Metal Ducts

    5.23.1: Selection of duct insulation material

    Duct insulation will be a minimum of R-8, in accordance with local code or buried under attic insulation, whichever is a greater R-value, and have an...

    Duct insulation will be a minimum of R-8, in accordance with local code or buried under attic insulation, whichever is a greater R-value, and have an...
  312. Ducts > Duct Insulation 5.23: Insulating Metal Ducts

    5.23.2: Duct sealing

    All accessible ducts will be sealed with a UL-181 mastic before insulation is applied

    All accessible ducts will be sealed with a UL-181 mastic before insulation is applied
  313. Ducts > Duct Insulation 5.23: Insulating Metal Ducts

    5.23.3: Attachment of duct insulation

    Duct insulation will be mechanically fastened (e.g., stitch staples, tie bands) and sealed with no exposed metal Duct insulation will be secured...

    Duct insulation will be mechanically fastened (e.g., stitch staples, tie bands) and sealed with no exposed metal Duct insulation will be secured...
  314. Ducts > Duct Insulation 5.23: Insulating Metal Ducts

    5.23.4: Taping of the vapor barrier

    Using a tape approved by the manufacturer, all seams and connection of the vapor barrier will be taped so that no metal is exposed No gaps will...

    Using a tape approved by the manufacturer, all seams and connection of the vapor barrier will be taped so that no metal is exposed No gaps will...
  315. Ducts > Duct Insulation 5.23: Insulating Metal Ducts

    5.23.5: Vermin proofing

    Vermin access points will be identified and treated appropriately (e.g., seal access holes)

    Vermin access points will be identified and treated appropriately (e.g., seal access holes)
  316. 5.3 Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return Air Pathway

    Topic: Forced Air Subtopic: Design 5.3 Detail Name: Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return...

    Topic: Forced Air Subtopic: Design 5.3 Detail Name: Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return...
  317. Forced Air > Design 5.3: Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return Air Pathway

    5.3.1: Close return air openings

    Existing return air openings will be closed off and sealed with a durable material equivalent in strength to the surrounding material Disturbed...

    Existing return air openings will be closed off and sealed with a durable material equivalent in strength to the surrounding material Disturbed...
  318. Forced Air > Design 5.3: Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return Air Pathway

    5.3.2: Alternate return air system

    Alternate return air opening will be provided to the furnace closet (e.g., replace louvered door or install grilles); whenever possible, follow...

    Alternate return air opening will be provided to the furnace closet (e.g., replace louvered door or install grilles); whenever possible, follow...
  319. Forced Air > Design 5.3: Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return Air Pathway

    5.3.3: Zone pressure test

    Pressures will be measured with the furnace fan operating across interior doors that can be closed and have a supply and/or return behind them ...

    Pressures will be measured with the furnace fan operating across interior doors that can be closed and have a supply and/or return behind them ...
  320. Forced Air > Design 5.3: Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return Air Pathway

    5.3.4: Combustion Appliance Zone (CAZ) testing

    CAZ testing will be performed where combustion appliances are utilized

    CAZ testing will be performed where combustion appliances are utilized
  321. Forced Air > Design 5.3: Replace Return Air Systems that Incorporate Floor Cavity (Belly) and/or Attic as the Return Air Pathway

    5.3.5: Property manager/occupant education

    Property manager/occupant will be educated on changes, how to operate and maintain the system and any potential health concerns (e.g., lead, asbestos)

    Property manager/occupant will be educated on changes, how to operate and maintain the system and any potential health concerns (e.g., lead, asbestos)
  322. 5.4 Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow Air Handler Configurations

    Topic: Ducts Subtopic: Duct Sealing 5.4 Detail Name: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow...

    Topic: Ducts Subtopic: Duct Sealing 5.4 Detail Name: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow...
  323. Ducts > Duct Sealing 5.4: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow Air Handler Configurations

    5.4.1: Work assessment

    Installer pre-work assessment will be conducted to determine: • Size of plenum • Alignment • Connection method • Existing sealing

    Installer pre-work assessment will be conducted to determine: • Size of plenum • Alignment • Connection method • Existing sealing
  324. Ducts > Duct Sealing 5.4: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow Air Handler Configurations

    5.4.2: Preparation

    Debris will be removed Surface will be prepared for work (e.g., remove tape, oil) Floor will be prepared to receive the appropriately sized...

    Debris will be removed Surface will be prepared for work (e.g., remove tape, oil) Floor will be prepared to receive the appropriately sized...
  325. Ducts > Duct Sealing 5.4: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow Air Handler Configurations

    5.4.3: Plenum rebuild or repair

    Plenum will be rebuilt or repaired using compatible materials and will be: • Mechanically fastened • Sealed • Durable • Structurally sound...

    Plenum will be rebuilt or repaired using compatible materials and will be: • Mechanically fastened • Sealed • Durable • Structurally sound...
  326. Ducts > Duct Sealing 5.4: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow Air Handler Configurations

    5.4.4: Repair work access

    Point of access options include: Option 1: Through the trunk duct • Repair and seal access hole in the trunk duct • Install insulation...

    Point of access options include: Option 1: Through the trunk duct • Repair and seal access hole in the trunk duct • Install insulation...
  327. Ducts > Duct Sealing 5.4: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow Air Handler Configurations

    5.4.5: Safety testing

    Equipment will be cycled Combustion Appliance Zone (CAZ) test will be performed where combustion appliances are utilized

    Equipment will be cycled Combustion Appliance Zone (CAZ) test will be performed where combustion appliances are utilized
  328. Ducts > Duct Sealing 5.4: Duct Sealing: Supply Plenum (Furnace to Trunk Duct Connection) in Both Upflow and Downflow Air Handler Configurations

    5.4.6: Performance Testing

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...
  329. 5.5 Duct Sealing: Cross Over Ducts

    Topic: Ducts Subtopic: Duct Sealing 5.5 Detail Name: Duct Sealing: Cross Over Ducts Desired Outcome: Deliver all air from trunk to trunk...

    Topic: Ducts Subtopic: Duct Sealing 5.5 Detail Name: Duct Sealing: Cross Over Ducts Desired Outcome: Deliver all air from trunk to trunk...
  330. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.1: Work assessment

    Installer pre-work assessment will be conducted to determine: • Location • Types • Leakage points

    Installer pre-work assessment will be conducted to determine: • Location • Types • Leakage points
  331. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.2: Flexible cross over duct connections

    Flexible cross over duct connections will be added, rebuilt or repaired using compatible materials and will be: • Mechanically fastened at both...

    Flexible cross over duct connections will be added, rebuilt or repaired using compatible materials and will be: • Mechanically fastened at both...
  332. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.3: Support

    Cross over ducts will be installed so they are not in contact with the ground Cross over ducts will be supported in accordance with flex duct...

    Cross over ducts will be installed so they are not in contact with the ground Cross over ducts will be supported in accordance with flex duct...
  333. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.4: Through-the-rim cross over duct

    Through-the-rim cross over ducts will be located and accessed through the bottom liner and branch duct; all branch cross over duct connections and...

    Through-the-rim cross over ducts will be located and accessed through the bottom liner and branch duct; all branch cross over duct connections and...
  334. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.5: Repair work access for through-the-rim cross over

    Access hole in the trunk duct will be repaired and sealed Insulation will be reinstalled Bottom liner/belly will be repaired

    Access hole in the trunk duct will be repaired and sealed Insulation will be reinstalled Bottom liner/belly will be repaired
  335. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.6: Attic cross over

    Access to the attic will be created for all attic areas that contain cross over ducts, where feasible Plenum boxes and cross over duct connections...

    Access to the attic will be created for all attic areas that contain cross over ducts, where feasible Plenum boxes and cross over duct connections...
  336. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.7: Combustion Appliance Zone (CAZ) testing

    CAZ testing will be performed where combustion appliances are utilized

    CAZ testing will be performed where combustion appliances are utilized
  337. Ducts > Duct Sealing 5.5: Duct Sealing: Cross Over Ducts

    5.5.8: Performance Testing

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...
  338. 5.6 Duct Sealing: Hard and Flex Branch Ducts

    Topic: Ducts Subtopic: Duct Sealing 5.6 Detail Name: Duct Sealing: Hard and Flex Branch Ducts Desired Outcome: Deliver air from trunk to...

    Topic: Ducts Subtopic: Duct Sealing 5.6 Detail Name: Duct Sealing: Hard and Flex Branch Ducts Desired Outcome: Deliver air from trunk to...
  339. Ducts > Duct Sealing 5.6: Duct Sealing: Hard and Flex Branch Ducts

    5.6.1: Work assessment

    Installer pre-work assessment will be conducted to determine: • Location • Connection types • Leakage points Access holes will be created for...

    Installer pre-work assessment will be conducted to determine: • Location • Connection types • Leakage points Access holes will be created for...
  340. Ducts > Duct Sealing 5.6: Duct Sealing: Hard and Flex Branch Ducts

    5.6.2: Reduce excess flex duct length

    Excess flex duct will be removed between the take off at trunk and floor register boot

    Excess flex duct will be removed between the take off at trunk and floor register boot
  341. Ducts > Duct Sealing 5.6: Duct Sealing: Hard and Flex Branch Ducts

    5.6.3: Duct connection repairs

    Hard and flex duct branch connections will be rebuilt or repaired using compatible materials and will be mechanically fastened and sealed Ends...

    Hard and flex duct branch connections will be rebuilt or repaired using compatible materials and will be mechanically fastened and sealed Ends...
  342. Ducts > Duct Sealing 5.6: Duct Sealing: Hard and Flex Branch Ducts

    5.6.4: Repair work access

    Access hole in the trunk/branch duct will be repaired and sealed Insulation will be reinstalled Bottom liner/belly will be repaired

    Access hole in the trunk/branch duct will be repaired and sealed Insulation will be reinstalled Bottom liner/belly will be repaired
  343. Ducts > Duct Sealing 5.6: Duct Sealing: Hard and Flex Branch Ducts

    5.6.5: Combustion Appliance Zone (CAZ) testing

    CAZ testing will be performed where combustion appliances are utilized

    CAZ testing will be performed where combustion appliances are utilized
  344. Ducts > Duct Sealing 5.6: Duct Sealing: Hard and Flex Branch Ducts

    5.6.6: Performance Testing

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...

    Pre and post retrofit duct leakage will be performance tested using a duct blaster or pressure pan and results will be documented and reported to the...
  345. 5.7 Ducts: Insulation and Vapor Barrier

    Topic: Ducts Subtopic: Duct Insulation 5.7 Detail Name: Ducts: Insulation and Vapor Barrier Desired Outcome: Minimize condensation

    Topic: Ducts Subtopic: Duct Insulation 5.7 Detail Name: Ducts: Insulation and Vapor Barrier Desired Outcome: Minimize condensation
  346. Ducts > Duct Insulation 5.7: Ducts: Insulation and Vapor Barrier

    5.7.1: Ducts in unconditioned spaces (e.g., crawl space, attic, unconditioned basements)

    Ducts will have continuous insulation and vapor barrier Insulation will be sufficient to prevent dew point on surface of ducts

    Ducts will have continuous insulation and vapor barrier Insulation will be sufficient to prevent dew point on surface of ducts
  347. Ducts > Duct Insulation 5.7: Ducts: Insulation and Vapor Barrier

    5.7.2: Ducts within floor assemblies

    Inspection and/or testing will be conducted to determine whether ducts are within thermal, pressure and vapor boundary If ducts are within...

    Inspection and/or testing will be conducted to determine whether ducts are within thermal, pressure and vapor boundary If ducts are within...
  348. Ducts > Duct Insulation 5.7: Ducts: Insulation and Vapor Barrier

    5.7.3: Exposed metal

    All exposed metal will have continuous insulation and vapor retarder

    All exposed metal will have continuous insulation and vapor retarder
  349. 5.8 Combustion Analysis of Gas-Fired Appliances (LP and Natural Gas)

    Topic: Heating and Cooling Subtopic: Commissioning of Equipment 5.8 Detail Name: Combustion Analysis of Gas-Fired Appliances (LP and Natural...

    Topic: Heating and Cooling Subtopic: Commissioning of Equipment 5.8 Detail Name: Combustion Analysis of Gas-Fired Appliances (LP and Natural...
  350. Heating and Cooling > Commissioning of Equipment 5.8: Combustion Analysis of Gas-Fired Appliances

    5.8.1: Place appliance in operation

    Heating equipment will be placed in operation in accordance with applicable NFPA standards and manufacturer specifications when available

    Heating equipment will be placed in operation in accordance with applicable NFPA standards and manufacturer specifications when available
  351. Heating and Cooling > Commissioning of Equipment 5.8: : Combustion Analysis of Gas-Fired Appliances (LP and Natural Gas)

    5.8.2: Gas pressure

    Measurement will be verified by a certified professional in accordance with fuel type and manufacturer specifications

    Measurement will be verified by a certified professional in accordance with fuel type and manufacturer specifications
  352. Heating and Cooling > Commissioning of Equipment 5.8: : Combustion Analysis of Gas-Fired Appliances (LP and Natural Gas)

    5.8.3: Carbon dioxide (CO2) and oxygen (O2)

    Measurement will be verified in accordance with industry manuals (e.g., Testo, Bacharach)

    Measurement will be verified in accordance with industry manuals (e.g., Testo, Bacharach)
  353. Heating and Cooling > Commissioning of Equipment 5.8: : Combustion Analysis of Gas-Fired Appliances (LP and Natural Gas)

    5.8.4: Excess combustion air

    Excess combustion air will be calculated and verified in accordance with industry manuals (e.g., Testo, Bacharach)

    Excess combustion air will be calculated and verified in accordance with industry manuals (e.g., Testo, Bacharach)
  354. Heating and Cooling > Commissioning of Equipment 5.8: : Combustion Analysis of Gas-Fired Appliances (LP and Natural Gas)

    5.8.5: Carbon monoxide (CO) in flue gas

    CO in the undiluted flue gas will be less than 100 ppm

    CO in the undiluted flue gas will be less than 100 ppm
  355. Heating and Cooling > Commissioning of Equipment 5.8: : Combustion Analysis of Gas-Fired Appliances (LP and Natural Gas)

    5.8.6: Testing/inspection holes

    All testing and inspection holes will be sealed with manufacturer approved materials

    All testing and inspection holes will be sealed with manufacturer approved materials
  356. 5.9 Heating and Cooling Worker Safety

    Topic: Health and Safety Subtopic: Safe Work Practices 5.9 Detail Name: Heating and Cooling Worker Safety (3) Desired Outcome Work...

    Topic: Health and Safety Subtopic: Safe Work Practices 5.9 Detail Name: Heating and Cooling Worker Safety (3) Desired Outcome Work...
  357. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.1: Worker safety

    Worker safety specifications in Global Worker Safety section will be followed

    Worker safety specifications in Global Worker Safety section will be followed
  358. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.2: Mercury

    Identify any mercury-containing thermostats and dispose of or recycle in accordance with Environmental Protection Agency (EPA) guidance

    Identify any mercury-containing thermostats and dispose of or recycle in accordance with Environmental Protection Agency (EPA) guidance
  359. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.3: Asbestos

    Suspected asbestos hazards will be identified in furnaces (e.g., gaskets), wood stoves, zonal heating devices, electrical wiring insulation, boilers...

    Suspected asbestos hazards will be identified in furnaces (e.g., gaskets), wood stoves, zonal heating devices, electrical wiring insulation, boilers...
  360. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.4: Protective gear

    Gloves will be worn when working with metal ducts Workers will wear personal protective equipment (PPE) as needed to protect themselves against...

    Gloves will be worn when working with metal ducts Workers will wear personal protective equipment (PPE) as needed to protect themselves against...
  361. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.5: Combustible gas detection

    Worker will check for presence of combustible gas leaks before work begins Leaks will be repaired before work is performed

    Worker will check for presence of combustible gas leaks before work begins Leaks will be repaired before work is performed
  362. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.6: Carbon monoxide (CO)

    Workers will check for presence of ambient CO before and during work CO issues will be addressed before work is performed or continued

    Workers will check for presence of ambient CO before and during work CO issues will be addressed before work is performed or continued
  363. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.7: Sealant

    Pipes will be sealed by a certified professional with an approved fastening process and sealant in accordance with manufacturer specifications...

    Pipes will be sealed by a certified professional with an approved fastening process and sealant in accordance with manufacturer specifications...
  364. Heating and Cooling > Safe Work Practices 5.9: Heating and Cooling Worker Safety (3)

    5.9.8: Safety devices

    A secondary LP safety detector system (valve, exhaust fan, alarm light) will be installed by a certified professional for propane piping installed...

    A secondary LP safety detector system (valve, exhaust fan, alarm light) will be installed by a certified professional for propane piping installed...
  365. 6.1 Prepare Belly Floor Cavity for Insulation

    Topic: Belly Subtopic: Preparation Insulation 6.1 Detail Name: Prepare Belly Floor Cavity for Insulation Desired Outcome: Belly floor...

    Topic: Belly Subtopic: Preparation Insulation 6.1 Detail Name: Prepare Belly Floor Cavity for Insulation Desired Outcome: Belly floor...
  366. Belly > Preparation 6.1: Prepare Belly Floor Cavity for Insulation

    6.1.1: Work assessment

    Gas, water, waste, electrical lines will be checked for: - Plumbing leaks - Gas/oil leaks - Attachment - Standing water - Raw sewage - Pests

    Gas, water, waste, electrical lines will be checked for: - Plumbing leaks - Gas/oil leaks - Attachment - Standing water - Raw sewage - Pests
  367. Belly > Preparation 6.1: Prepare Belly Floor Cavity for Insulation

    6.1.2: Preparation

    Where bottom board/rodent material is missing or damaged and accessible, the following will be ensured: Duct sealing completed Gas, water and...

    Where bottom board/rodent material is missing or damaged and accessible, the following will be ensured: Duct sealing completed Gas, water and...
  368. 6.10 Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via Exterior Access from Top of Roof)

    Topic: Attics Subtopic: Attic Ceilings 6.10 Detail Name: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via...

    Topic: Attics Subtopic: Attic Ceilings 6.10 Detail Name: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via...
  369. Attics > Attic Ceiling 6.10: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via Exterior Access from Top of Roof)

    6.10.1: Attic, ceiling and roof verification

    All combustion appliance flues will be terminated to the outdoors and terminations will maintain proper clearance above snow loads A distance no...

    All combustion appliance flues will be terminated to the outdoors and terminations will maintain proper clearance above snow loads A distance no...
  370. Attics > Attic Ceiling 6.10: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via Exterior Access from Top of Roof)

    6.10.2: Attic access

    Access to the attic cavity will be created using one of these methods: • Drilling • Cutting • Continuous slicing along the center line (at the...

    Access to the attic cavity will be created using one of these methods: • Drilling • Cutting • Continuous slicing along the center line (at the...
  371. Attics > Attic Ceiling 6.10: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via Exterior Access from Top of Roof)

    6.10.3: Blowing machine set up

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set in accordance with...

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set in accordance with...
  372. Attics > Attic Ceiling 6.10: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via Exterior Access from Top of Roof)

    6.10.4: Fiberglass blown insulation installation

    Insulation will be installed to a density of 1.5 to 1.6 pounds per cubic foot Using fill tube, 100% of each cavity will be filled to a consistent...

    Insulation will be installed to a density of 1.5 to 1.6 pounds per cubic foot Using fill tube, 100% of each cavity will be filled to a consistent...
  373. Attics > Attic Ceiling 6.10: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via Exterior Access from Top of Roof)

    6.10.5: Patching and sealing openings

    If the roof is sliced: A solid metal ridge cap will be centered over the slice A flexible and durable sealant will be sandwiched between the roof...

    If the roof is sliced: A solid metal ridge cap will be centered over the slice A flexible and durable sealant will be sandwiched between the roof...
  374. Attics > Attic Ceiling 6.10: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (via Exterior Access from Top of Roof)

    6.10.6: Verification of details

    Installation process will be considered complete when installer has verified that damage has not occurred to the roof or ceiling assemblies during...

    Installation process will be considered complete when installer has verified that damage has not occurred to the roof or ceiling assemblies during...
  375. 6.11 Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    Topic: Insulation Subtopic: Attic Insulation 6.11 Detail Name: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via...

    Topic: Insulation Subtopic: Attic Insulation 6.11 Detail Name: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via...
  376. Insulation > Attic Insulation 6.11: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    6.11.1: Attic, ceiling and roof verification

    All combustion appliance flues will be terminated to the exterior of the house and terminations will maintain proper clearance above snow loads A...

    All combustion appliance flues will be terminated to the exterior of the house and terminations will maintain proper clearance above snow loads A...
  377. Insulation > Attic Insulation 6.11: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    6.11.2: Construction prep

    Special precautions will be taken to limit fiberglass and construction dust exposure to the occupant and occupant belongings

    Special precautions will be taken to limit fiberglass and construction dust exposure to the occupant and occupant belongings
  378. Insulation > Attic Insulation 6.11: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    6.11.3: Attic access

    Equidistant holes will be drilled in a straight row parallel to the longitudinal exterior wall of the ceiling If a longitudinal ceiling trim...

    Equidistant holes will be drilled in a straight row parallel to the longitudinal exterior wall of the ceiling If a longitudinal ceiling trim...
  379. Insulation > Attic Insulation 6.11: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    6.11.4: Blowing machine set up

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set in accordance with...

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set in accordance with...
  380. Insulation > Attic Insulation 6.11: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    6.11.5: Fiberglass blown insulation installation

    Insulation will be installed to a density of 1.5 to 1.6 pounds per cubic foot Using fill tube, 100% of each cavity will be filled to a consistent...

    Insulation will be installed to a density of 1.5 to 1.6 pounds per cubic foot Using fill tube, 100% of each cavity will be filled to a consistent...
  381. Insulation > Attic Insulation 6.11: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    6.11.6: Patching and sealing holes

    Holes will be plugged or covered and sealed to be aesthetically pleasing If existing trim was removed, it will be reinstalled

    Holes will be plugged or covered and sealed to be aesthetically pleasing If existing trim was removed, it will be reinstalled
  382. Insulation > Attic Insulation 6.11: Installing Fiberglass Blown Insulation for Flat, Bowed or Vaulted Ceilings (Via Interior Access Through the Ceiling)

    6.11.7: Verification of details

    Installation process will be considered complete when installer has verified that damage has not occurred to the roof or ceiling assemblies during...

    Installation process will be considered complete when installer has verified that damage has not occurred to the roof or ceiling assemblies during...
  383. 6.12 Installing Fiberglass Blown Insulation in Roof-Over Constructions

    Topic: Attics Subtopic: Attic Insulation 6.12 Detail Name: Installing Fiberglass Blown Insulation in Roof-Over Constructions Desired...

    Topic: Attics Subtopic: Attic Insulation 6.12 Detail Name: Installing Fiberglass Blown Insulation in Roof-Over Constructions Desired...
  384. Attics > Attic Insulation 6.12: Installing Fiberglass Blown Insulation in Roof-Over Constructions

    6.12.1: Roof-over overview

    If occupant will allow access from interior, installation through the ceiling is preferred Attic space created by the roof-over will be accessed...

    If occupant will allow access from interior, installation through the ceiling is preferred Attic space created by the roof-over will be accessed...
  385. 6.13 Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    Topic: Attic Subtopic: Attic Transition Walls 6.13 Detail Name: Installing Insulation at Flat and Cathedral Ceiling Transition Wall Desired...

    Topic: Attic Subtopic: Attic Transition Walls 6.13 Detail Name: Installing Insulation at Flat and Cathedral Ceiling Transition Wall Desired...
  386. Attics > Attic Transition Walls 6.13: Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    6.13.1: Insulation installation verification

    A visual inspection of the highest point of the transition wall will be completed Access points will be determined from the gable end, roof,...

    A visual inspection of the highest point of the transition wall will be completed Access points will be determined from the gable end, roof,...
  387. Attics > Attic Transition Walls 6.13: Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    6.13.2: Access attic

    Attic will be accessed through the location that allows the most efficient and effective insulation coverage

    Attic will be accessed through the location that allows the most efficient and effective insulation coverage
  388. Attics > Attic Transition Walls 6.13: Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    6.13.3: Blowing

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Insulation will be blown against the transition wall...

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Insulation will be blown against the transition wall...
  389. Attics > Attic Transition Walls 6.13: Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    6.13.4: Spray two-part foam

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Spray polyurethane foam (SPF) will be applied to...

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Spray polyurethane foam (SPF) will be applied to...
  390. Attics > Attic Transition Walls 6.13: Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    6.13.5: Batt

    Batt insulation will be installed in accordance with manufacturer specifications without gaps, voids, compressions, misalignments or wind intrusions ...

    Batt insulation will be installed in accordance with manufacturer specifications without gaps, voids, compressions, misalignments or wind intrusions ...
  391. Attics > Attic Transition Walls 6.13: Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    6.13.6: Patching and sealing access points

    Created access points will be covered and sealed in an aesthetically pleasing manner Existing access points (e.g., gable vent) will be returned to...

    Created access points will be covered and sealed in an aesthetically pleasing manner Existing access points (e.g., gable vent) will be returned to...
  392. Attics > Attic Transition Walls 6.13: Installing Insulation at Flat and Cathedral Ceiling Transition Wall

    6.13.7: Verification of details

    Installation process will be considered complete when installer has verified that damage has not occurred to the roof or ceiling assemblies during...

    Installation process will be considered complete when installer has verified that damage has not occurred to the roof or ceiling assemblies during...
  393. 6.14 Exterior Dense Pack

    Topic: Walls Subtopic: Exterior Wall Insulation 6.14 Detail Name: Exterior Dense Pack Desired Outcome Walls properly prepared to...

    Topic: Walls Subtopic: Exterior Wall Insulation 6.14 Detail Name: Exterior Dense Pack Desired Outcome Walls properly prepared to...
  394. Walls > Exterior Wall Insulation 6.14: Exterior Dense Pack

    6.14.1: Preparation

    Lead safety procedures will be followed Cavities will be free of hazards, intact and able to support dense pack pressures Drilling hazards...

    Lead safety procedures will be followed Cavities will be free of hazards, intact and able to support dense pack pressures Drilling hazards...
  395. Walls > Exterior Wall Insulation 6.14: Exterior Dense Pack

    6.14.2: Exterior dense pack

    Using fill tube, 100% of each cavity will be filled to a consistent density: Blown fiber glass, mineral fiber, rock and slag wool or spray foam...

    Using fill tube, 100% of each cavity will be filled to a consistent density: Blown fiber glass, mineral fiber, rock and slag wool or spray foam...
  396. 6.2 Insulation of Floor Cavity with Blown Material

    Topic: Belly Subtopic: Floor Cavity Insulation 6.2 Detail Name: Insulation of Floor Cavity with Blown Material Desired Outcome: Consistent...

    Topic: Belly Subtopic: Floor Cavity Insulation 6.2 Detail Name: Insulation of Floor Cavity with Blown Material Desired Outcome: Consistent...
  397. Belly > Floor Cavity Insulation 6.2: Insulation of Floor Cavity with Blown Material

    6.2.1: R-value

    Insulation will be installed in accordance with recommended R-value and density

    Insulation will be installed in accordance with recommended R-value and density
  398. Belly > Floor Cavity Insulation 6.2: Insulation of Floor Cavity with Blown Material

    6.2.2: Work assessment

    Road barrier must be intact and free from holes and capable of supporting the insulation

    Road barrier must be intact and free from holes and capable of supporting the insulation
  399. Belly > Floor Cavity Insulation 6.2: Insulation of Floor Cavity with Blown Material

    6.2.3: Insulate floors

    Each cavity will be insulated to specified R-value and density The number of bags installed will be confirmed and will match the number required...

    Each cavity will be insulated to specified R-value and density The number of bags installed will be confirmed and will match the number required...
  400. Belly > Floor Cavity Insulation 6.2: Insulation of Floor Cavity with Blown Material

    6.2.4: Materials

    Flame spread index of selected materials will not exceed 25 with an accompanying smoke-developed index not to exceed 450 when tested in accordance...

    Flame spread index of selected materials will not exceed 25 with an accompanying smoke-developed index not to exceed 450 when tested in accordance...
  401. Belly > Floor Cavity Insulation 6.2: Insulation of Floor Cavity with Blown Material

    6.2.5: Occupant education

    Documentation of material and R-value will be provided to occupant

    Documentation of material and R-value will be provided to occupant
  402. 6.3 Insulation of Floor Cavity with Batt Material

    Topic: Belly Subtopic: Floor Cavity Insulation 6.3 Detail Name: Insulation of Floor Cavity with Batt Material Desired Outcome: Consistent...

    Topic: Belly Subtopic: Floor Cavity Insulation 6.3 Detail Name: Insulation of Floor Cavity with Batt Material Desired Outcome: Consistent...
  403. Belly > Floor Cavity Insulation 6.3: Insulation of Floor Cavity with Batt Material

    6.3.1: R-value

    Insulation will be installed in accordance with recommended R-value and density

    Insulation will be installed in accordance with recommended R-value and density
  404. Belly > Floor Cavity Insulation 6.3: Insulation of Floor Cavity with Batt Material

    6.3.2: Work assessment

    Ensure complete accessibility of floor cavity Clean floor cavities Remove all remnants of previous insulation and bottom board

    Ensure complete accessibility of floor cavity Clean floor cavities Remove all remnants of previous insulation and bottom board
  405. Belly > Floor Cavity Insulation 6.3: Insulation of Floor Cavity with Batt Material

    6.3.3: Insulate floors

    Each cavity will be insulated to specified R-value and density If insulation has facing, facing will be in contact with the heated side ...

    Each cavity will be insulated to specified R-value and density If insulation has facing, facing will be in contact with the heated side ...
  406. Belly > Floor Cavity Insulation 6.3: Insulation of Floor Cavity with Batt Material

    6.3.4: Materials

    Insulation materials will be of minimal water absorbency and flame spread and smoke-developed index for insulation will be in accordance with IRC...

    Insulation materials will be of minimal water absorbency and flame spread and smoke-developed index for insulation will be in accordance with IRC...
  407. Belly > Floor Cavity Insulation 6.3: Insulation of Floor Cavity with Batt Material

    6.3.5: Occupant education

    Documentation of material and R-value will be provided to occupant

    Documentation of material and R-value will be provided to occupant
  408. 6.4 Insulation of floor cavity with spray foam material

    Topic: Belly Subtopic: Floor Cavity Insulation 6.4 Detail Name: Insulation of floor cavity with spray foam material Desired Outcome:...

    Topic: Belly Subtopic: Floor Cavity Insulation 6.4 Detail Name: Insulation of floor cavity with spray foam material Desired Outcome:...
  409. Belly > Floor Cavity Insulation 6.4: Insulation of floor cavity with spray foam material

    6.4.1: R-value

    Insulation will be installed in accordance with recommended R-value

    Insulation will be installed in accordance with recommended R-value
  410. Belly > Floor Cavity Insulation 6.4: Insulation of floor cavity with spray foam material

    6.4.2: Work assessment

    Ensure complete accessibility of floor cavity Clean floor cavities Remove all remnants of previous insulation and bottom board

    Ensure complete accessibility of floor cavity Clean floor cavities Remove all remnants of previous insulation and bottom board
  411. Belly > Floor Cavity Insulation 6.4: Insulation of floor cavity with spray foam material

    6.4.3: Preparation

    All floor areas will be open and accessible for spray foam application Any openings in the subfloor larger than ¼” will be covered with...

    All floor areas will be open and accessible for spray foam application Any openings in the subfloor larger than ¼” will be covered with...
  412. Belly > Floor Cavity Insulation 6.4: Insulation of floor cavity with spray foam material

    6.4.4: Installation

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications In accordance with manufacturer specifications,...

    Insulation will be installed to prescribed R-value in accordance with manufacturer specifications In accordance with manufacturer specifications,...
  413. Belly > Floor Cavity Insulation 6.4: Insulation of floor cavity with spray foam material

    6.4.5: Materials

    Insulation will be installed in accordance with manufacturer specifications Flame spread index of selected materials will not exceed 25 with an...

    Insulation will be installed in accordance with manufacturer specifications Flame spread index of selected materials will not exceed 25 with an...
  414. Belly > Floor Cavity Insulation 6.4: Insulation of floor cavity with spray foam material

    6.4.6: Fire protection

    Spray foam will be separated from the occupied space of the building with a 15-minute thermal barrier (typically 15/32” sheathing, 1/2” gypsum board...

    Spray foam will be separated from the occupied space of the building with a 15-minute thermal barrier (typically 15/32” sheathing, 1/2” gypsum board...
  415. Belly > Floor Cavity Insulation 6.4: Insulation of floor cavity with spray foam material

    6.4.7: Occupant education

    Documentation of material and R-value will be provided to occupant

    Documentation of material and R-value will be provided to occupant
  416. 6.5 Stuffing Wall Cavities with Fiberglass Batts

    Topic: Walls Subtopic: Exterior Wall Insulation 6.5 Detail Name: Stuffing Wall Cavities with Fiberglass Batts Desired Outcome: Consistent...

    Topic: Walls Subtopic: Exterior Wall Insulation 6.5 Detail Name: Stuffing Wall Cavities with Fiberglass Batts Desired Outcome: Consistent...
  417. Walls > Exterior Wall Insulation 6.5: Stuffing Wall Cavities with Fiberglass Batts

    6.5.1: Access wall cavities

    If skirting overlaps siding, skirting will be detached to allow access to the wall cavity Fasteners will be removed from the bottom of the siding,...

    If skirting overlaps siding, skirting will be detached to allow access to the wall cavity Fasteners will be removed from the bottom of the siding,...
  418. Walls > Exterior Wall Insulation 6.5: Stuffing Wall Cavities with Fiberglass Batts

    6.5.2: Exterior wall cavity inspection

    Wall cavities will be inspected for moisture damage, pests, location and integrity of the wiring and holes to the interior and repaired as necessary...

    Wall cavities will be inspected for moisture damage, pests, location and integrity of the wiring and holes to the interior and repaired as necessary...
  419. Walls > Exterior Wall Insulation 6.5: Stuffing Wall Cavities with Fiberglass Batts

    6.5.3: Fiberglass batt installation tool (stuffer)

    A sheet of Lexan (polycarbonate) will be cut to the following specifications to create a stuffer tool: Approximately 1’ x 8’ x ¼” with a 5...

    A sheet of Lexan (polycarbonate) will be cut to the following specifications to create a stuffer tool: Approximately 1’ x 8’ x ¼” with a 5...
  420. Walls > Exterior Wall Insulation 6.5: Stuffing Wall Cavities with Fiberglass Batts

    6.5.4: Fiberglass batt installation

    Thickness of the batt will fill the void without deforming siding or damaging structure Fiberglass batts will fill the cavity (e.g., batt may be...

    Thickness of the batt will fill the void without deforming siding or damaging structure Fiberglass batts will fill the cavity (e.g., batt may be...
  421. Walls > Exterior Wall Insulation 6.5: Stuffing Wall Cavities with Fiberglass Batts

    6.5.5: Subsheating patch and repair

    Sub sheathing will be patched or repaired as necessary

    Sub sheathing will be patched or repaired as necessary
  422. Walls > Exterior Wall Insulation 6.5: Stuffing Wall Cavities with Fiberglass Batts

    6.5.6: Reattachment

    If skirting was removed, skirting will be reinstalled to shed water to the outside of the skirting Siding will be reattached with new fasteners ...

    If skirting was removed, skirting will be reinstalled to shed water to the outside of the skirting Siding will be reattached with new fasteners ...
  423. 6.6 Fiberglass Blown Insulation Installation (Lifting Siding)

    Topic: Walls Subtopic: Exterior Wall Insulation 6.6 Detail Name: Fiberglass Blown Insulation Installation (Lifting Siding) Desired Outcome:...

    Topic: Walls Subtopic: Exterior Wall Insulation 6.6 Detail Name: Fiberglass Blown Insulation Installation (Lifting Siding) Desired Outcome:...
  424. Walls > Exterior Wall Insulation 6.6: Fiberglass Blown Insulation Installation (Lifting Siding)

    6.6.1: Access wall cavities

    If skirting overlaps siding, skirting will be removed Fasteners will be removed from the bottom of the siding, working upward until the siding can...

    If skirting overlaps siding, skirting will be removed Fasteners will be removed from the bottom of the siding, working upward until the siding can...
  425. Walls > Exterior Wall Insulation 6.6: Fiberglass Blown Insulation Installation (Lifting Siding)

    6.6.2: Exterior wall cavity inspection

    Installer pre-work assessment will be conducted to determine: - Moisture damage - Presence of infestation or pests - Location and integrity of...

    Installer pre-work assessment will be conducted to determine: - Moisture damage - Presence of infestation or pests - Location and integrity of...
  426. Walls > Exterior Wall Insulation 6.6: Fiberglass Blown Insulation Installation (Lifting Siding)

    6.6.3: Blowing machine set up

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set according to...

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set according to...
  427. Walls > Exterior Wall Insulation 6.6: Fiberglass Blown Insulation Installation (Lifting Siding)

    6.6.4: Fiberglass blown insulation installation

    Insulation will meet a flame spread rating of 25 or less and a smoke development rating of 450 or less when tested in accordance with ASTM E84 ...

    Insulation will meet a flame spread rating of 25 or less and a smoke development rating of 450 or less when tested in accordance with ASTM E84 ...
  428. Walls > Exterior Wall Insulation 6.6: Fiberglass Blown Insulation Installation (Lifting Siding)

    6.6.5: Sub sheathing patch and repair

    Sub sheathing will be patched or repaired as necessary

    Sub sheathing will be patched or repaired as necessary
  429. Walls > Exterior Wall Insulation 6.6: Fiberglass Blown Insulation Installation (Lifting Siding)

    6.6.6: Reattachment

    If skirting was removed, skirting will be reinstalled to shed water to the outside of the skirting Siding will be reattached with new fasteners ...

    If skirting was removed, skirting will be reinstalled to shed water to the outside of the skirting Siding will be reattached with new fasteners ...
  430. 6.7 Fiberglass Blown Insulation Installation (via penetrations through or behind the siding)

    Topic: Walls Subtopic: Exterior Wall Insulation 6.7 Detail Name: Fiberglass Blown Insulation Installation (via penetrations through or behind...

    Topic: Walls Subtopic: Exterior Wall Insulation 6.7 Detail Name: Fiberglass Blown Insulation Installation (via penetrations through or behind...
  431. Walls > Exterior Wall Insulation 6.7: Fiberglass Blown Insulation Installation (via penetrations through or behind the siding)

    6.7.1: Access wall cavities

    With T-111, OSB or plywood type siding: Access to exterior wall cavities will be gained and sheathing will be drilled as needed and probed to...

    With T-111, OSB or plywood type siding: Access to exterior wall cavities will be gained and sheathing will be drilled as needed and probed to...
  432. Walls > Exterior Wall Insulation 6.7: Fiberglass Blown Insulation Installation (via penetrations through or behind the siding)

    6.7.2: Exterior wall cavity inspection

    Installer pre-work assessment will be conducted to determine: - Moisture damage - Presence of infestation or pests - Location and integrity of...

    Installer pre-work assessment will be conducted to determine: - Moisture damage - Presence of infestation or pests - Location and integrity of...
  433. Walls > Exterior Wall Insulation 6.7: Fiberglass Blown Insulation Installation (via penetrations through or behind the siding)

    6.7.3: Blowing machine set up

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set in accordance with...

    Blowing machine pressure test will be performed with air on full, feed off and gate closed Hose outlet pressure will be set in accordance with...
  434. Walls > Exterior Wall Insulation 6.7: Fiberglass Blown Insulation Installation (via penetrations through or behind the siding)

    6.7.4: Fiberglass blown insulation installation

    Flame spread and smoke-developed index for insulation will meet a flame spread rating of 25 or less and a smoke development rating of 450 or less...